Q AND A Responses 3.docx

DOCX document 28 KB Posted

Attached to
USNS CITY OF BISMARCK Mid-Term Availability (MTA)
Solicitation number
N3220520R4078
Issued by

About this file

This document provides answers to questions from potential offerors on solicitation N3220520R4078 from the Military Sealift Command for the USNS CITY OF BISMARCK Mid-Term Availability. The period of performance is from October 6, 2020 through December 5, 2020. The solicitation seeks offers for repair and maintenance work to be performed at the contractor's facility, which could include a leased or subcontracted space if all facility requirements are met. An extension to the response date was granted from June 25 to July 2, 2020 due to delays vendors and subcontractors are experiencing in responding to solicitations due to COVID-19 work policies. Earlier start dates would require pier-side facilities.

View the file

Other files

File Type Posted
Q AND A Responses 5.docx DOCX document
J- 1 Work Item Index Rev 3.docx DOCX document
J - 2 Category A Items BISMARCK 20R4078 Rev 2.xlsx XLSX spreadsheet
Amendment 0004 N3220520R4078.docx DOCX document
Amendment 0003 N3220520R4078.docx DOCX document
Q AND A Responses 4.docx DOCX document
J- 1 Work Item Index Rev 2.docx DOCX document
J - 3 Category B Items - BISMARCK 20R4078 Rev 1.xls XLS spreadsheet
J - 2 Category A Items BISMARCK 20R4078 Rev 1.xlsx XLSX spreadsheet
N3220520R4078 AMEND 0002.pdf PDF
Q AND A Responses 2.pdf PDF
N3220520R4078 AMEND 0001.docx.pdf PDF
J - 3 Category B Items - BISMARCK 20R4078 Rev.xls XLS spreadsheet
J - 2 Category A Items BISMARCK 20R4078 Rev.xlsx XLSX spreadsheet
J- 1 Work Item Index Rev.docx DOCX document
Q AND A Responses 1.pdf PDF
Solicitation N3220520R4078.docx DOCX document
USNS CITY OF BISMARCK FY21 MTA_JA.docx DOCX document
J Attachments.zip ZIP file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N3220520R4078

QUESTIONS AND ANSWERS #3

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

QUESTION #7:

The following Technical Manuals were not included in the supplied references. Please provide the following references.

2.1Technical Manual Export: EVAC Online Max maintenance requirements No. 1.
2.2Technical Manual Export: EVAC Online Max maintenance requirements No. 2.

ANSWER:

The requested drawings will be provided via e-mail.

QUESTION #8:

The following Enclosures could not be located.

2.2.2CBG Systems Drawing No. SFP-HATCH Rev -; Title SFP-INSPECTION-HATCH CBG Systems Drawing No. CBG-RAC-HATCH Rev -;
2.2.3Title CBG Systems Rapid Access Composite – Hatch Installation

ANSWER:

The requested drawings will be provided via e-mail.

QUESTION #9:

The following references could not be located in provided documents.

WI 0104, Reference 2.1 WI 0105, Reference 2.5 WI 0306, Reference 2.1.2

ANSWER:

The requested drawings will be provided via e-mail.

QUESTION #10:

Contractor is experiencing slow responses from Vendors and Subcontractors solicited for this proposal due to the current social distancing, working from home, etc., most companies are struggling meeting our due date. We have only received 20% of quotes solicited to date.

Contractor respectfully requests a bid extension from 25 June, 2020 to 02 July, 2020 and final date for requests for specification clarification to 22 June.

The above requested change is necessary to allow subcontractors response time or contractor may be forced to not participate.

ANSWER:

The optimal timeframe for ship repair availabilities awards is 60 days before start of period of performance. In order to stay within this timeframe and still allow the government time for the acquisition process an extension until July 2, 2020 cannot be granted. The government can grant extension until June 25, 2020.

QUESTION #11

The Solicitation states “8. The place of performance for this contract shall be the contractor’s facility.”

Question: If the Contractor has a lease or subcontract that provides access to acceptable facilities; will that meet the requirement of “contractor’s facility”?

ANSWER:

Yes, ALL facility requirements will still have to be met per the sub-factors. It will be Technically evaluated by the technical team.

QUESTION #12

Section F has a period of performance of 6 OCT 20 through 05 Dec 20 Question: Would the Government consider amending the start date to October 20, 2020, if pier side facilities could not be proposed for an earlier start?

ANSWER:

No, the schedule for this availability is based on mission readiness support requirements and cannot be adjusted.