CRANE OPERATING PERMIT

Contractor shall complete this form and submit (1) copy to the Contracting Officer at least 24 hours prior to bringing any crane on Navy property. This form shall be signed by an official of the company that provides cranes for any application under this contract. Contractor shall submit a separate form for each job, the permit will be valid only for the job specified. Post a valid signed copy of this permit on the crane prior to arriving on Navy property. Cranes will NOT be allowed to operate until a Contracting Officer’s Representative has completed a quality assurance check, and signed the block below. All crane operations are subject to periodic surveillance by the Crane Surveillance Team. All cranes must have a valid Waterfront Operational Permit prior to working on any Navy owned pier.

LOCATION: (Include Sketch if required)

DATE (S) OF CRANE OPERATION:

DESCRIPTION OF WORK:

CONTRACTING OFFICE: GOV. REP.

CONTRACTING OFFICER /

PHONE

CONTRACT NUMBER:

PRIME CONTRACTOR:

POINT OF CONTACT / PHONE:

CRANE CONTRACTOR:

POINT OF CONTACT / PHONE:

CRANE MANUFACTURER: MODEL:

CAPACITY CRANE ID #:

GROSS VEHICLE WEIGHT:

TRAVEL:

OPERATING:

MAX LIFT DURING

OPERATION:

MAX OUTRIGGER LOAD

DURING OPERATION:

CRANE OPERATOR’S NAME(S):

I certify that:

1. The above noted crane conforms to applicable OSHA regulations (host country regulations for naval activities in foreign countries) and ASME B30 as required. The following regulations apply: _______________________________________

2. That the operators noted above have been trained and are qualified for the operation of the above noted crane.

3. That the operators noted above have been trained not to bypass safety devices during lifting operations.

COMPANY OFFICIAL: (signature)

PRINTED NAME / TITLE: DATE:

TO BE COMPLETED BY CONTRACTING OFFICER’S REPRESENTATIVE

PRIOR TO ACCESSING NAVY PROPERTY

ACCESS AUTHORIZED: (signature) PRINTED NAME: DATE

TO BE COMPLETED BY CONTRACTING OFFICER’S REPRESENTATIVE

AFTER COMPLETING QUALITY ASSURANCE CHECK

Q/A CHECK COMPLETE: (signature) PRINTED NAME: DATE

POST ON CRANE

(IN CAB OR VEHICLE)

IN-PROCESSING SHEET

FOR

CONTRACTOR'S CRANE-ENTRY PACKAGE

Today's Date

Tracking number

Gov. Contracting office

Gov. Contractor's officer name

Gov. Contractor's phone #

Crane packet was received on- date ______time:......-_______ . ;, Job will start on - date'--____ time'--____ location~-----

1 Was the entry package complete? ·Yes or No

2. Person name that reviewed & completed the packet: ___- ________

Return the submittal or memo with tracking number to the Gov. Contraction officer.

Date __~, time ___ replywas sent.

Comments

Corrective items comments

COMNAVREGMIDLANTINST 11262.1A

06 FEB 2013

CONTRACTOR CRANE/WHE PRE-ENTRY CHECKLIST

Enclosure (3)

Contracting Office:

Contractor’s Package Rec'd:

Proposed Date(s) of Entry:

Prime Contractor:

Prime Contractor POC: POC Phone:

Contracting Officer:

Phone: Contract Number:

Crane Supplier / Phone (If different from prime contractor):

Serial number Approved/Qualified Operator(s) and Rigger-in- Charge:

1.

Equipment Manufacturer

Equipment Model Equipment Number

2.

Manufacturers Maximum Rated Capacity:

Heaviest Lift

3.

Cert. Type Exp. Date

Quadrennial: ______________

Annual: ______________

Equipment Setup Site: Lift Type:

Critical

Routine

Equipment Type at Check in Point

Mobile RT Floater Other (Specify):

Mobile Truck Mobile on barge

Crawler Boom truck

If Boom Truck, will boom be used for lift? Y N If yes, does Boom Truck have required papers? Y N

Boom Type

Telescopic manufactured after 02/28/92? Y N NA

Lattice manufactured after 02/28/92? Y N NA

Equipped with Anti Two-Blocking device? Y N NA

Boom free of obvious defects? Y N NA

Equipment at Check in Point Same as identified in submitted crane/WHE package? Y N List / trim angle indicator visible to operator while at controls? Y N NA Configured same as identified in submitted crane/WHE package? Y N Calibrated Load Moment / Load Indicator present in operator's cab? Y N NA All Hoist Block Hooks equipped with positive latching device? Y N Crane equipped with appropriately rated fire extinguisher? Y N NA Hoist wire rope free of obvious defects? Y N NA Crane equipped with spill containment kit? Y N NA

Hoist wire rope dead ended with:

Poured Socket? Y N Wedge Socket? Y N Swage Socket? Y N If wedge type socket, is pig tail clamped correctly? Y N

Operator at Check in Point in Possession of:

Completed Certificate of Compliance? Y N Copy of Required Crane/WHE Certifications ? Y N NA Current Crane/WHE Operator Qualifications? Y N NA Copy of Approved Lift Plan? Y N NA Copy of approved Ground Loading restrictions for all set up/work locations Y N NA Approved cribbing plan and cribbing at pass office prior to entry? Y N NA Load Rating Charts visible to operator while at controls? Y N NA Boom angle indicator visible to operator while at controls? Y N NA Rigging gear free of obvious defects? Y N

General Notes:

Reviewing Surveillance Team Member Phone Expiration of Permit Date of Entry Time of Entry

Enclosure (1)

CERTIFICATE OF COMPLIANCE

This certificate shall be signed by an official of the company that provides cranes (or multi-purpose machines, material handling equipment, or construction equipment used to lift loads suspended by rigging gear) or rigging gear for any application under this contract. Post a completed certificate on each crane or alternate machine (or in the contractor’s on-site office for rigging operations) brought onto Navy property.

CONTRACTING OFFICER’S POINT OF CONTACT

(Government Representative)

PHONE

PRIME CONTRACTOR/PHONE

CONTRACT NUMBER

CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE

(if different from prime contractor)

CRANE OR ALTERNATE

MACHINE NUMBER (i.e., ID #)

CRANE OR ALTERNATE MACHINE MANUFACTURER/TYPE/CAPACITY

CRANE OR ALTERNATE MACHINE OPERATOR'S NAME(S)

I certify that

1. The above noted crane or alternate machine and all rigging gear conform to applicable OSHA regulations (host country regulations for naval activities in foreign countries) and applicable ASME B30 standards. The following OSHA regulations and ASME standards apply:________________________________________________________

2. The operators noted above have been trained and are qualified for the operation of the above noted crane(s) or alternate machine(s).

3. The operators noted above have been trained not to bypass safety devices during lifting operations.

4. The operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.

COMPANY OFFICIAL SIGNATURE

DATE

COMPANY OFFICIAL NAME/TITLE

POST ON CRANE (OR ALTERNATE MACHINE)

(IN CAB OR VEHICLE)

(or in the contractor’s on-site office for rigging operations)

Enclosure (4)

CONTRACTOR CRANE/WHE OPERATING PERMIT

NAVFAC MIDLANT CONTRACTOR CRANE/WHE

OPERATING PERMIT

DATE ISSUED

EXPIRATION DATE

CONTRACTING AGENT NAME & PHONE# ________________________

CONTRACT #

AUTHORIZED LOCATION

EQUIPMENT CONTRACTOR

EQUIPMENT NUMBER

CONTRACTOR CRANE/WHE ENTRY PACKAGE CHECKLIST

Enclosure (2)

Company / Equipment Information

Company Name

Equipment Manufacture / Equipment Model / Equipment Number

Date of Annual Inspection Expiration

CONTRACT NUMBER

Date of Quadrennial Inspection Expiration

Name & phone number of Contracting Official (or designated local representative)

Contracting Official

Phone Number

Does the package include a routine or critical lift plan?

YES

NO

Has the contract been verified to contain all the requirements of NAVFAC P-307 Paragraphs 1.7.2 a.-j. as applicable?

Location of lift site

Duration equipment will be continuously on the job site (hrs, days, weeks...)

Does plan include certification from contractor that the equipment complies with applicab le ASME s tandards IAW Ref. (c)?

Does plan include a certificate of compliance per COMNAVREGM IDLANTINST 11262.1A [enclosure (1)]?

Which OSHA regulations does the certificate of compliance indicate? (For cranes used in cargo transfer, 29 CFR 1917 applies; for cranes used in construction, demolition, or maintenance, 29 CFR 1926 applies;

for cranes used in shipbuilding, ship repair, or ship breaking, 29 CFR 1915 applies).

Does plan include valid medical certificate and proof of operator qualification from a source that qualifies crane/equipment operators (union, governmental agency, or an organization that tests and qualifies crane/equipment operators)? Verify qualification for each back-up operator (if provided) on the certificate of compliance.

N/A

Does the plan designate a qualified Rigger-in-Charge?

What is the weight of the heaviest load to be lifted?

lbs.

What is the weight of the rigging gear?

What are the crane components (and their weights) that add to the weight of the load (hook, jib, etc.)?

Main Block lbs.

Aux. Block lbs.

Jib (Stowed) lbs.

Jib (Erected) lbs.

Other lbs.

What is the maximum total crane lift (sum of 13, 14 & 15 above)?

TOTAL

What is the capacity of the equipment as configured?

What percentage of the equipment capacity does this lift represent?

What is the main boom length? If a jib will be utilized, indicate the length and offset.

Main Jib Offset

What are the minimum and maximum load radii?

Min

Max

Does the plan include the manufacturer's load chart for entire range of lift(s)?

Does plan include ground loading and outrigger reaction data to determine cribbing requirements, or a Waterfront Operational Permit?

CONTRACTOR CRANE/WHE ENTRY PACKAGE CHECKLIST (CONT)

2 Enclosure (2)

For crawler crane, does the plan indicate area restrictions for operation?

For floating crane, does plan include maximum allowable list?

For mobile crane mounted on barge, is crane equipped with load indicating device? Wind indicating device? Marine type list and trim indicator (readable in one-half degree increments)?

For mobile crane mounted on barge, does plan include revised load chart?

What are the environmental condit ions under which crane/WHE operations are to be stopped?

Will the crane perform critical lifts per COMNAVREGMIDLANTINST 11262.1A? (If no, skip items 29 -49.)

What circumstances require this lift to be classified as a critical lift? (Blind lift, 75% of load chart non-routine rigging, etc.)

What are the exact dimensions of the load? (L x W x H)

Does the plan indicate the crane position? (Overhead view)

What is the maximum lift height of the lift?

What is the minimum boom angle?

What is the maximum boom angle?

What is the name of the operator?

Indicate name(s) of backup operator (if required).

Does the plan show lift points?

Does the plan describe the rigging procedures?

Does the plan indicate rigging hardware requirements?

For personnel lifts, does the plan demonstrate compliance with 29 CFR 1926.1431?

Does EM 385-1-1 govern this lift?

What are the coordination and communication requirements for the lift (e.g., radio and hand signals)?

For tandem or tailing crane lifts, does the plan indicate the make and model of the crane, the line, boom, and swing speeds, and the requirement for an equalizer beam?

For floating cranes, refer to questions 20-22?

What is the name of the lift supervisor?

Does the plan indicate the qualifications of the lift supervisor?

What are the names of the riggers?

Does the plan indicate the qualifications of the riggers?

Did all involved personnel (Operator, Riggers, Lift Supervisor, etc.) sign the critical lift plan?

Signature below verifies crane package complies with CNRMA INST 11262.1A and NAVFAC P -307

Contracting Official: Organization: Signature: Date: Phone:

Reviewed By:

Enclosure (6)

CONTRACTOR CRANE OR RIGGING OPERATIONS CHECKLIST

YES NO N/A

1 Is the Certificate of Compliance, P-1, in the operator’s cab (or in the contractor’s on-site office for rigging operations) with the current operator’s name listed?

2 Is the crane/machine transited to and from the job site correctly? Are the OEM instructions for travel being followed?

3 Does the operator know the weight of the load to be lifted?

4 Is the load to be lifted within the crane/machine manufacturer's rated capacity in its present configuration?

5 Are outriggers or stabilizers required?

6 If outriggers are required, are outriggers fully extended and down, and the crane load off the wheels?

7 Is the crane/machine level and on firm ground, if the ground is not firm is the crane/machine blocked?

8 If blocking is required, is the entire surface of the outrigger pad supported and is the blocking material of sufficient strength to safely support the loaded outrigger pad?

9 If outriggers are not used, is the crane/machine rated for on-rubber lifts by the manufacturer's load chart? If stabilizers are used and not outriggers and the wheels are not off the ground is this the correct setup in accordance with the OEM?

10 Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury or damage?

11 Has the hook been centered over the load in such a manner to minimize swing?

12 Is the load well secured and balanced in the sling or lifting device before it is lifted more than a few inches?

13 Is the lift and swing path clear of obstructions?

14 If rotation of the load being lifted is hazardous, is a tag or restraint line being used?

15 Are personnel prevented from standing or passing under a suspended load?

16 Is the operator's attention diverted?

17 Are proper signals being used at all times? Is the operator responding properly to the signals? Are radios used for blind lifts?

18 Is the load lifted a few inches to ensure it is secure and balanced?

19 Are empty hooks lashed or otherwise secured during travel to prevent swinging?

20 Does the operator remain at the controls while the load is suspended?

21 Do the operations ensure that side loading is prohibited?

22 Are personnel prevented from riding on a load?

23 Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?

CONTRACTOR CRANE OR RIGGING OPERATIONS

2 Enclosure (6)

CHECKLIST (CONT).

24 If operating near electric power lines, are the rules and guidelines understood and adhered to?

25 Is the lift a critical lift?

26 If so, are all regulations understood and check-off sheets initialed and signed off?

27 Are any overhead power lines in the vicinity?

28 If so, are complex lift rules and 1926.1407-1411 being followed?

29 If pick and carry operations are allowed and performed, are OEM directions followed (e.g. rotation lock engaged, boom centered over front or rear, etc.)?

30 When the crane/machine is left unattended, is it in a safe condition?

31 Is rigging gear undamaged and acceptable for the application?

32 Does rigging gear meet applicable ASME or host country standards

(e.g. ASME B30.9 for slings, B30.10 for hooks, B30.26 for hardware such as shackles, safety hoist rings, eyebolts, etc, B30.20 for below the hook lifting devices, etc.)?

33 Is the rigging gear inspected prior to use?

34 Is chafing gear used to protect slings (especially synthetic slings) and equipment from damage due to sharp corners and edges?

35 Is the rigging gear used in accordance with its working load limit? Is the load limit visible?

36 Are positive latching devices used on crane and rigging hooks, or are the hooks “moused”?

Contractor:

Subcontractor:

Location:

Date:

Notes:

Signature of Contracting Officer’s Representative:

LIFT PLAN DETAIL SHEET

NON-Critical______ Critical________

Before making a critical or non-critical lift plan, qualified personnel shall prepare the lift plan, which can be, qualified members of the crane team, site supervisor/lift director or crane engineer. Key members, such as the lift supervisor, rigger and crane operator shall participate in the preparation.

The plan shall designate the crane operator, lift supervisor and rigger and state their qualifications For tandem or tailing crane lifts, the plan will specify the make and model of the cranes, the line, boom, and swing speeds, and requirement for an equalizer beam.

___ RIGGING PLAN DETAIL LIFT POINT

DESIGNATED AS (X)

ALSO, MANUFACTURE OR COMPANY’S

DETAIL DRAWING IS ACCEPTABLE

OPERATOR

QUALIFIED RIGGER IN CHARGE

___ QUALIFIED RIGGERS

Rigging Gear Used A _____________________________________________________________ Specifications

B _____________________________________________________________

C _____________________________________________________________

D______________________________________________________________

Crane Make & Model ______________________________________________________________

Personnel Basket Inspection Date ____________ Total weight of test weight _______________

Rigging Procedure _____________________________________________________________

COMMUNICATION:

A. Hand Signals ____ B. Two-way Radio ___ C. Others Specify____________________________

LIFT PLAN DETAIL SHEET

NON-Critical______ Critical________

Crane

Boom length _______

Lift radius

Designation point Building _____ _____ Ship Truck _____ _____ Pier Other _____

________Boom angle

__________Total weight of load

Center pin

GROUND CONDITIONS

Mat (cribbing) design is to be provided by the contractor, which will be used to achieve a level and stable foundation of sufficient bearing capacity for the lift.

Crane is to be positioned on: concrete____, asphalt_____, grassy area_____, solid____, sand____, Other (specify) _____________________________________________________________________

ENVIRONMENTAL CONDITIONS

Lift operations shall be immediately terminated if the following conditions arise:

a. Adverse operating condition: (climatic conditions (snow, ice, severe rain, wind, thunderstorms).

b. Winds in excess of _______ mph.

c. Other factors (specify)_____________________________________________________________

d. Comments:_____________________________________________________________________

CONTRACTING OFFICER’S POINT OF CONTACT
CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE
CONTRACTOR CRANE OR RIGGING OPERATIONS CHECKLIST
TRACKING NUMBER:
MACHINE SUPPLIER:
MACHINE SUPPLIER PHONE:
MACHINE NUMBER:
MACHINE MANUFACTURER:
CAPACITY:
OSHA REG:
OPERATOR 1:
OPERATOR 2:
OPERATOR 3:
CONTRACTING OFFICER:
CONTRACTING OFFICER PHONE:
PRIME CONTRACTOR:
PRIME CONTRACTOR PHONE:
CONTRACT NUMBER:
MACHINE TYPE/ MODEL:
date:
CONTRACTING OFFICE:
ANNUAL INSPECTION:
QUADRENNIAL INSPECTION:
JOB SITE:
DURATION OF JOB:
COMPANY OFFICIAL NAME:
TITLE:
notes:
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Text52:
Text53:
Text54:
Text55:
Text56:
Text57:
Text58:
Text60:
Text61:
Text62: 0
Text63: 0
Text64: 0
Text65: 0
Check Box67: Off
Check Box68: Off
Check Box70: Off
Check Box71: Off
Check Box72: Off
Check Box39: Off
Check Box42: Off
Check Box41: Off
Check Box73: Off
Check Box74: Off
Check Box75: Off
Check Box76: Off
Check Box77: Off
Check Box78: Off
Check Box79: Off
Check Box80: Off
Check Box81: Off
Check Box82: Off
Check Box83: Off
Check Box84: Off
CONDITIONS FOR SHUT DOWN:
Check Box86: Off
Check Box87: Off
Text88:
Text89:
Check Box90: Off
Check Box91: Off
BOOM HEIGHT:
MINIMUM BOOM ANGLE:
MAX BOOM ANGLE:
Check Box95: Off
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
Check Box102: Off
Check Box103: Off
Check Box104: Off
Check Box105: Off
Check Box106: Off
COMMUNICATION:
Check Box108: Off
Check Box109: Off
Check Box110: Off
Check Box112: Off
Check Box113: Off
Check Box115: Off
Check Box116: Off
Check Box117: Off
Check Box118: Off
Date:
today's date:
Text3:
ENTRY DATE:
Check Box14: Off
Check Box238: Off
C:
S:
T:
Text240:
Text241:
Text242:
Text243:
Text244:
Check Box40: Off
Text1:
HEAVIEST LIFT:
ASME STANDARDS:
DESCRIPTION OF WORK:
GROSS VEHICLE WEIGHT:
MAX OUTRIGGER:
P:
O:
C:
PRIME P:
O:
C:
Text11:
Text12:
Text13:
Text15:
OPRTIONING WEIGHT:
Text66: 0
Text4:
Text5: 0
Text59: 0
Check Box245: Off
Check Box246: Off
Check Box247: Off
Check Box248: Off
Check Box249: Off
Check Box250: Off
Check Box251: Off
Check Box252: Off
Check Box253: Off
Check Box254: Off
Check Box255: Off
Check Box256: Off
Text257:
Text258:
Text259:
Text260:
Text263:
Text264:
Text265:
Text266:
Text267:
Text268:
Text269:
Check Box270: Off
Check Box271: Off
Text272:
Text273:
Text274:
Text275:
Check Box276: Off
Check Box277: Off
Text25:
Text26:
Text111:
riggers:
PACKAGE RECEIVED:
Text14:
PACKAGE REC'D:
SERIAL NUMBER:
Check Box119: Off
Check Box120: Off
Check Box121: Off
Check Box122: Off
Check Box123: Off
Check Box124: Off
Check Box125: Off
Check Box126: Off
Check Box127: Off
other:
Check Box128: Off
Check Box130: Off
Check Box129: Off
Check Box132: Off
Check Box133: Off
Check Box134: Off
Check Box135: Off
Check Box136: Off
Check Box137: Off
Check Box138: Off
Check Box139: Off
Check Box140: Off
Check Box141: Off
Check Box142: Off
Check Box143: Off
Check Box131: Off
Check Box145: Off
Check Box146: Off
Check Box147: Off
Check Box148: Off
Check Box149: Off
Check Box150: Off
Check Box151: Off
Check Box152: Off
Check Box153: Off
Check Box239: Off
Check Box240: Off
Check Box241: Off
Check Box242: Off
Check Box243: Off
Check Box244: Off
Check Box154: Off
Check Box155: Off
Check Box156: Off
Check Box157: Off
Check Box158: Off
Check Box159: Off
Check Box160: Off
Check Box161: Off
Check Box162: Off
Check Box163: Off
Check Box164: Off
Check Box165: Off
Check Box166: Off
Check Box167: Off
Check Box168: Off
Check Box169: Off
Check Box170: Off
Check Box171: Off
Check Box172: Off
Check Box173: Off
Check Box174: Off
Check Box175: Off
Check Box176: Off
Check Box177: Off
Check Box178: Off
Check Box179: Off
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
ENTRY TIME: