J-3 Category B Items.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- USNS HENRY J. KAISER FY21 MTA Federal contract opportunity
- Solicitation number
- N3220520R4066
About this file
This file contains a spreadsheet listing Category B items required for the FY21 Mid Term Availability for the USNS Henry J. Kaiser. Key requirements include physical security services, continuation of various management and support services for 15 days, replacement of approximately 20,000 pounds of structural steel plate and 7,000 pounds of rolled shapes, and miscellaneous piping repairs including various sizes of carbon steel pipe and socket welded flanges. The solicitation is issued by the Department of the Navy Military Sealift Command and prices must be provided by offerors for labor, materials, and total costs for each item. Award is expected to provide the services and materials necessary for the scheduled maintenance and repairs of the USNS Henry J. Kaiser.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS HENRY J. KAISER (T-AO 187) FY 21 MTA | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 7.1' | Establish Condition Charlie | 1 | DAY | ||||||||||||
| 7.2' | Maintain Condition Charlie | 1 | DAY | ||||||||||||
| 7.1' | Establish Condition Delta | 1 | DAY | ||||||||||||
| 7.2' | Maintain Condition Delta | 1 | DAY | ||||||||||||
| WI 025 Sub-Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Parent work item 010 “Overhaul Management Team Services”. | 15 | DAYS | ||||||||||||
| 7.2 | Parent work item 011” General Services for the Ship” | 15 | DAYS | ||||||||||||
| 7.3 | Parent work item 012 “Telephone Services | 15 | DAYS | ||||||||||||
| 7.4 | Parent work item 013 “Project Planning and Monitoring” | 15 | DAYS | ||||||||||||
| 7.5 | Parent work item 016 “Fire Protection and Ship’s Safety” | 15 | DAYS | ||||||||||||
| 7.6 | Parent work item 019 "Shipboard Access and Security" | 15 | DAYS | ||||||||||||
| 7.7 | Parent work item 020 “Gas Free Certificates” | 15 | DAYS | ||||||||||||
| WI 030 Sub-Total | |||||||||||||||
| 108 | STEEL REPLACEMENT | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 3.3.1 | Approx 20,000 lbs of structural steel plate | 20,000 | lbs | ||||||||||||
| 3.3.2 | Approx 7,000 lbs of rolled structural shapes | 7,000 | lbs | ||||||||||||
| 3.3.3 | Approx fifty (50) 6" long or less cracked fillet welds | 50 | ft | ||||||||||||
| 3.3.4 | Approx fifty (50) 7"-12" long cracked fillet welds | 50 | ft | ||||||||||||
| 3.3.5 | Approx twenty (20) sounding tube striker plates | 20 | ea | ||||||||||||
| 3.3.6 | Approx twenty (20) pits clad welded | 20 | ea | ||||||||||||
| WI 108 Sub-Total | |||||||||||||||
| 509 | MISCL PIPING REPAIR | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 3.1.2.1 | Fifty (50) linear feet of 8" Schedule 80 carbon steel pipe | 50 | ft | ||||||||||||
| 3.1.2.2 | One hundred (100) linear feet of 8" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.3 | One hundred (100) linear feet of 6" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.4 | One hundred (100) linear feet of 5" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.5 | One hundred (100) linear feet of 4" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.6 | One hundred (100) linear feet of 3" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.7 | One hundred (100) linear feet of 2-1/2" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.8 | One hundred (100) linear feet of 2" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.9 | Twenty (20) 8" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.10 | Twenty (20) 6" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.11 | Twenty (20) 5" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.12 | Twenty (20) 4" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.13 | Twenty (20) 3" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.14 | Twenty (20) 2-1/2" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.15 | Twenty (20) 2" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| WI 509 Sub-Total |
| &"Times New Roman,Regular"&10USNS HENRY J. KAISER | &"Times New Roman,Bold"&14 |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N322020R4002 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .