0517_A_LTFW_COOLER_CLEANING_AND_GASKET_CHANGE_(TALT_426)_Rev1.doc

DOC document 58 KB Posted

Attached to
USNS CHARLES DREW: Regular Schedule Overhaul/Dry-Docking
Solicitation number
N32205-18-R-4252
Issued by

About this file

Revised WI 517

View the file

Other files

File Type Posted
N32205-18-R-4252_Amendment_0004.docx DOCX document
0902_B_REDOCKING_AND_UNDOCKING_VESSEL_REV.docx DOCX document
1048_A_FAS_FAIRLEAD_BLOCK_REMOTELY_FED_GREASE_LINES.doc DOC document
0941_A_FW_Stern_Tube_Lub_System_Install_TALT_403__Rev_2_V6_SA.doc DOC document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_COFFERDAMS_AND_SPACE_REV_3.doc DOC document
0501_A_FIREFIGHTING_INSPECTION_AND_TESTING_(1-YR)_REV_1.doc DOC document
0208_A_MDG_2_AND_3_9_CYL_30000_HR_SCHEDULED_MAINTENANCE_REV1.docx DOCX document
0207_A_MDG1_8_CYL_24000_HOUR_SCHEDULED_MAINTENANCE_11DEC17.docx DOCX document
0916_A_UNDERWATER_HULL_CLEANING_AND_PAINTING_(SPOT_BLAST_20).docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
0142_A_Tank_Coatings_Gray_WTR_and_FD_Waste_VRR17-057_Rev1.doc DOC document
1046_A_RAM_TENSIONER_REMOVAL_AND_REPLACEMENT.doc DOC document
0011_A_GENERAL_SERVICES_FOR_SHIP,_T_AKE,_REV_FEB_14_Rev1.doc DOC document
N32205-18-R-4252_Amendment_00003.docx DOCX document
0902_B_DRY_DOCKING_AND_UNDOCKING_VESSEL_REV_-.docx DOCX document
J_-_3_Category_B_Items.xls XLS spreadsheet
N32205-18-R-4252_Amendment_0002.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
N32205-18-R-4252_Amendment_0001.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS,_VOIDS,_COFFERDAMS_AND_SPACE_REV_2.doc DOC document
Work_Items.zip ZIP file
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS CHARLES DREW

(T-AKE 10)

MACHINERY, AUXILIARY SYSTEMS

N32205-18-R-4252

15 DECEMBER 2017

ITEM NO: 0517

CATEGORY “A”

MSC/N756/SA

LTFW COOLER CLEANING AND GASKET CHANGE (T ALT426)

1.0 ABSTRACT:

1.1 This item describes the cleaning of three LTFW coolers and replacing the gaskets with EPDM Type.

2.0 REFERENCES:

2.1 NAVSEA DWG No. 256-8498905 Rev -; Central Seawater Cooling System Diagram.

2.2 NAVSEA Dwg No. 532-8498931 Rev -; Low Temperature Freshwater Cooling System Diagram.

2.3 Tech Manual T9532-AZ-MMC-010, Heat Exchangers, Plate/Frame Type Central Low Temp Fresh Water.

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

3.1.1 Location:

-Main Machinery Space (5-66-0), 4th Deck, Frames 66 to 68

3.1.2 Quantity:

-Three (3) LT Fresh Water Heat Exchangers

3.2 Item Description/Manufacturer’s Data:

3.2.1 LTFW #1, #2, & #3 Plate Heat Exchangers

LT Plate Heat Exchanger

GEA Ecoflex GMbH

Type VT 2508 B-6

Max Working Press 101.5 PSI at 149F

MDMT 28.4F at 101.5 PSI

Test Press 9.1 Bar

Year Built 2003

Serial #s 179/50008

179/50009

179/50007

3.2.4 Bill of Materials: (Contractor Supplied):

Description
Part Number
QTY
Gaskets (EPDM)
100022227
1,100 ea. to include end pieces

3.2.5 Quantities are considered estimates. The Contractor shall provide the exact quantities and additional material such as miscellaneous pipe fittings, elbows, caps valves, pipe hangers, weld material, cable hangers, cable tags, bus work, etc., which are not included in the List of Materials in order to install a fully functional system which meets the requirements of this specification.

3.2.2 All components and piping shall be rated for use in the Central Seawater Cooling System as follows:

-Operating Temperature

95(F

-Design Temperature

95(F

-Operating Pressure

30.2 PSI

-Design Pressure

45.3 PSI

-ABS Class III Piping System

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.

5.0

NOTES:

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7 and 23.

5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area with out proper authorization.

5.4 THE USNS TAKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.

5.5 Rigging Pad eyes were installed during previous service.

5.6 Contractor shall assist “KEVLION Tech Reps” with all facets of repairs and interference and removals.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 The contractor must follow the minimum and maximum plate pack measurement stamped on the side of the fixed end frame.

6.2 All work to be accomplished to the satisfaction of the Chief Engineer and Port Engineer.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Ship’s Crew shall assistance isolation, tag out and secure the Salt Water Cooling and LT Fresh Water Cooling systems.

7.2 Drain both the LTFW and SW side of each heat exchanger. Dispose of LTFW in accordance with all Federal, State, and local requirements. LTFW is considered HAZMAT and shall be disposed of in accordance with work item “023 HAZARDOUS WASTE MANAGEMENT AND DISPOSAL”.

7.3 Disassemble and remove the end plates from each LTFW heat exchangers using References 2.1, 2.2 and 2.3 for guidance.

7.4 Provide Manufacturer’s Tech Rep to accomplish the removal, cleaning, regasketing, and reinstallation of each plate of all coolers.

7.4.1 Replace all gaskets with new EPDM gaskets.

7.4.2 Provide report of conditions found and recommendations to Port Engineer.

7.5 Reassemble heat exchangers using Reference 2.3 as guidance.

7.6 Preparation of Drawings/Documents: None.

7.7 Inspection/Testing:

7.7.1 Perform operational system pressure tests of each cooler. Inspect for leakage. No leakage is allowed. MSCREP to witness testing.

7.8 Painting:

7.13.1 Scale prime and paint and insulate all new and disturbed areas to match the surrounding areas.

7.9 Marking: None

7.10 Manufacturer's Representative:

7.10.1 Provide a “KEVLION” Technical Representative to be present during the removal, cleaning, installation, and LTFW Cooler commissioning.

RECOMMENDED SOURCE:

Malorie M. Malecki

After Sales & Service Coordinator.

4915 Highway 90 East.

Broussard, Louisiana 70518

Main Office Line: 337-445-3404

Direct Office Extention: 337-445-3399

Cell: 717-880-1229

Fax: 717-268-6162 malorie.malecki@kelvion.com www.kelvion.com

8.0 GENERAL REQUIREMENTS: None additional.

517 - 2