J-2_Contractor_Price_Breakdown_Cat_A_WIs_Rev_4.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- USNS ZEUS FY19 ROH/DD AVAILABILITY Federal contract opportunity
- Solicitation number
- N3220518R4151
About this file
J-2
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
USNS ZEUS (T-ARC 7) CONTRACTOR PRICE BREAKDOWN N32205-18-R-4151
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Govt Mand TR/Sub Price | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | |
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | ||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | ||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | ||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | ||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | ||||||||
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | ||||||||
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | ||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL STRUCTURES | |||||||||||
| 102 | Tank Inspections (ABS/USCG) | |||||||||||
| 104 | Freeboard Preservation | |||||||||||
| 105 | Ultrasonic Thickness Gauging (ABS) | |||||||||||
| 106 | Various Door Frame Steel Repairs | |||||||||||
| 108 | Refurbish Weather Tight Door (1-19-2) VRR-0015 | |||||||||||
| 109 | Refurbish Weather Tight Hatch (1-16-1) | |||||||||||
| 110 | Replace Drain and Rosebox | |||||||||||
| 111 | FO Tanks 7, 8, and 9 Steel Replacement | |||||||||||
| 112 | Replace Superstructure Steel Cable Deck Fr 19 | |||||||||||
| 115 | Steel Replacement around Plenum Intake | |||||||||||
| 117 | Stack Box Girder Preservations | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 202 | Inspect Main Propulsion Motors | |||||||||||
| 203 | Overhaul Stbd Motor Blower No. 2 | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | GMDSS Safety Radio Annual Cert | |||||||||||
| 402 | Radar ECDIS Preventative Maintenance | |||||||||||
| 403 | Magnectic Compass Calibration | |||||||||||
| 404 | Communications Suite Groom | |||||||||||
| 405 | Phone Groom and Tune | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | Halon and CO2 Extinguishing Systems Annual Inspection | |||||||||||
| 502 | Fire Alarm Annual Inspection | |||||||||||
| 503 | Portable Extinguishers Test and Inspection | |||||||||||
| 504 | Forward Crane Annual Certification | |||||||||||
| 505 | Aft Crane Annual Certification | |||||||||||
| 506 | Gage Calibration (VR-16-074) | |||||||||||
| 507 | Boiler Lay-up | |||||||||||
| 508 | Cable Handling Upgrades Shipyard Assist | |||||||||||
| 509 | Galley Mods Shipyard Assist | |||||||||||
| 510 | OWS Annual Inspection | |||||||||||
| 511 | Heavy Overboarding System (HOS) Replace plate | |||||||||||
| 512 | Cone 1 Ballast Manifold Overhaul | |||||||||||
| 515 | No. 3 A/C SW Pump Replacement | |||||||||||
| 516 | Gray Water Overboard Pipe Replacement | |||||||||||
| 517 | MISC Piping Replacement | |||||||||||
| 600 | ||||||||||||
| 601 | Inflatable Liferafts Annual Inspection | |||||||||||
| 602 | Rescue Boat Annual Inspection | |||||||||||
| 603 | Cargo Elevator Inspection and Certification | |||||||||||
| 604 | SCBA Annual Inspection | |||||||||||
| 700 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 701 | Crane, Forklift, Rigging and JLG Support Services | |||||||||||
| 702 | Replace Horizontal Roller | |||||||||||
| 703 | Bow Trolley Hoist Removal to Replace | |||||||||||
| 704 | Relocate ISO Container Pads | |||||||||||
| 705 | Antenna Mast Mods (T-Alt | |||||||||||
| 706 | Splice Shop Upgrades (T-Alt-T-ARC-16-010) | |||||||||||
| 707 | Install Line Conditioner in 460V | |||||||||||
| 708 | Refurbish Umbulical Chutes | |||||||||||
| 709 | HIPAP Upgrade (T-Alt-T-ARC-18-XXX) | |||||||||||
| 710 | ADCP Removal and Install | |||||||||||
| 711 | Sponsor Communictions Network Upgrade Support | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Laundry Duct Cleaning | |||||||||||
| 807 | Vent Hood Replacement | |||||||||||
| 900 | DRYDOCK | |||||||||||
| 901 | Docking and Undocking | |||||||||||
| 902 | Sea Chest and Strainer Plates | |||||||||||
| 903 | Underwater Hull Preservation | |||||||||||
| 904 | Anchors and Chains Preservation | |||||||||||
| 905 | Rudder and Bilge Keel Inspection | |||||||||||
| 906 | Sea Valves | |||||||||||
| 907 | Cathodic Protection System Inpection | |||||||||||
| 908 | Propeller Polishing and Inspection | |||||||||||
| 909 | Transducer Domes Clean and Inspection | |||||||||||
| 910 | Propulsion Shaft Removal and Inspection | |||||||||||
| TOTAL CATEGORY "A" ITEMS | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| USNS ZEUST (T-ARC 7) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-19-R-4151 |
ATTACHMENT J-2
Sheet1
| 302 | $ 62,880 | ||||||
| 303 | $ 54,200 | ||||||
| 503 | $ 74,080 | ||||||
| 509 | $ 20,880 | ||||||
| 510 | $ 2,022 | ||||||
| 514 | $ 17,200 | ||||||
| 602 | $ 59,540 | ||||||
| $ 290,802 | |||||||
| 701 | Crane, Forklift, Rigging and JLG Support Services | $ 47,280 | |||||
| 702 | Replace Horizontal Roller | $ 37,200 | |||||
| 703 | Bow Trolley Hoist Removal to Replace | $ 20,400 | |||||
| 704 | Relocate ISO Container Pads | $ 16,080 | |||||
| 705 | Antenna Mast Mods (T-Alt | $ 215,000 | |||||
| 706 | Splice Shop Upgrades (T-Alt-T-ARC-16-010) | $ 192,605 | |||||
| 707 | Install Line Conditioner in 460V | $ 11,050 | |||||
| 708 | Refurbish Umbulical Chutes | $ 16,650 | |||||
| 709 | HIPAP Upgrade (T-Alt-T-ARC-18-XXX) | $ 469,850 | |||||
| 710 | ADCP Removal and Install | $ 47,100 | |||||
| 711 | Sponsor Communictions Network Upgrade Support | $ 37,100 | |||||
| SPONSOR AGR HOURS 1,000 HOURS @ $55.00/HR | 1800 | $ 99,000 | 0 | 1800 | 0 | 99000 | |
| SPONSOR ADDITIONAL ODC | $ 50,000 | 0 | 50000 | 0 | 0 | 50000 | |
| 18% MARKUP ON ODC | $ 9,000 | 0 | 9000 | 0 | 0 | 9000 | |
| Total | $ 1,268,315 |
File details come from the government source that posted it.