N3319120R4013 Amendment 0005.pdf
PDF 47 KB Posted
- Solicitation number
- N3319120R4013
About this file
This amendment to a solicitation provides additional details for a design-build contract to construct an additional floor on an existing hematology clinic in Skopje, North Macedonia. The amendment requires offerors to assume that constructing the additional floor will require reinforcement of 60% of the existing building structure to increase its load capacity, and to obtain necessary approvals from the Institute of Earthquake Engineering and Engineering Seismology of North Macedonia on the design, execution, and completion of the work. Offerors are also instructed to propose a light-weight construction design for the new floor where technically possible. The Navy is the contracting agency through the Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3319120R4013 Amendment 0004.pdf | ||
| N3319120R4013 Amendment 0003.pdf | ||
| N3319120R4013 Attachment to Amendment 0002.docx | DOCX document | |
| N3319120R4013 Amendment 0002.pdf | ||
| N3319120R4013 Amendment 0001.pdf | ||
| N3319120R4013 Attach 2 - PPI.docx | DOCX document | |
| N3319120R4013 Attach 3 - Price Schedule.doc | DOC document | |
| N3319120R4013 Solicitation.pdf | ||
| N3319120R4013 Attach 5 - Safety Checklist.docx | DOCX document | |
| N3319120R4013 Attach 6 - PPQ.docx | DOCX document | |
| N3319120R4013 Attach 4 - Data Sheet.docx | DOCX document | |
| N3319120R4013 Attach 1 - PTS Hematology Skopje.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3319120R4013 D-B Renovate Hematology Clinic, Skopje, North Macedonia
Amendment 0005
The purpose of this modification is to provide a response to pre-proposal inquiry (PPI)
QUESTION#1
RFP Attachment 1, Page 22 of 114, 3.6. STRUCTURE AND BASIS OF DESIGN FOR NEW CONSTRUCTION says that “it can be concluded that there are fitting conditions for construction of an additional story at the existing building of the РНІ Clinic for hematology -Skopje.” Furthermore, the report of IZIIS (Institute of Earthquake Engineering and Engineering Seismology of North Macedonia) that is in Macedonian language and provided by the Amendment 2 clearly states that the building is built before 1981 (that is the year when the building regulations are changed) and it is a building with limited and unknown load capacity which is crucial in determining its stability today. Furthermore the report states that in order to build an additional floor the new regulations apply. That is to say, there is a need of a detailed analysis of the structure of the building, the quality of building materials as well as geotechnical and other analysis on the building site. In the end it is clearly stated that you can determine the most suitable construction method only after all these analysis are done, and there can be 3 possible cases:
1. Building without any reinforcement of the construction elements of the existing parts,
2. Building with reconstruction of the building elements of the existing parts as needed
3. Building with an outer independent construction system not affecting the existing building construction elements vertically and horizontally
Nevertheless, It is our understanding that NAVFAC request competitors to prepare their proposals considering that the additional floor will be constructed on the roof of the existing structure without any reinforcement applied to the existing structural system and if after the award and during the detailed design stage, a necessity to make such a reinforcement arises, as described in the IZIIS report item 2 and 3 given above, then the resulting time and cost impact will be a subject of a modification. We Kindly request for your confirmation, if not further explanation.
ANSWER:
As stated in paragraph 1.5 of the Performance Technical Specifications, the company that receives the award of the contract shall hire the services of architect/engineers licensed in North Macedonia to design all construction works included in the contract. This company needs to be familiar with the administrative procedures necessary for the competent authorities to be able to receive and accept the different documents, in order to obtain all the necessary permits and authorizations. This includes the structure of the new floor and its supporting base.
The analysis of the existing structure of the building, the quality of building materials as well the geotechnical analysis on the building site is something required by law in North Macedonia and the company that receives the award is required, as part of this contract, to prepare and submit together with the Project for Construction Statics to IZIIS (Institute of Earthquake Engineering and Engineering Seismology of North Macedonia) in order to obtain approval. This agency needs to review and validate elements such as projected degree of mechanical resistance, stability and seismic protection (MPS). This documents and reports are parts of the design itself which is obligation of the future Contractor.
Based on this question, the Ministry of Health requested additional expert opinion from a Professor from the Faculty of Civil Engineering, University "Cyril and Methodious" who confirmed this information.
The company that receives the award of the contract shall perform all necessary testing, inspection, calculations and designs in order to provide a new floor on top of the existing building. The amount of reinforcement is a function of the building condition, but also of the type of construction elements to be selected for the new floor. Consequently the design of the potential reinforcement of the building cannot be estimated without the design/weight of the new construction.
For estimating purposes, from a qualitative aspect the offerors shall assume alternative 2: “Building with reconstruction of the building elements of the existing parts as needed”. From quantitative aspect, the offerors shall assume reinforcement on 60% of the building structure to increase the load bearing capacity of the existing structure to support the additional weight represented by the additional floor. Less than 60% reinforcement is acceptable if, and only if, the full design package is approved as per regulations of North Macedonia.
However, the design or the reinforcement of the existing structure and the design of the structure of the new floor shall be a single design. The contractor shall also assume light weight construction for additional floor, as much as technically possible.
The general basis of design shall be full compliance with regulations of North Macedonia, with special emphasis on the strict seismic requirements.
It is a requirement of this contract to obtain IZIIS approval on the design and their approval on the execution of the works and their approval on the completed works.
As stated in paragraph 4.14, no payment shall be authorized for design until the company who receives the award provides a copy (paper and digital) of the full construction project, together with the corresponding Construction Permit.
The company that receives the award shall include a line item in the Schedule of Prices for minimum 4% of the contract value for “IZIIS Approval of Completed Works” that shall be paid only after IZIIS provides the final acceptance on the completed works.