0011_A_GENERAL SERVICES FOR THE SHIP T-AO REV 02May20.docx

DOCX document 37 KB Posted

Attached to
USNS HENRY J. KAISER FY21 MTA
Solicitation number
N3220520R4066
Issued by

About this file

This document package includes a specification for general services required for the USNS Henry J. Kaiser's FY21 Mid Term Availability and the related solicitation notice. The specification outlines various services that must be provided including electrical shore power, shore steam, potable water, distilled water, heat exchanger cooling water, compressed air, fire protection, lighting and ventilation, space cooling, sewage disposal, heat lamps, debris removal, interior protection, helicopter deck protection, toilet facilities, stack covers, oil containment, gangways, bilge water removal, compartment access, cold weather protection, care of the ship, external protection, final cleaning, crane services, parking, and general requirements. The solicitation was issued by the Military Sealift Command for the FY21 MTA work and indicates a closing date was set. Offerors would provide pricing for the estimated quantities of utilities to be consumed and dispose of, with adjustments to be made if actual amounts differ.

View the file

Other files

File Type Posted
N3220520R4066-0004.docx DOCX document
1008_A_A Arm Replacement.doc DOC document
5210114 Rev N.pdf PDF
N3220520R4066-0003.docx DOCX document
J-2 Category A Items REV2.xlsx XLSX spreadsheet
0090_A_Daily_COVID_19_Prevention_and_Control_Services_Rev_K.docx DOCX document
0010_A_FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) REV 11May20.docx DOCX document
N3220520R4066-0002.docx DOCX document
J-3 Category B Items REV 1.xlsx XLSX spreadsheet
1008_A_A-arm Replacement.doc DOC document
J-2 Category A Items REV1.xlsx XLSX spreadsheet
N3220520R4066-0001.docx DOCX document
J - 14 Technical Data Non-Disclosure.docx DOCX document
N3220520R4066 KAISER JA_Redacted.pdf PDF
CDRL SWI-004.pdf PDF
CDRL SWI-0021.pdf PDF
CDRL SWI-0023.pdf PDF
CDRL SWI-005.pdf PDF
CDRL SWI-0015.pdf PDF
CDRL SWI-001.pdf PDF
CDRL SWI-0024.pdf PDF
CDRL SWI-006.pdf PDF
CDRL SWI-0017.pdf PDF
CDRL SWI-0014.pdf PDF
CDRL SWI-0013.pdf PDF
CDRL SWI-0011.pdf PDF
CDRL SWI-0016.pdf PDF
CDRL SWI-0018.pdf PDF
CDRL SWI-0010.pdf PDF
CDRL SWI-0022.pdf PDF
CDRL SWI-0020.pdf PDF
CDRL SWI-0019.pdf PDF
CDRL SWI-0012.pdf PDF
J-10 Interport Differential.doc DOC document
J-2 Category A Items.xlsx XLSX spreadsheet
J-8 RFC.doc DOC document
J-3 Category B Items.xlsx XLSX spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J-11 Dry Dock Evaluation Form.docx DOCX document
J-4 HJK MTA21.pdf PDF
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J - 12 Past Performance Data.doc DOC document
N3220520R4066.docx DOCX document
J-7 MSC Ship Repair Facility Survey.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS KAISER

(T-AO 187)

GENERAL REQUIREMENTS
SOL. NO. N32205-20-R-4066

27 May, 2020

ITEM NO.
011
CATEGORY
“A”
MSC/SWI/N75/PPE

GENERAL SERVICES FOR THE SHIP T-AO

1. ABSTRACT

1.1. This item describes the requirements for the contractor to provide general services to the ship for duration of the overhaul period.

2. REFERENCES/ENCLOSURES

2.1. References:

2.1.1. MSC Drawing No. 671-6580129, Shore Services Support

2.1.2. MSC Chemical Treatment Handbook

2.2. Enclosures:

2.2.1. Heat Lamp List: Motors, Generators and Exciters

3. ITEM LOCATION/DESCRIPTION

3.1. Location/Quantity

3.1.1. See reference 2.1.1 and specification article 7.

4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5. NOTES

5.1. The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with all applicable GTR requirements.

5.2. The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item.

5.3. The definitions of many terms used in this work item are found in Work Item 001.

6. QUALITY ASSURANCE REQUIREMENTS

6.1. None additional.

7. STATEMENT OF WORK

7.1. Furnish the services specified in this work item, from the date of the ships arrival at the Contractor's facility until the date of final departure from the Contractor's facility:

7.1.1. Electrical Shore Power

7.1.1.1. The contractor shall provide a reliable source of electrical power at a minimum capacity of 2400 Amps. Shorepower substations shall be enclosed in a vault or designed to be weather-proof. Substation shall have a primary isolation switch. Substation secondary shall be a three phase ungrounded system and shall have 400 amp circuit breakers for each shore power connection. Line to line voltage at the ship’s service switchboard shall be maintained at 450V +/- 5%, 60 Hz +/- 3%. Line voltage imbalance shall not exceed 2%.

7.1.1.2. Six (6) 400 amp shore power cables are required to be furnished by the contractor, to connect the pierside substation secondary to the ship’s shore power connection. All electric cables utilized shall be in good material condition, free of tears, cracks or poorly repaired insulation. Cables shall be sized such that the voltage drop between the substation secondary and the ship’s shore power connection does not exceed 4% at full load. All three phases shall be carried in each cable. All conductors of each cable shall be of equal cross-sectional area. Cable lengths shall be of equal length +/- 10% of the average length. Cables shall be routed such that there is sufficient slack to allow for natural movement of the ship with tide and weather, but length shall not be excessive such that the cables be allowed to fall into the water or become trapped between the ship’s hull and the pier. Cables shall avoid sharp edges and tight bends, and proper strain relief shall be provided for vertical runs. Cables shall be protected from pedestrian and vehicular traffic. In line connectors and splices shall be properly insulated, sealed and elevated such that they will not be exposed to standing water. Subsequent to installation, but prior to energizing, resistance tests (500V, 1 megaohm minimum corrected to 70 degrees F) shall be performed between conductors, and between each conductor and ground for all cables. Each cable shall be checked for proper phase rotation.

7.1.1.3. Ship shall be bonded to the pier whenever shore power connection is energized to ensure proper operation of ship’s ground detection equipment. Contractor shall be responsible to connect and disconnect upon ship arrival, in-yard shifts, dock and sea trial events, and for ship’s departure. Ship’s shore power connection boxes are located per reference 2.1.1. Contractor shall perform walkthrough with the MSCREP and the vessel’s Chief Engineer upon arrival to lay out an approved shore power cable routing.

7.1.1.4. Electrical Shore Power Pricing: Provide a calibrated in-line electrical power meter with which to measure the vessel’s shore power consumption. The meter shall only reflect power usage by the ship. The meter shall be installed in the immediate vicinity of the ship’s shore power receiving station(s) and shall be readily accessible to the MSCREP and the vessel’s Chief Engineer. An initial meter reading shall be witnessed by the MSCREP and the Chief Engineer. Meter readings shall be recorded and presented to the MSCREP on a weekly basis. At the end of the availability, the final meter reading shall be recorded and witnessed by the MSCREP and the Chief Engineer. A report shall be prepared and submitted with total calculated electrical power consumption. The Government will only pay for actual electrical power consumed. The contractor shall provide a bid price based on an estimated electrical power consumption of 1,000,000 kWh (kilowatt hour). Any required adjustments above or below this total kWh will be made via contract modification using the prorated unit price per kWh based on the contractor’s initial bid price.

7.1.2. Shore Steam

7.1.2.1. Provide 100 psig steam at a maximum capacity of 6000 lbs/hr at ship’s shore connection. Furnish, connect and disconnect all valves, fittings, and hoses required. Each shore steam connection shall be fitted with a steam strainer. Connect and disconnect shore steam upon ship arrival, at each in-yard shift, for tests and trials, and for ship’s departure.

7.1.2.2. Shore steam connections are located per reference 2.1.1.

7.1.3. Potable Water

7.1.3.1. Provide potable water, 60 psig at approximately 100 GPM. Provide and install all valves, fittings and hoses required to connect to the ship’s shore potable water connection. All equipment and installations used shall meet United States Public Health Service or equivalent international public health service standards for drinking water intended for human consumption. It is strictly prohibited to connect anything other than potable water to the potable water manifold. The potable water connection shall be fully dedicated and direct connection to a potable water source. No split lines or additional headers allowed. Connect and disconnect potable water upon ship arrival, at each in-yard shift, for tests and trials and for ship’s departure. Potable water connections are located per reference 2.1.1.

7.1.3.2. Potable Water Pricing: Provide a calibrated in-line water meter with which to measure the vessel’s shore potable water consumption. The meter shall be installed in the immediate vicinity of the ship’s shore potable water receiving station(s) and shall be readily accessible to the MSCREP and the vessel’s Chief Engineer. An initial meter reading shall be witnessed by the MSCREP and the Chief Engineer. Meter readings in gallons shall be recorded and presented to the MSCREP on a weekly and cumulative basis. At the end of the availability, the final meter reading shall be recorded and witnessed by the MSCREP and the Chief Engineer. A report shall be prepared and submitted with total calculated potable water consumption. The Government will only pay for actual potable water consumed. The contractor shall provide a bid price based on an estimated potable water consumption of 400,000 gallons. In addition, contractor shall bid a unit price per gallon for adjustments to the award price for lesser or greater total consumption. Any required adjustments shall be made via a contract modification.

7.1.4. Distilled Water:

7.1.4.1. Provide de-ionized water for vessel boiler feed and engine cooling. This water shall meet the requirements in reference 2.1.2. Provide and install all valves, fittings and hoses required to connect and fill the ship’s distilled water tanks. If a pierside demineralizer is used, a Y type strainer with 100 mesh shall be fit to prevent resin contamination of the ship’s system.

7.1.4.2. Distilled Water Pricing: Provide a calibrated in-line water meter with which to measure the amount of distilled water provided to the vessel. The meter shall be installed in the immediate vicinity of the tank fill line and shall be readily accessible to the MSCREP and the vessel’s Chief Engineer. An initial meter reading shall be witnessed by the MSCREP and the Chief Engineer. Upon completion of filling, the final meter reading shall be recorded and witnessed by the MSCREP and the Chief Engineer. A weekly and cumulative report shall be prepared and submitted with total calculated distilled water in gallons provided. The Government will only pay for actual distilled water received. The contractor shall provide a bid price based on an estimated distilled water consumption of 15,000 gallons. Any required adjustments above or below this total volume will be made via contract modification using the prorated unit price per gallon based on the contractor’s initial bid price.

7.1.5. Heat Exchanger Salt Water Cooling:

7.1.5.1. Provide salt water cooling water supply and return for air conditioning and ship’s reefer machinery, 100 psig at approximately 600 GPM. Provide and install all valves, fittings and hoses required to connect to the ship’s salt water cooling connection(s). Connect and disconnect salt water cooling lines upon ship arrival, at each in-yard shift, for tests and trials and for ship’s departure. Heat exchanger cooling water connections are located per reference 2.1.1.

7.1.6. Compressed Air:

7.1.6.1. Provide 125 psig compressed air at 300 CFM at each of three (3) manifolds for ship’s force use. Manifold locations shall be designated by the MSCREP. Air shall be clean, dry, and oil free. Provide all necessary hose and fittings and make all hook ups. Connect and disconnect compressed air lines upon ship arrival, at each in-yard shift, for tests and trials and for ship’s departure.

7.1.6.2. Provide 125 psig compressed ships service air at a minimum capacity of 300 CFM. Air shall be clean, dry, and oil free. Air line shall be fit with an air dehydrator, air filter and oil separator in the vicinity of the connection to the ship’s compressed air system. Provide necessary hose, fittings, and make all hook ups. Contact Chief Engineer prior to hook up. Connect and disconnect compressed air lines upon ship arrival, at each in-yard shift, for tests and trials and for ship’s departure. Ship service air connections are located per reference 2.1.1.

7.1.7. Fire Protection:

7.1.7.1. Ship’s fire protection requirements are provided under Work Item 016 of the work package.

7.1.8. Temporary Lighting and Ventilation:

7.1.8.1. Provide and maintain adequate temporary lighting and ventilation for the performance of work required by this specification in all areas where ship's lighting and/or ventilation is disrupted or inadequate.

7.1.9. Temporary Space Cooling:

7.1.9.1. Provide temporary cooling for the spaces indicated below. Contractor shall provide all equipment, ducting, condensate drain piping and electrical power to maintain an ambient temperature of 75 degrees F for the entire performance period. Connect and disconnect temporary cooling upon ship arrival, at each in-yard shift, for tests and trials and for vessel departure.

7.1.9.2. Spaces shall include:

7.1.9.2.1. Radio room, spaces 03-69-0 and 03-74-1

7.1.10. Sewage Disposal

7.1.10.1. Provide all pumping arrangements, hoses, connections and shore-side disposal facilities necessary to remove and dispose of sewage from the ship for the duration of the performance period, in accordance with all federal, state and local (CONUS) or international (OCONUS) requirements. Ensure all equipment is in good material condition and that all connections are 100% leak-free. Connect and disconnect sewage upon ship arrival, at each in-yard shift, for tests and trials and for vessel departure.

7.1.10.2. Approximately 1000 gallons of Sewage effluent are expected to be generated per day when reduced crew is berthing onboard the vessel.

7.1.10.3. Ship sewage connections are located per reference 2.1.1.

7.1.11. Heat Lamps:

7.1.11.1. Provide, install, and maintain approximately 107 infra red heating lamps/strips on all motors, generators, and exciters, listed on enclosure 2.2.1. Lamps shall be installed immediately upon plant shutdown. Heat lamps shall be separately powered from a pierside power source. The ship’s electrical systems shall not be used to power heat lamps.

7.1.12. Debris and Garbage Removal:

7.1.12.1. Clean the entire ship on a daily basis, Monday – Saturday, except federal holidays. All decks, passageways, and work areas shall be swept clean and debris free on a daily basis. Clean and disinfect frequently touched objects and surfaces using regular household cleaning spray and wipe. All paint containers, chips, shavings, dirt, paper, boxes, and other work item debris shall be collected and placed in metal containers which shall be removed daily from the ship and disposed of in accordance with state and local regulations (CONUS) and international and local regulations (OCONUS). Oil, refuse, hazardous wastes, and scrap materials, shall also be removed on a daily basis and disposed of in a proper manner and in accordance with federal, state and local laws and regulations (CONUS) and international requirements (OCONUS). Hazardous wastes shall be removed and disposed of in accordance with specification Work Item No. 023. No debris or garbage shall be left onboard the vessel overnight.

7.1.12.2. All garbage that has been generated by the ship's crew and shipyard personnel shall be collected and removed on a daily basis. The contractor shall provide metal containers at appropriate locations for garbage deposit. Minimum ¾” thick plywood deck protection shall be placed under all garbage containers. Garbage containers shall be maintained in a sanitary condition, free of insects and rodents.

7.1.13. Interior Bulkhead and Deck Protection:

7.1.13.1. Install 1/8” minimum thickness plywood, pressed fiberboard, herculite, or suitable covering acceptable to the MSCREP, on all interior decks, bulkheads, passageways, stair towers, and other areas that will be traversed by the contractor. The protective covering shall be securely fastened to all decks and bulkheads and renewed as necessary, or at the direction of the MSCREP. Just prior to redelivery, the contractor shall remove all protective coverings and securing materials and clean all decks, bulkheads, passageways, and stair towers to a finished, ready to inhabit condition, to the satisfaction of the MSCREP.

7.1.14. Helicopter Deck Protection:

7.1.14.1. Contractor shall NOT utilize helicopter landing deck or hanger deck areas for lay-down, garbage containers or staging areas without written consent from the MSCREP. As authorized, contractor shall temporarily install adequate means to protect helo deck AND helo hangar deck non-skid surfaces (on vessels with these facilities). Blocking, plywood, and HERCULITE lay down materials shall be utilized wherever contractor lands materials and/or equipment on the helo deck or helo hangar deck. Any damage to helo deck or helo hangar deck surfaces shall be repaired, restored, and certified (per NAVAIR regulations) to like new condition, at contractor’s expense.

7.1.15. Toilet and Sanitary Facilities:

7.1.15.1. Shipyard personnel shall not use shipboard toilet and sanitary facilities. The contractor shall provide and install signs to this effect. In cases where the ship’s sanitary system is not active, the contractor is to provide and maintain a minimum of four portable toilet and sanitary facilities for the shipboard personnel aboard the vessel in locations designated by the ship’s Master. One portable toilet shall be designated for female use only. Adjacent to or integral to the porta-potties a free standing hand washing and sanitation station shall be provided. Free standing hand wash and sanitation station shall include hot/cold water up to 100 degree F., liquid soap, hand sanitizer, paper towels, and a trash bin for disposal. Drains for the hand sanitation station shall be piped off the vessel or in a collection tank and emptied on a daily basis. Hand sanitizer shall be alcohol-based with at least 60% alcohol. The contractor shall also provide daily janitorial services to maintain cleanliness and toilet supplies. This includes the cleaning and disinfect of frequently touched objects and surfaces using a regular household cleaning spray or wipe. Any contamination of the shipboard facilities or MSD system by the contractor shall be cleaned and restored at the contractor's expense.

7.1.15.1.1. Portable toilet facilities shall be locked with the keys delivered to the gangway watch.

7.1.16. Stack Covers:

7.1.16.1. Template from the smokepipes, provide and install temporary stack covers. Covers shall be fit and installed over each individual stack exhaust. Remove covers prior to any engine operation.

7.1.17. Oil Containment Boom:

7.1.17.1. Upon arrival of the vessel at the contractor’s facility, an oil boom shall be rigged to completely encircle the vessel and shall be maintained in good material condition throughout the entire availability. Connect and disconnect oil booms upon ship arrival, at each in-yard shift, for tests and trials and for vessel departure. In the event the availability includes a drydocking evolution, the oil boom shall be rigged around the floating drydock or the graving dock gate during the time the vessel is on drydock.

7.1.18. Gangways:

7.1.18.1. Provide and install two (2) safe and proper gangways for access to the ship. One gangway shall be used for routine access to the vessel. The second gangway shall be designated for emergency use only. Gangway locations shall be to the satisfaction of the MSCREP and ship’s Master.

7.1.18.2. Gangways shall meet the requirements of OSHA Standard 1915.74, Access to Vessels (CONUS) or applicable international occupational safety and standards (OCONUS). Gangways shall be a minimum of 20 inches wide. Gangways shall be adequately secured against shifting, shall be illuminated and shall be properly trimmed.

7.1.18.3. Each side of the gangway, and turntable if used, shall have a railing with a minimum height of 33 inches, and shall be fit with a mid-rail. Rails shall be wood, pipe, chain, wire or rope and shall be kept taut at all times. The gangway shall be properly trimmed at all times.

7.1.18.4. Obstructions shall not be laid on or across the gangway. Means of access shall be adequately illuminated for its full length. Safety nets shall be provided and secured to the ship and to the pier edge to provide adequate coverage. The net shall extend 6 feet on all sides of the gangway.

7.1.18.5. The emergency use gangway shall have signs posted at each end indicating its use for emergencies only.

7.1.18.6. Adjacent the main gangway a free standing hand washing and sanitation station shall be provided. Free standing hand wash and sanitation station shall include hot/cold water up to 100 degree F, liquid soap, hand sanitizer, paper towels, and a trash bin for disposal. Drains for the hand sanitation station shall be piped off the vessel or in a collection tank and emptied on a daily basis. Hand sanitizer shall be alcohol-based with at least 60% alcohol.

7.1.19. Bilge Water Removal:

7.1.19.1. Contractor shall provide all pumps, hoses, fittings and personnel to safely remove all bilge water from the spaces noted in Section 3 on a continuous basis, such that the bilges are maintained in a dry state. Applicable federal, state, local or international procedures for transferring oily wastes over water shall be followed by the contractor. Ensure all equipment is in good material condition and that all connections are 100% leak-free. Connect and disconnect bilge pumping arrangements upon ship arrival, at each in-yard shift, for tests and trials and for vessel departure.

7.1.19.2. Provide a calibrated in-line water meter with which to measure the amount of bilge water removed from the vessel. The meter shall be installed in a location readily accessible to the MSCREP and the vessel's Chief Engineer. An initial meter reading shall be witnessed by the MSCREP and the Chief Engineer. Weekly readings shall be provided to the MSCREP via a condition report. A weekly and final report shall be prepared and submitted with weekly and cumulative readings in gallons calculated. The Government will only pay for the actual quantity of bilge water removed from the vessel.

7.1.19.3. The contractor shall provide a bid price for bilge water disposal based on an estimated quantity of 40,000 gallons. Any required adjustments above or below this total volume will be made via contract modification using the prorated unit price per gallon based on the contractor’s initial bid price.

7.1.20. Compartment Access and Security:

7.1.20.1. All compartments shall remain locked unless the contractor is required to accomplish daily work.

7.1.20.1.1. Ship’s force shall be notified in advance of required entry into any particular compartment.

7.1.20.2. The contractor shall permit free movement of properly identified employees and materials of the government to all points of the ship at all times during the contract period. The contractor shall also permit free movement of properly identified government employees and subcontractors through the yard and to the ship. The contractor shall allow private contractors, hired by the government to perform certain installation work aboard the ship. The Contractor shall grant passage through his facility to the ship to all properly identified technicians or other workmen hired by the government. A driver’s license or similar ID and a copy of a government work order or purchase order shall constitute proper identification.

7.1.20.3. Contractor and subcontractor personnel shall not be permitted to eat in the ship’s mess. Ship’s mess decks are off limits to contractor and subcontractor personnel.

7.1.20.4. Contractor and subcontractor personnel shall not use the ship’s 1MC or telephone systems. The contractor shall provide a separate, independent means of communications for contractor and subcontractor personnel.

7.1.20.5. Contractor and subcontractor personnel shall not use the ship’s personnel elevator. Provide and install 8 1/2" × 11" laminated signs with 1/2” letters stating the following:

ELEVATOR IS OFF LIMITS

TO CONTRACTOR AND SUBCONTRACTOR PERSONNEL

7.1.20.6. The contractor shall take appropriate measures to ensure that all contractor and subcontractor personnel comply with all posted notices onboard.

7.1.21. Cold Weather Protection:

7.1.21.1. In the event that this ship availability is accomplished at a time and location susceptible to cold weather conditions, contractor shall be responsible to protect the vessel from the effects of these cold weather conditions.

7.1.21.2. Contractor shall adhere to the Cold Weather Plan provided in accordance with work item 007 of this work package, to provide adequate protection to the ship, and to provide a safe working environment for ship’s crew, OMT staff and contractor personnel.

7.1.22. Care of the Ship:

7.1.22.1. Provide a safe berth for the vessel at a pier where the ship will be afloat with a minimum of three feet of water under the keel/lowest projection at all times and during all tides, as specified in work item 003 of this work package. The ship shall be securely moored to the pier with the contractor’s mooring lines, sufficient camels and/or fenders between the ship and pier to prevent any structural and coating system damage. Mooring facilities and locations of protective camels and/or fenders shall be presented for MSCREP approval per work item 003 prior to vessel’s arrival at the contractor’s facility.

7.1.22.2. Upon arrival of the vessel at the contractor's facility, conduct a joint survey with MSCREP to ascertain the operational status of all equipment and systems on board the vessel, and the cleanliness of all spaces onboard the vessel. The ship's crew will be made available for up to 72 hours after arrival to assist in this survey.

7.1.22.2.1. Submit an as found condition report to the MSCREP within five days after arrival of the vessel at the contractor's facility.

7.1.22.3. The contractor shall be responsible for the entire ship from the time of delivery to the contractor until the MSCREP accepts it for redelivery. All ship's parts, equipment, systems, etc., damaged or destroyed by the contractor shall be repaired or replaced, as original, at contractor's expense. Such consideration includes, but is not limited to, piping, electric cables, machinery, insulated/refrigerated storerooms, compartments, bulkheads, decks, and ducting damaged by neglect, weather, personnel, dirt, foreign substances, etc., or lost through theft.

7.1.22.4. All paint and flammable liquids that are temporarily stored on board the ship by the contractor shall be stored in a suitable container designed in accordance with international, federal, state, and local regulations for flammable liquid storage.

7.1.22.5. Rigid control of welding and grounding shall be maintained for the protection of the hull, stern tubes, and hull appendages. Care shall be taken to ensure that welding polarity and ground connections of welding machines used aboard the ship or other ships in the immediate vicinity, on the pier, or on the wharf to which the ship is moored, shall not damage any part of the ship.

7.1.22.6. The contractor shall survey all deck drains in way of work areas upon vessel arrival and submit a condition report on whether subject drains are free and clear or clogged. Drains found clogged subsequent to this initial survey shall be kept clear and in proper working condition, unless previously identified as being clogged.

7.1.22.7. The contractor shall maintain all machinery space bilges in a clean and dry condition for the entire shipyard availability period.

7.1.23. External Vessel Contamination Protection:

7.1.23.1. Prevent contamination of ship’s ladder ways, decks, deck coverings, equipment, materials, furnishings, and spaces at all times throughout the performance period of this contract. This shall include, but not be limited to operations during abrasive and/or hydro blasting, vacuum blasting, scaling, surface cleaning, sanding, painting, welding, grinding, pumping/transferring of water/oils/liquids, and any other source of contamination by work accomplished in this specification package. Contractor shall be responsible for protecting against contamination from neighboring and/or adjacent facilities and/or other work projects within contractor facility, that are capable of emitting contaminants onto any/all areas of the vessel. Accomplish below specified requirements as found required in support of this work specification package and as found required to protect vessel from outside sources of contamination:

7.1.23.2. Temporarily install protective coverings on the deck, deck equipment, machinery, wire ropes, cranes, boats, and any other materials and/or equipment in way of possible contamination. Contractor shall use heavy duty canvas, then cover the canvas covering with heavy duty PVC sheets. Protection and covering material shall be fastened securely to prevent protective coverings from being removed.

7.1.23.3. Temporarily plug, blank, wrap, cover or mask openings and portlights to prevent entry of contaminants into machinery, equipment, systems, electronic equipment, valves, vents, and other openings, when not in use.

7.1.23.4. Temporarily install new industrial foam filter material on the intake and exhaust end of the ventilation systems. Renew filtering material when air flow becomes restricted on exhaust and intake of ventilation systems. Change out and renew filter material when required, for the entire contract performance period.

7.1.23.5. Temporarily install double curtain baffles at the entrance of each access door which will be in use. Temporarily install a mat on the deck directly inside each door. The MSCREP will select a maximum of six doors for ship interior access. Tag out all doors which have not been designated for access to read “NO ENTRY - KEEP DOOR CLOSED.”

7.1.23.6. Removal of any preventive measures specified above shall not be accomplished without permission of the MSCREP. Where removal of preventive measures specified above become necessary to accomplish other related work items, the contractor shall remain responsible for ensuring no contamination of the areas are involved, and preventive measures are restored.

7.1.23.7. Once approved by the MSCREP the contractor shall remove protective measures and sweep, clean, and washdown area, and equipment impacted.

7.1.24. Final Vessel Cleaning:

7.1.24.1. Four (4) days prior to the crew move-aboard milestone if applicable, or approximately 9 days prior to contract performance period end date, the contractor shall accomplish the following cleaning requirements onboard the vessel

7.1.24.2. All temporary deck protective covering shall be removed. All tiled decks shall be mopped, waxed and machine buffed. All carpeted areas in public spaces shall be vacuumed. Carpeting stained by the contractor shall be cleaned by commercial pressurized hot water/steam/chemical equipment.

7.1.24.3. All bulkheads and overheads which are soiled shall be washed with soap and water/cleaning solvent and wiped dry.

7.1.24.4. All exposed wireways and pipe shall be vacuumed free of all loose dust and grit. All horizontal surfaces shall be examined and likewise vacuumed of loose dust and grit.

7.1.24.5. All galley(s), pantry(s), scullery(s) and other food preparation, serving, messing and food consumption spaces and equipment shall be cleaned and sanitized.

7.1.24.6. Upon completion of all work within each machinery space the contractor shall conduct a close out inspection with the MSCREP. As acceptance occurs the contractor shall perform a "final" bilge cleaning. The contractor shall perform the "final" bilge cleaning using an environmentally safe biodegradable bilge cleaning product and a high pressure water wash down. All bilge drainage limber holes and snipes, and all bilge wells shall have all trash, garbage, dirt and industrial debris therein removed. All bilge drain well covers shall be left open with the well pumped dry until accepted as clean. All fuel and lube oils, grease, or petroleum based materials, etc. shall be cleaned and removed from the bilges and other surfaces.

7.1.25. Crane, Forklift and Transportation Services:

7.1.25.1. Provide crane, rigging, forklift and transportation service at the request of the MSCREP. Estimate 50 lifts, inclusive of all associated man-hours to support these lifts, to accomplish vessel material and supplies movement.

7.1.25.1.1. These lifts shall be in addition to any crane service required by other items in this work package.

7.1.25.1.2. Contractor shall establish a chit system to track usage of these lifts. For each crane lift, a usage chit shall be prepared documenting the lift event. The chit shall be signed by the MSCREP. Contractor shall maintain a running log of lifts used, and shall provide a weekly summary to the MSCREP.

7.1.25.2. Provide transportation (on an as needed basis) for the MSCREP and the Chief Engineer for inspection visits to subcontractor or vendors facilities outside the contractor’s facility.

7.1.25.3. Provide 15 parking spaces for ship’s officers and official guests. All parking spaces shall be adjacent to the vessel and properly marked as USNS ZEUS OFFICER'S PARKING ONLY.

8. GENERAL REQUIREMENTS

8.1. None additional.

Heat Lamp List Motors and Exciters Enclosure 2.2.1

Name
Location
Qty
Info
Main Sea Water Pumps
Engine Room 4-60-0
3

Central Fresh water Pumps

Jacket Water Pumps

Fire Pump

Main Engine Lube Oil Pumps

CPP System Pumps

Start Air Compressors

Fuel Oil Service Pump

Ships Service Air Compressor

Main Red Gear Lube Oil pumps

Fuel Oil Purifiers

Lube Oil Purifiers

Chill Water

Air Conditioning Compressors

Ships Service Refrigeration plant

Misc Motors
Engine Room
20
As Directed By the MSCREP
Misc Motors
Cargo Pump Motor Rooms
20
As Directed By the MSCREP
Steering Gear
Steering Gear Room 2-131-0
2
High Pressure Air Compressor
High Pressure Air Compressor 1-40-0
2
Misc Motors
Throughout the Ship
25
As Directed By the MSCREP

011-1