N3220518R4151_AMENDMENT_0006.docx

DOCX document 79 KB Posted

Attached to
USNS ZEUS FY19 ROH/DD AVAILABILITY Federal contract opportunity
Solicitation number
N3220518R4151
Issued by
Department of the Navy Military Sealift Command

About this file

N32205-18-R-4151 Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to USNS ZEUS FY19 ROH/DD AVAILABILITY, newest first.
File Type Posted
J-2_Contractor_Price_Breakdown_Cat_A_WIs_Rev_4.xlsx XLSX spreadsheet
N3220518R4151_Amendment_00008.docx DOCX document
J-3_Contractor_Price_Breakdown_CAT_B_WIs_Rev_2.xlsx XLSX spreadsheet
N3220518R4151_Amendment_0007.docx DOCX document
J-3_Contractor_Price_Breakdown_CAT_B_WIs_Rev_2.xlsx XLSX spreadsheet
N3220518R4151_Amendment_0006_Conform_Copy.docx DOCX document
N3220518R4151_Amendment_0005.docx DOCX document
N3220518R4151-0003.docx.pdf PDF
N3220518R4151-0002.pdf PDF
N3220518R4151-0001.pdf PDF
CDRL,_SWI-006.pdf PDF
CDRL,_SWI-0018.pdf PDF
CDRL,_SWI-0020.pdf PDF
J-14_Technical_Data_Non-Disclosure.docx DOCX document
CDRL,_SWI-001.pdf PDF
CDRL,_SWI-0012.pdf PDF
USNS_ZEUS_FY19_ROH_JA_Redacted.pdf PDF
CDRL,_SWI-0017.pdf PDF
CDRL,_SWI-0016.pdf PDF
CDRL,_SWI-0010.pdf PDF
CDRL,_SWI-004.pdf PDF
J-3_Contractor_Price_Breakdown_CAT_B_WIs.xlsx XLSX spreadsheet
CDRL,_SWI-0014.pdf PDF
CDRL,_SWI-0015.pdf PDF
J-11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_9_Disclosure_of_Lobbying_Activities.doc DOC document
J-7_MSC_Ship_Repair_Facility_Survey.docx DOCX document
J-4_GFM_List.pdf PDF
J-13_Past_Performance_Questionnaire.docx DOCX document
CDRL,_SWI-0013.pdf PDF
J_-_8_Request_for_Specification_Clarification.doc DOC document
J-15_Non-Mariner_Maintenance_Contractor_Vetting_Sheet_(Rev_8_(v4)_20_Sep_2017).xlsx XLSX spreadsheet
CDRL,_SWI-0021.pdf PDF
J12_Past_Performance_Data.doc DOC document
CDRL,_SWI-0022.pdf PDF
J-2_Contractor_Price_Breakdown_Cat_A_WIs.xlsx XLSX spreadsheet
CDRL,_SWI-0024.pdf PDF
J-10_Interport_Differentials.docx DOCX document
N3220518R4151_.pdf PDF
CDRL,_SWI-0023.pdf PDF
CDRL,_SWI-0019.pdf PDF
ZEUS_ROH_-_SOURCES_SOUGHT.doc DOC document
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220518R4151

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0002AA

The CLIN extended description has changed from:

MSC AGR AND ODC(10,000) man-hours @ $________ per man-hour = $_____________ODCBase $350,000_____________ Proposed G&A Rate _______________% Subtotal: $_____________Proposed Profit Rate _______________% Subtotal: $_____________

To:

MSC AGR AND ODC(12,000) man-hours @ $________ per man-hour = $_____________ODCBase $500,000_____________ Proposed G&A Rate _______________% Subtotal: $_____________Proposed Profit Rate _______________% Subtotal: $_____________

CLIN 0003

The option status has changed from No Status to Option.

CLIN 0004

CLIN 0005

The CLIN description has changed from Category "B" WI 113 to Category "B" WI 101.

WI 113 - MISC Steel Replacement The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

WI 101 - Forward Gantry Preservation The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

CLIN 0006

The CLIN description has changed from Category "B" WI 911 to Category "B" WI 103.

WI 911 - Dry Dock Extension The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

WI 103 - Tank PreservationsThe KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

CLIN 0007

The CLIN description has changed from Category "B" WI 913 to Category "B" WI 113.

WI 913 - Propulsion Shaft Bearing Inspection The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

WI 113 - Misc Steel ReplacementThe KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

CLIN 0008

The CLIN description has changed from Category "B" WI 607 to Category "B" WI 114.

WI 607 - Carpet Installation and Tile Removal in Various Staterooms The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

WI 114 - Preserve Deck under Aft Fair leads and Dyno Tables The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

CLIN 0009

The CLIN description has changed from Category "B" WI 612 to Category "B" WI 116.

WI 612 - TILE RENEWAL The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

WI 116 - Preserve Deck under Cable Deck console The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

The option status has changed from No Status to Option.

CLIN 0010 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 201

FFP

WI 201 - Replace Exhaust Adapter on MDG No. 4

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

FOB: Destination J998

NET AMT

CLIN 0011 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 301

FFP

WI 301 - Switchboard Cleanings (VRR-16-048)

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0012 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 302

FFP

WI 302 - CTTS Instl for SSFC Pwr Sys Modification (T-Alt-17-005))

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0013 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 303

FFP

WI 303 - Remove K1 and VRTR CO Swithches (T-Alt-17-006)

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0014 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 605

FFP

WI 605 - Lifeboat and Davits Installation (T-Alt-13-006)

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0015 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 606

FFP

WI 606 - Chief Engineer Tile Replacement

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0016 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 607

FFP

WI 607 - Carpet Removal and Tile Installation in Various Staterooms

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0017 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 608

FFP

WI 608 - Terrazo and Tile Replacement; Various Places

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0018 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 609

FFP

WI 609 - Install PRC in Thwartship Passage and Decon Station

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0019 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 610

FFP

WI 610 - Replace Door (3-39.5-6) (VRR-16-077)

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0020 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 611

FFP

WI 611 - Replace Various Fire Safety Doors

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0021 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 612

FFP

WI 612 - Tile Renewal

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0022 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 802

FFP

WI 802 - Accomodation Duct Cleaning, Testing and Balancing

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0023 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 803

FFP

WI 803 - Recirculation System (S1-26-1) Duct Replacement

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0024 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 804

FFP

WI 804 - Replace Preheater S2-18-2 (VRR 18-021)

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0025 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 805

FFP

WI 805 - Fan Room No. 3 (1-18-2) Overhaul

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0026 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 806

FFP

WI 806 - Fan Room No. 4 (1-25.5-1) Overhaul

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0027 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 911

FFP

WI 911 - Dry Dock Extension

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0028 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 912

FFP

WI 912 - Electronic Marine Growth Inhibitor

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLIN 0029 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" WI 913

FFP

WI 913 - Propulsion Shaft Bearing Replacement

The KO will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

The following have been modified:

Section B - Supplies or Services and Prices

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0029 $______________

The contractor shall enter the total proposed price of all CLINs.

CLAUSES INCORPORATED BY FULL TEXT

PART I - THE SCHEDULE

Section B, Price Schedule, detailed information

CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.

CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded manhour rate and not separately priced.

The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

The base cost, stated in this CLIN does not include the profit or G&A rates.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

CLINs 0003 through 0029 –Attachment J-3 – Category “B” WIs provides a work item (WI) breakdown of CLIN 0003 through 0029 pricing.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

GENERAL

C-1 GENERAL

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS ZEUS (T-ARC 7) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

(b) Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.

(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

(j) Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

h. Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for birthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

k. Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

(c) The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

CLAUSES INCORPORATED BY FULL TEXT

C – 2 List of Standard WIs included for this solicitation:

000 General Requirements

001
Intent, Scope, General Condition, and Definitions
002
Technical and Manufacturer's Representative
003
Approach, Berth, and Mooring Requirements
004
Testing and Quality Assurance
005
Electrical Safety Procedure Requirements
006
Heavy Weather Plan
007
Cold Weather Plan
010
Furnish Office for Overhaul Management Team (OMT)
011
Furnish General Services
012
Telephone Services
013
Project Planning and Production Status Monitoring Reports
014
Preparation of Weight and Moment Report
015
Integrated Logistics and GFM Support Requirements
016
Fire Protection and Ship's Safety Program
018
Delivery and Redelivery of the Vessel
019
Shipboard Access and Security
020
Gas Free Certificates
021
Clean and Gas Free Tanks, Voids, Cofferdams, and Spaces
022
Dock Trails and Sea Trials
023
Hazardous Waste Disposal
024
Physical Security at Private Contractor's Facility

100 HULL STRUCTURE

102
Tank Inspections (ABS/USCG)
104
Freeboard Preservation
105
Ultrasonic Thickness Gauging (ABS)
106
Various Door Frame Steel Repairs
108
Refurbish Weather Tight Door (1-19-2) VRR-0015
109
Refurbish Weather Tight Hatch (1-16-1)
110
Replace Drain and Rosebox
111
FO Tanks 7, 8, and 9 Steel Replacement
112
Replace Superstructure Steel Cable Deck Fr 19
115
Steel Replacement around Plenum Intake
117
Stack Box Girder Preservations

200 MACHINERY, PROPULSION

202
Inspect Main Propulsion Motors
203
Overhaul Stbd Motor Blower No. 2

400 COMMUNICATION AND NAVIGATIONAL AIDS

401
GMDSS Safety Radio Annual Cerrt
402
Radar ECDIS Preventative Maintenance
403
Magnectic Compass Calibration
404
Communications Suite Groom
405
Phone Groom and Tune

500 MACHINERY, AUXILIARY SYSTEMS

501
Halon and CO2 Extinguishing Systems Annual Inspection
502
Fire Alarm Annual Inspection
503
Portable Extinguishers Test and Inspection
504
Forward Crane Annual Certification
505
Aft Crane Annual Certification
506
Gage Calibration (VR-16-074)
507
Boiler Lay-up
508
Cable Handling Upgrades Shipyard Assist
509
Galley Mods Shipyard Assist
510
OWS Annual Inspection
511
Heavy Overboarding System (HOS) Replace plate
512
Cone 1 Ballast Manifold Overhaul
515
No. 3 A/C SW Pump Replacement
516
Gray Water Overboard Pipe Replacement
517
MISC Piping Replacement

600 OUTFIT, FURNISHINGS AND HABITABILITY

601
Inflatable Liferafts Annual Inspection
602
Rescue Boat Annual Inspection
603
Cargo Elevator Inspection and Certification
604
SCBA Annual Inspection

700 MISSION RELATED EQUIPMENT

701
Crane, Forklift, Rigging and JLG Support Services
702
Replace Horizontal Roller
703
Bow Trolley Hoist Removal to Replace
704
Relocate ISO Container Pads
705
Antenna Mast Mods (T-Alt
706
Splice Shop Upgrades (T-Alt-T-ARC-16-010)
707
Install Line Conditioner in 460V
708
Refurbish Umbulical Chutes
709
HIPAP Upgrade (T-Alt-T-ARC-18-XXX)
710
ADCP Removal and Install
711
Sponsor Communictions Network Upgrade Support

800 HEATING, VENTILATION AND CONDITIONING

801
Laundry Duct Cleaning
807
Vent Hood Replacement

900 DRYDOCKING

901
Docking and Undocking
902
Sea Chest and Strainer Plates
903
Underwater Hull Preservation
904
Anchors and Chains Preservation
905
Rudder and Bilge Keel Inspection
906
Sea Valves
907
Cathodic Protection System Inpection
908
Propeller Polishing and Inspection
909
Transducer Domes Clean and Inspection
910
Propulsion Shaft Removal and Inspection

CAT “B” WORK ITEMS

025
Physical Security at Private Contractor’s Facility in Force Protection Charlie-Delta
030
Continuation of Services
101
Forward Gantry Preservation
103
Tank Preservations
113
Misc Steel Replacement
114
Preserve Deck under Aft Fair leads and Dyno Tables
116
Preserve Deck under Cable Deck console
201
Replace Exhaust Adapter on MDG No. 4
301
Switchboard Cleanings (VRR-16-048)
302
CTTS Instl for SSFC Pwr Sys Modification (T-Alt-17-005))
303
Remove K1 and VRTR CO Swithches (T-Alt-17-006)
605
Lifeboat and Davits Installation (T-Alt-13-006)
606
Chief Engineer Tile Replacement
607
Carpet Removal and Tile Installation in Various Staterooms
608
Terrazo and Tile Replacement; Various Places
609
Install PRC in Thwartship Passage and Decon Station
610
Replace Door (3-39.5-6) (VRR-16-077)
611
Replace Various Fire Safety Doors
612
Tile Renewal
802
Accomodation Duct Cleaning, Testing and Balancing
803
Recirculation System (S1-26-1) Duct Replacement
804
Replace Preheater S2-18-2 (VRR 18-021)
805
Fan Room No. 3 (1-18-2) Overhaul
806
Fan Room No. 4 (1-25.5-1) Overhaul
911
Dry Dock Extension
912
Electronic Marine Growth Inhibitor
913
Propulsion Shaft Bearing Replacement

SECTION D - PACKAGING AND MARKING

WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS

In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0010:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0011:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0012:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0013:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0014:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0015:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0016:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0017:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0018:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0019:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0020:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0021:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0022:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0023:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0024:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0025:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0026:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0027:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0028:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0029:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule for CLIN 0010 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

31-MAR-2019

N/A
N/A

The following Delivery Schedule for CLIN 0011 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0012 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0013 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0014 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0015 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0016 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0017 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0018 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0019 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0020 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0021 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0022 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0023 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0024 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0025 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0026 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0027 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0028 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

The following Delivery Schedule for CLIN 0029 has been added:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 01-DEC-2018 TO

N/A
N/A

(End of Summary of Changes) image1.wmf