Revised WI 916

View the file

Other files

File Type Posted
N32205-18-R-4252_Amendment_0004.docx DOCX document
0902_B_REDOCKING_AND_UNDOCKING_VESSEL_REV.docx DOCX document
1048_A_FAS_FAIRLEAD_BLOCK_REMOTELY_FED_GREASE_LINES.doc DOC document
0941_A_FW_Stern_Tube_Lub_System_Install_TALT_403__Rev_2_V6_SA.doc DOC document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_COFFERDAMS_AND_SPACE_REV_3.doc DOC document
0501_A_FIREFIGHTING_INSPECTION_AND_TESTING_(1-YR)_REV_1.doc DOC document
0208_A_MDG_2_AND_3_9_CYL_30000_HR_SCHEDULED_MAINTENANCE_REV1.docx DOCX document
0207_A_MDG1_8_CYL_24000_HOUR_SCHEDULED_MAINTENANCE_11DEC17.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
0142_A_Tank_Coatings_Gray_WTR_and_FD_Waste_VRR17-057_Rev1.doc DOC document
1046_A_RAM_TENSIONER_REMOVAL_AND_REPLACEMENT.doc DOC document
0011_A_GENERAL_SERVICES_FOR_SHIP,_T_AKE,_REV_FEB_14_Rev1.doc DOC document
0517_A_LTFW_COOLER_CLEANING_AND_GASKET_CHANGE_(TALT_426)_Rev1.doc DOC document
N32205-18-R-4252_Amendment_00003.docx DOCX document
0902_B_DRY_DOCKING_AND_UNDOCKING_VESSEL_REV_-.docx DOCX document
J_-_3_Category_B_Items.xls XLS spreadsheet
N32205-18-R-4252_Amendment_0002.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
N32205-18-R-4252_Amendment_0001.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS,_VOIDS,_COFFERDAMS_AND_SPACE_REV_2.doc DOC document
Work_Items.zip ZIP file
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS CHARLES DREW

(T-AKE-10)

DRYDOCKING AND UNDOCKINGN32205-17-R-4207
13 OCT 2017
ITEM NO. 916Category "A"N756/SWI/MZ/SA

UNDERWATER HULL CLEANING AND PAINTING REV -

1.0 ABSTRACT:

1.1. This item describes the surface preparation and painting of the ship’s underwater hull from the keel to the top of the boot topping.

2.0 REFERENCES:

2.1. NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks.

2.2. PPG-PMC MSC Handbook

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location/Quantity:

3.1.1. Ship's underwater hull and boot topping, from the keel to the 9,900 mm ABL, including bilge keels, shaft tubes, rudder and rudder horn and sea chests

3.1.2. Quantity:

Approx area

Flat of bottom26,522 sqft
Keel to light load line46,446 sqft
Boot topping19,332 sqft
Rudder including horn1,076 sqft
Sea chests8,500 sqft
Bow thruster Tunnel3,000 Sqft
Total104,876 Sqft

3.1.3. This item assumes 20% of the area above will be taken down to bare metal. When the ship is docked a survey will be taken to determine the amount of preparation required.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1. Government Furnished Material (GFM):

4.1.1. Material: Coatings and solvents required by this work item as follows:

Coat Product/ColorQuantity
Epoxy A/CAmercoat 240, Red Oxide875 gal
Epoxy A/CAmercoat 240, haze gray875 gal
Epoxy GlassflakeAmerlock 400GFK, Terracotta110 gal
Ablative A/FABC-3, black875 gal
Ablative A/FABC-3, red725 gal
Markings, U/WAmercoat 5450, White8 gal
SolventAmercoat T-10300 gal

4.2. Government Furnished Services (GFS):

4.2.1. Paint manufacturer’s Technical Field Service Representative

5.0 NOTES

5.1. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.

5.2. The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.3. THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4. THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

5.5. Grit blasting is specified due to the lack of adequate existing surface profile. No alternative surface preparation will be accepted. Bids should reflect all containment, staging and cover up necessary for grit blasting and airless spray application of the coating.

5.6. Government furnished solvents are for viscosity control only, not equipment clean up.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1. The government furnished paint manufacturer’s representative will provide quality assurance for the Government. This is above and beyond those QA requirements already imposed on the contractor.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.

7.2. Within 24 hours of docking wash the entire hull, from the keel to six inches (6") above the light load line with fresh water.

7.2.1. Water pressure shall be enough pressure to remove all marine growth (slime, grass, tube worms, barnacles, etcetera), peeling, blistered and flaking paint and salts.

7.2.2. Area includes but is not limited to; sea chests, strainer plates, thruster tunnel(s), bilge keels, struts and rudder.

7.3. Provide man lifts (cherry picker/JLG), any required safety gear and operator for use by MSCREP and contractor's QA inspector when inspecting hull surface preparations and coatings.

7.4. CHECKPOINT: Immediately following the completion of fresh water washing of the vessel’s underwater hull surfaces, conduct a hull coatings survey with the following personnel in attendance:

7.4.1. Paint Manufacturer’s Representative,

7.4.2. Contractor’s paint representative,

7.4.3. Port Engineer,

7.4.4. Ship’s Master or his designate

7.5. CHECKPOINT: Securely mask and protect all of the following with material of sufficient density to prevent entry of dirt, debris and grit blasting materials into the interior of the ship during grit blasting.

7.5.1. Impressed current reference cells and anodes

7.5.2. Zinc anodes

7.5.3. Transducers

7.5.4. Propeller shafts and shaft seals

7.5.5. All other openings in hull

7.6. Remove all sea chest strainer plates.

7.7. Inspect protective coverings no less than the start of each workday.

7.8. Prior to grit blasting, the deep and light load lines and other hull markings shall be marked, recorded and photographed for reference. Submit report.

7.9. Weld bead in and outline all draft marks and other hull markings as required to restore worn or missing weld marks.

7.10. Accomplish the requirements of Surface Preparation Standard SSPC-SP1, Solvent Cleaning, to remove all dirt, oil, grease, soluble salts or other organic matter.

7.10.1. Biodegradable cleaners or other eco-friendly methods/agents shall be used to the greatest extent possible.

7.10.2. CHECKPOINT: Upon completion of all cleaning, chloride testing shall be performed at random locations.

a. The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.

b. If contamination is found, additional tests shall be made to determine the extent of contamination and to prove the success of remediation.

7.11. Accomplish abrasive blasting in accordance with Surface Preparation Standard, SSPC-SP10/NACE 2, Near White Metal Blast Cleaning to the area identified in paragraph 3.1.1. See note 5.5

7.11.1. CHECKPOINT: The blast profile achieved shall be angular in nature and two (2) to four (4) mil deep.

7.11.2. Profile shall be determined using a Keane-Tator (or equal) Surface Profile Comparator.

7.11.3. Testex (or equal) Replica Tape shall be used at a rate of one (1) reading per 1,000 SF for verification.

7.11.4. Replica Tape shall be mounted, identified as to location and included as part of the final paint report.

7.12. CHECKPOINT: Immediately prior to coating the surface shall be re-tested for non-visual surface contaminates at random locations to ensure that the surfaces have not been re-contaminated.

7.12.1. The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.

7.12.2. If contamination is found, additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation.

7.12.3. Results of this testing shall be presented to the MSCREP at time of inspection for coating application.

7.13. Upon completion of exterior surface preparation and after approval by the MSCREP, apply the coating systems described below, in accordance with reference 2.2.

7.14. CHECKPOINT: Prior to applying any coat, the previous coat shall be proven properly cured and ready for follow on coating.

Coat
Product
Color
DFT
0-Coat (High turbulence only)
Amerlock 400FK
terracotta
10-12 mils
1st-Coat Epoxy
Amercoat 240
Red Oxide
5-6 mils
2nd Coat Epoxy
Amercoat 240
Haze gray
5-6 mils
3rd-Coat Ablative AF
ABC-3
black
5-6 mils
4th-Coat Ablative AF
ABC-3
red
5-6 mils
Underwater Hull markings
Amercoat 5450
white
3-4 mils

7.15. High turbulence areas are defined below:

7.15.1. Sea chest interiors and 12” around perimeter

7.15.2. Propeller turbulence area

7.15.3. Propulsion shaft tubes and struts

7.15.4. Rudders and rudder horns

7.15.5. Bow Thruster Tunnel

7.16. Boot topping shall be straight and neatly cut in.

7.17. All boot topping coats shall be black.

7.18. All hull markings are identified by reference 2.1.

7.19. Remove protections put in place with paragraph 7.5 upon completion of all coatings.

7.20. CHECKPOINT: Upon completion of hull coating, and before reinstallation of strainer plates, all sea chests and overboard discharges shall be inspected by the Port Engineer for cleanliness and removal of plugs.

7.20.1. Upon completion inspection identified in paragraph 7.20, reinstall all strainer plates using new Monel bolting and lock wire shall.

8.0 GENERAL REQUIREMENTS: None additional