N3319120R4013 Amendment 0001.pdf

PDF 296 KB Posted

Attached to
D-B Construct Additional Floor in Hematology Clinic, Skopje, North Macedonia
Solicitation number
N3319120R4013
Issued by

About this file

This solicitation amendment provides clarification regarding a design-build contract opportunity with the Department of the Navy to construct an additional floor in the Hematology Clinic in Skopje, North Macedonia. The contractor will be responsible for all aspects of design and construction, including electrical connection fees and taxes, a new grounding and lightning protection system, and ensuring continuity of critical utilities throughout the project. The response due date is extended to May 26, 2020.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5768706

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N3319120R4013 D-B Renovate Hematology Clinic, Skopje, North Macedonia

This solicitation amendment continues on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319120R4013

X 9B. DATED (SEE ITEM 11)

13-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-May-2020

CODE

NAVFAC EUROPE AFRICA CENTRAL

VIALE PORTO CAPODICHINO

NAPOLI 80144

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF

SUMMARY

SECTION SF

The following

AMEND

The purpose

QUESTION#

Considering t there are two copy of the re construction a crucial for us

ANSWER

This is a desig solution withi Macedonia. F method of con Preliminary d requirements

F 30 BLOCK 1

OF CHANGE

F 30 - BLOCK

g have been ad

DMENT 0001

e of this solicita

#1 hat the existing possible soluti eports of the tes activities and th to provide the gn-build contra in the paramete Find below the nstruction, as w design that will connected to t

4 CONTINUA

ES

K 14 CONTINU

dded by full tex ation amendme g building has ions for the stru sts for the exist he existing obj proper structu act, in which th ers of the contr official technic well as precise l take into acco he new story”

ATION PAGE

UATION PAG

xt:

ent is to respon an old reinforc ucture (reinforc ting structures ect is capable t ural solution an he successful c ract and in stri cal information estimation of t ount parameter which shall be

GE

nd to Pre-Propo ced concrete st ced concrete o to ensure us th to resist the ad nd budget.

ontractor can s ict compliance n available. As the needed fun rs related to th ecome part of t osal Inquiry an tructure, and si r metal structu hat there is a po dditional static select the most with laws and s stated: “In or ds, it is necess e existing struc this contract.

nd extend the du ince at the textu ure) we would l ossibility to pe loads. This inf t economically d regulations of rder to define t sary to develop cture, as well a

N3319120R40

Page 2 o ue date.

ual description like to receive erform any formation is y advantageous f North the most optima p an appropriat as the of 5 n a s al te

N3319120R4013

QUESTION#2

Can you please confirm if it is the contractor's responsibility to pay for the electrical connection fees and taxes for the new building? According to North Macedonian regulations the for electrical connection, the beneficiary is responsible to sign the contract and pay all fees and taxes for the new electrical connection, electrical meters etc, to the Electric Utility Company.

That is because the amount to be paid is estimated by Electric Utility Company. We believe that our responsibility is to only bring all the necessary installations to the connection station. Please confirm.

ANSWER

It is the contractor’s responsibility in this design-build contract to provide a fully operational facility with the limitations described in the PTS. This requires the completed facility to have adequate power supply.

It is the contractor’s responsibility to perform all works related with the electrical connection, and to pay for the electric meter, grounding, for the cabinets, cables, protection, conduits, excavations, and to pay for any labor, materials, testing or equipment and any administrative tariff or fee related with the electrical connection. All technical and administrative requirements of the electrical company become requirements of our contract.

It is not the contractor’s responsibility to sign the power supply contract or to pay for any energy consumption after the building is formally accepted.

Basically, the contractor shall pay for everything related with the connection, but not related with the energy supply, which should be paid by the beneficiary after the pertinent power supply contract is signed. However, if the beneficiary chooses to rent the metering equipment, then the contractor would not be responsible to pay for the electric meter.

In summary, the contractor pays for everything until the supply contract is signed. After the supply contract is signed, the beneficiary pays for everything.

QUESTION#3

Can you please confirm for which areas does the diesel generator need to provide electricity for? At the site visit, the architect form the Ministry of Health, Mrs. Elena, informed us that the generator needs to provide backup electricity only for the isolation boxes. Please confirm.

Confirmed.

QUESTION#4

Is there a plan or project for the protective electrical earthing and lightning conductor for the existing building or is the contractor obligated to provide brand new earthing and lightning conductor installations and connections for the new floor?

ANSWER

It is the contractor’s responsibility to provide a new grounding system for the new floor, as well as a new lighting system. All shall be designed, installed and certified as per regulations of North Macedonia. It is authorized to connect the new grounding to the existing grounding as permitted by North Macedonian regulations. Grounding for lightning system shall be independent.

QUESTION#5

We would like to have a list of rules and regulations by the beneficiary for the utilities and appliances of the existing building that need to be uninterrupted during the rerouting of the electrical cables or executing other construction activities.

ANSWER

This is described in paragraph 3.7. Some examples and elements are described in this paragraph 3.7. However, we are aware of the difficulty and complexity of the issue. It is required a daily coordination with the beneficiary. The rooms under the work areas shall remain operational with patients with extreme medical conditions. We understand that this special circumstances imply costs, or requirements that have a significant impact on your cost proposal. The rules will change throughout the execution of works. However, for estimating purposes, and to expand the information already included in paragraph 3.7, you may estimate:

‐ No power interruptions to the electric supply of the Hematology Clinic. They have a generator. If any power interruptions are necessary, they will be limited to a maximum of 15 minutes and shall be performed with 15 days advance notice, and outside normal working hours.

‐ No activities emitting significant noise or vibrations during 4 hours within the normal working hours (12:00 to 16:00, or 08:00 to 12:00). No activities emitting significant noise or vibrations after normal working hours.

‐ Provide whatever physical protection is required by regulations to avoid any possibility of damages to the ceilings of the operational areas of the hospital. It is estimated that immediately after removal of the existing roof, the contractor shall cover all horizontal surfaces with plastic and metal plates to avoid any possibility of water and physical damage to the ceilings. There can be no possibility of errors until the new floor deck and waterproof barrier is provided.

‐ Access to the hospital complex by cranes and heavy vehicles shall be limited to weekends, holidays and after normal working hours

‐ Extremely difficult vehicle access. You will be given an area for a couple of trailers, storage and 5 parking spaces. However, any other vehicle access will be extraordinarily difficult during normal working hours.

‐ The normal working hours are 08:00 to 17:00 on non-holiday Mon-Fri. The contractor is authorized to work 24 hours per day and 7 days a week, given that they comply with the requirements of paragraph 3.7, with the additional or clarified restrictions described in this amendment, with any other technical requirements of the Hospital Complex, and with the labor laws and regulations of North Macedonia, especially referring to the labor safety and hygiene regulations.

QUESTION# 6

Can you please clarify whose responsibility is to pay for Construction Permit fees and taxes?

According to Macedonian Regulations and Law, there are two types of taxes and fees that need to be paid in order to obtain the necessary Construction Permit 1. Taxes and fees to Municipality of City of Skopje and 2. Municipality of Center).

The construction permit fees and taxes are paid by the beneficiary (user of the building) which in this case is the Clinic of Hematology. The textual description of this solicitation (page 5, paragraph 1.4) says that the contractor is required to pay for any applicable fee necessary to obtain a Construction Permit.

The average amount that may be needed to get paid for the Construction Permit is around 100.000 USD.

The party that submits the request for obtaining the Construction Permit is responsible for payment of the Construction Permit’s fees and taxes. In every case the contractors have submitted the request for permit on behalf of the beneficiary.

According to the Donation Agreement that is concluded between the USG (represented by the US Embassy) and the beneficiary, it clearly states that we can not pay any taxes associated to the construction process. So, the selected company works with the beneficiary to avoid any major tax and fees payments. Small fees if arise should be covered by the selected company.

The proposal due date is extended to Tuesday, 26 May 2020 by 2:00p.m. Central European Summer Time (CEST).

(End of Summary of Changes)