0902_B_DRY_DOCKING_AND_UNDOCKING_VESSEL_REV_-.docx
DOCX document 29 KB Posted
- Attached to
- USNS CHARLES DREW: Regular Schedule Overhaul/Dry-Docking Federal contract opportunity
- Solicitation number
- N32205-18-R-4252
About this file
Revised Work Item 902
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS CHARLES DREW
(T-AKE 10)
| DRYDOCKING AND UNDOCKING | N32205-18-R-4252 | |
| 13 October 2017 | ||
| ITEM NO. 902 | Category "B" | N756/SWI/JSH |
DRY DOCKING AND UNDOCKING VESSEL REV -
1.0 ABSTRACT:
1.1 Continue dry-docking ship past the scheduled Contract Completion Date.
2.0 REFERENCES:
2.1 Work Item 901, Dry-Docking and Undocking Vessel
3.0 ITEM LOCATION/DESCRIPTION:
3.1 In accordance with reference 2.1 (WI 901 Dry-Docking and Undocking Vessel)
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.
5.0 NOTES:
5.1 The Contractor and all Subcontractors, regardless of tier, must consult the General Technical Requirements (GTRs) to determine applicability to this work item. In performance of this work item, the Contractor and all Subcontractors, regardless of tier, must comply with the requirements of all applicable GTRs.
5.2 The Contractor and all Subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Submit a unit price per day and extended price for up to a maximum of fifteen (15) days to continue all services in accordance with Work Item 901.
8.0 GENERAL REQUIREMENTS:
8.1 If this CAT B Work Item is invoked, the work requirements in this work item shall be finalized and/or completed as required for meeting scheduled milestones as outlined in Work Item 013 “Project Planning and Production Status Monitoring Reports”, paragraph 7.1.7 “Milestones”.
8.2 Offers must provide both a unit price and an extended total price for accomplishing the above paragraph 7 scope of work.
902 - 1
File details come from the government source that posted it.