19R3009_Attachment_K_REV_1_-_Technical_Proposal_Datasheets_(AMEND_05).docx

DOCX document 21 KB Posted

Attached to
OPERATION AND MAINTENANCE OF THE EIGHT WATSON CLASS VESSELS
Solicitation number
N32205-19-R-3009
Issued by

About this file

This document contains technical proposal data sheets and exhibits for a solicitation from the Department of the Navy Military Sealift Command to provide operation and maintenance of eight Watson class vessels. The offeror is required to complete tables providing details of relevant ship operating experience including ship names, types, tonnage, propulsion systems, and dates operated. Additional tables require information on prior dry dock repair experience such as ship names, years dry docked, locations, costs, durations, and reasons for dry docking. A final table requires key shore side personnel proposed for the contract to be identified along with their current job titles, proposed dedication percentages to this contract and other duties, and whether they meet minimum billet requirements.

Attachment K Rev1

View the file

Other files

File Type Posted
Released_Amend__10.pdf PDF
Released_AMEND_9.pdf PDF
19R3009_WATSON_QA12.pdf PDF
19R3009_WATSON_QA11_30AUG19.pdf PDF
19R3009_WATSON_AMEND_08_28AUG19.pdf PDF
Amend_0007.pdf PDF
N3220519R3009_Amend_0006_13AUG19.pdf PDF
19R3009_WATSON_QA10.pdf PDF
19R3009_Attachment_P_REV_1_Pricing_Forms_A-C_(AMEND_5).xlsx XLSX spreadsheet
19R3009_Attachment_B_REV_1_-_WD_(AMEND_05).pdf PDF
19R3009_Attachment_U-Training_Information.pdf PDF
19R3009_Attachment_A_REV_2_-_ACRONYMS_and_DEFINITIONS_(AMEND_5).pdf PDF
N3220519R3009_Amend_0005.pdf PDF
Released_Amend__4.pdf PDF
19R3009_WATSON_QA9_.pdf PDF
Amendment__3.pdf PDF
19R3009_WATSON_QA8_.pdf PDF
19R3009_WATSON_QA8_.pdf PDF
GFP_N3220519R3009_RED CLOUD Rev1.xls XLS spreadsheet
GFP_N3220519R3009_WATKINS Rev1.xls XLS spreadsheet
GFP_N3220519R3009_POMEROY Rev1.xls XLS spreadsheet
GFP_N3220519R3009_WATSON_Rev1.zipx ZIPX file
GFP_N3220519R3009_POMEROY_Rev1.zip ZIP file
GFP_N3220519R3009_WATKINS_Rev1.zip ZIP file
GFP_N3220519R3009_CHARLTON_Rev1.zipx ZIPX file
GFP_N3220519R3009_RED_CLOUD_Rev1.zip ZIP file
GFP_N3220519R3009_SISLER_Rev1.zip ZIP file
GFP_N3220519R3009_SODERMAN Rev1.xls XLS spreadsheet
GFP_N3220519R3009_DAHL_Rev1.zipx ZIPX file
GFP_N3220519R3009_SODERMAN_Rev1.zip ZIP file
GFP_N3220519R3009_SISLER Rev1.xls XLS spreadsheet
19R3009_WATSON_Q&A__7__158_Thru__183_24JUL19_Final.pdf PDF
WATSON_19R3009_QA6_24Jul19_Final.pdf PDF
DD254_-_LMSR_WATSON_REV1_(Amend_2).pdf PDF
Released_AMEND__2.pdf PDF
19R3009_Attachment_T_-_Reimbursable_Expenses_(Amend_2).pdf PDF
19R3009_Attachment_I_REV_1_-_PAST_PERFORMANCE_NARRATIVE_(AMEND_2).pdf PDF
19R3009_Attachment_A_REV_1_-_ACRONYMS_and_DEFINITIONS_(AMEND_2).pdf PDF
19R3009_Attachment_L_REV_1_Total_Evaluated_Price_Forms_D_(Amend_2).xlsx XLSX spreadsheet
19R3009_WATSON_Q&A5___83_-_119.pdf PDF
19R3009_WATSON_Q&A4___53_-_82.pdf PDF
Released_Amend__1.pdf PDF
19R3009_WATSON_QA3___37_thru_52.pdf PDF
19R3009_WATSON_Q&A_2__10_-_36.pdf PDF
19R3009_WATSON_Q&A___1-9.pdf PDF
GFP_Q3_DAHL.xls XLS spreadsheet
19R3009_Attachment_F_-_Request_for_Clarification.docx DOCX document
GFP_Q6_WATKINS.xls XLS spreadsheet
19R3009_Attachment_P_Pricing_Forms_A-C.xlsx XLSX spreadsheet
19R3009_Attachment_E_-_Hull_Clauses.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT K-1

Exhibit (1) Ship Operating Experience – The offeror shall complete this table per L-7.B.1.a.ii. Insert additional rows as applicable. Sample data has been provided as guidance.

Ship Name
Ship Type
Ship Owner
Relationship of Contractor to Ship
Dates Operated (MM/YYYY)
Gross Tonnage

Amend 05

Propulsion Type
Propulsion HP
LOA
Beam
M/V Noah Zark
Container
Theolmyti Inc.
Operator
06/1999-01/2002; 02/2005-10/2012
15,000
Slow Speed Diesel
25,000
650’
85’
M/V Kent Goh Strait
Oil Tanker
Dinoco
Maintenance Manager
04/2002-09/2003
30,000
Slow Speed Diesel
28,500
705’
125’

ATTACHMENT K-2

Exhibit (2) – Dry Dock Repair Experience: The offeror shall complete this table per L-7.B.1.b.iii. Insert additional rows as applicable. Sample data has been provided as guidance.

Ship Name
Year Dry Docked
Dry Dock Location
Final Cost
Final Duration
Reason for Dry Docking the Ship
M/V Noah Zark
2000
Dubai
$6.6M
45 days
Regulatory Surveys Due
M/V Noah Zark
2005
Singapore
$4.2M
40 days
Regulatory Surveys Due
M/V Kent Goa Strait
2003
Portugal
$5.2M
27 days
Repair U/W hull plating damaged by grounding.
Proposed Individual (First and Last Name)
Current Job Title
Current Employee?
Proposed Percent Dedication to this Contract
Proposed Total Percent Dedication to Other Duties
Minimum Key Billet Requirements
KEY PERSONNEL TO BE CONSIDERED FOR TECHNICAL TRADE-OFF FACTOR L-14.B.II.A.1 -Key Personnel Qualifications exceed requirements or number of Key Personnel proposed exceed requirements
Port Engineer (Example)
Jim Nasium
Engineering Superintendent
Yes
100%
0%
X
Assistant Operations Manager/POC for Operations (Example)
Rick O’Shay
Scheduler
Yes
40%
60%

X

ATTACHMENT K-3

Exhibit (3) – Technical Approach, Key Shore Side Personnel: The offeror shall complete this table for individuals proposed as Key Shore Side Personnel as part of L-7.B.1.a.iii. Insert additional rows as applicable. Sample data has been provided as guidance.

N32205-19-R-3009 WATSON O&M Attachment K – Technical Proposal Data Sheets Rev1

File details come from the government source that posted it. Updated .