J_-_2_Category_A_Items.xls
XLS spreadsheet 62 KB Posted
- Attached to
- USNS CHARLES DREW: Regular Schedule Overhaul/Dry-Docking Federal contract opportunity
- Solicitation number
- N32205-18-R-4252
About this file
Revised J-2
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | Furnish Office for OMT | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status | - 0 | $ - 0 | $0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ships Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Re-Delivery | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | - 0 | $ - 0 | $0 | ||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal | - 0 | $ - 0 | $0 | ||||||||
| 024 | Physical Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 142 | Greay Water and Food Waste Tank Preservation | - 0 | $ - 0 | $0 | ||||||||
| 143 | Replace Anchor Windless Planetary Gear Sets | $ - 0 | $0 | |||||||||
| 144 | Stack Preservation | $ - 0 | $0 | |||||||||
| 145 | Bulkhead Preservation | $ - 0 | $0 | |||||||||
| 146 | Cargo Door Mod TALT361 | $ - 0 | $0 | |||||||||
| 147 | Cargo Handling Area NonSkid Renewal Stations 1 and 2 | $ - 0 | $0 | |||||||||
| 148 | Liquid Cargo Deck RAZ NonSkid Renewal | $ - 0 | $0 | |||||||||
| 149 | Cargo Crane Annual Test for ABS | $ - 0 | $0 | |||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | PROPULSION MOTOR AND CLR CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 204 | MDG ANNUAL AUTOMATION (FME) | $ - 0 | $0 | |||||||||
| 205 | MDG ANNUAL AUTOMATION (GE) | $ - 0 | $0 | |||||||||
| 206 | VULCAN COUPLING ANNUAL INSP | $ - 0 | $0 | |||||||||
| 207 | MDG1 8 CYL 18K HR SCHEDULED MAINT | $ - 0 | $0 | |||||||||
| 208 | MDG2 AND MDG3 9 CYL 24K HR SCHEDULED MAINT | $ - 0 | $0 | |||||||||
| 209 | LUBE OIL COOLER REGASKET | $ - 0 | $0 | |||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CLEAN MAIN GEN AND PROP MTR CONTROL SYS | - 0 | $ - 0 | $0 | ||||||||
| 303 | HV-SS-E SWITCHBOARD INSPECTION AND CLEANING REV - | - 0 | $ - 0 | $0 | ||||||||
| 304 | THERMOGRAPHIC SURVEY_REV - | - 0 | $ - 0 | $0 | ||||||||
| 305 | PLC SURVEY ANNUAL REV - | - 0 | $ - 0 | $0 | ||||||||
| 342 | SHIPYARD SUPPORT INSTALLATION FOR AESS UPS (TALT 434) | - 0 | $ - 0 | $0 | ||||||||
| 344 | ADDL BILGE ALARM INSTALL TALT393 | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 401 | BRIDGE EQUIPMENT ANNUAL SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 402 | ANTENNA SYS PREVENTIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 403 | COMMS SYSTEM PM | - 0 | $ - 0 | $0 | ||||||||
| 404 | ADNS-SFF SYSTEM SUPPORT | - 0 | $ - 0 | $0 | ||||||||
| 405 | NAVMACSII SHIPYARD INDUSTRIAL ASSIST TALT 454 | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 501 | FIREFIGHTING INSPECTION AND TESTING (1-YR) | - 0 | $ - 0 | $0 | ||||||||
| 502 | SCBA ANNUAL INSPECTION_REV - | - 0 | $ - 0 | $0 | ||||||||
| 503 | SCBA AIR COMPRESSOR AND REFILL STA INSP MAINT_REV - | - 0 | $ - 0 | $0 | ||||||||
| 507 | EDG FLEX HOSE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 508 | DISTILLING PLANT ANNUAL PLATE CLEANING REV - | - 0 | $ - 0 | $0 | ||||||||
| 514 | AC AND CARGO REFRIGERATION RELIEF VALVE TESTING | - 0 | $ - 0 | $0 | ||||||||
| 516 | SEWAGE SYSTEM PIPING CLEANING REV - | - 0 | $ - 0 | $0 | ||||||||
| 517 | LTFW Cooler Cleaning and Gasket Change (kevlion) | - 0 | $ - 0 | $0 | ||||||||
| 518 | HTFW Cooler Cleaning and Gasket Change (phex) | - 0 | $ - 0 | $0 | ||||||||
| 569 | FWD AFFF SYS PIPING REPLACEMENT (T-ALT 394) | - 0 | $ - 0 | $0 | ||||||||
| 570 | FLUSH HT LT FRESHWATER AND CHILL WTR SYSTEMS | - 0 | $ - 0 | $0 | ||||||||
| 571 | BRINE SYSTEM FLUSH | - 0 | $ - 0 | $0 | ||||||||
| 573 | VANE AXIAL FAN AND MTR OVERHAULS | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 602 | LB RHIB DAVITS ACCOM LDR ANNUAL INSP | - 0 | $ - 0 | $0 | ||||||||
| 610 | GALLEY EQUIPMENT CALIBRATION | - 0 | $ - 0 | $0 | ||||||||
| 611 | AHU HEATER INSPECT REPAIR REPLACE | - 0 | $ - 0 | $0 | ||||||||
| 612 | MSD FLUSH AND SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 613 | RHIB Boat Gel Coat Preservation | - 0 | $ - 0 | $0 | ||||||||
| 614 | Lifeboat Gel Coat Preservation | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | GALLEY AND LAUNDRY EXHAUST DUCT CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 802 | FAN COIL IN COSAL TALT283 | $ - 0 | $0 | |||||||||
| 803 | NO. 3 AC PLANT 20K HR COMP REPLACEMENT (IMECO) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRY-DOCKING | |||||||||||
| 901 | DOCKING AND UNDOCKING, REV FEB 14 | - 0 | $ - 0 | $0 | ||||||||
| 903 | PROPELLER SHAFT AND STERN TUBE INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 904 | STERN TUBE SEAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 905 | BOW THRUSTER MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 908 | RENEW SEACHEST, ROPE GUARD, AND BT ZINCS | - 0 | $ - 0 | $0 | ||||||||
| 909 | ANCHOR AND ANCHOR CHAIN RANGING | - 0 | $ - 0 | $0 | ||||||||
| 911 | INSPECT AND REPAIR CATHODIC PROTECTION | $ - 0 | $0 | |||||||||
| 912 | SHAFT GROUNDING SYS MAINT | $ - 0 | $0 | |||||||||
| 916 | UNDERWATER HULL CLEANING AND PAINTING (SPOT BLAST 20) | $ - 0 | $0 | |||||||||
| 918 | FREEBOARD CLEANING AND PAINTING (SPOT BLAST) | - 0 | $ - 0 | $0 | ||||||||
| 941 | FW Stern Tube Lubrication System Installation_T-ALT 403 Rev 2 | - 0 | $ - 0 | $0 | ||||||||
| 951 | VALVE MOV GROOM | - 0 | $ - 0 | $0 | ||||||||
| 952 | REPLACEMENT_BOW_THRUSTER_TUNNEL_GRATING (TALT 448) | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1045 | HIGH PRESSURE RELEIF VALVE CALIBRATION | - 0 | $ - 0 | $0 | ||||||||
| 1046 | RAM TENSIONER REMOVAL AND REPLACEMENT | $ - 0 | $0 | |||||||||
| 1047 | REFURBISHMENT AND PRESERVATION OF UNREP FUEL STATION BLOCKS | $ - 0 | $0 | |||||||||
| 1048 | FAS FAIRLEAD BLOCK REMOTELY FED GREASE LINES | - 0 | $ - 0 | $0 | ||||||||
| 1049 | FLIGHT DECK AND HATCH REFURBISHMENT | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
&LUSNS CHARLES DREW (T-AKE 10)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-18-R-4252
&CATTACHMENT J-2
File details come from the government source that posted it.