Please see attached

View the file

Other files

File Type Posted
18-R-3516_Amend_8.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data_Revised.xlsx XLSX spreadsheet
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
N3220518R3516_Amend_7.docx DOCX document
18R3516_Q&A_14-16.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data_Revised.xlsx XLSX spreadsheet
N3220518R3516_Amendment_6.docx DOCX document
N32205-18-R-3516_Amend_5.pdf PDF
N32205-18-R-3516_Amend_4.pdf PDF
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_Q&A_13.docx DOCX document
N32205-18-R-3516_Amend_3.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_QA_1-12.docx DOCX document
N3220518R35160002.docx DOCX document
18R3516_RFP_PROFORMA_2018_Rev_1.docx DOCX document
N3220518R3516_0001.docx DOCX document
18R3516_Attach_I_SFLLL.pdf PDF
18R3516_Attach_H_Wage_Determination__2014-0800_Rev_11.pdf PDF
18R3516_Attach_D_DD254.pdf PDF
18R3516_Attach_F_Technical_Offer_Worksheet_-_SURTASS_E_-_r1.xlsx XLSX spreadsheet
18R3516_RFP_PROFORMA_2018.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3516_Attach_J_MECSP_Worksheet.doc DOC document
18R3516_Attach_E_PWS.docx DOCX document
18-R-3516_SF1449.docx DOCX document
18R3516_Attach_C_Crew_Complement.docx DOCX document
18R3516_Attach_M_Request_for_Clarification_Question.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-18-R-3516

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

17. Why is the deck requirement now a coplanar deck requirement when:

a. The previous two RFQ’s with the same equipment spread clearly allowed a multi-deck approach.

b. The equipment spread does not require coplanar locations nor has it ever required coplanar locations.

Answer: The Government mission system, as described in the PWS, will be containerized and placed on an ABS approved distribution system. Detailed footprint requirements are included in the PWS. Hardware design/configuration has matured with requirements captured in the PWS. The Government does not have option to reconfigure demonstration hardware for this charter period. A single deck configuration, consistent with the PWS requirements and diagram, is required.

18. Why has the noise criteria now changed to include recent ABS regulations which were non-existent until July 2018?

Answer: ABS regulations have been included as an alternate standard for industry, intended to open the aperture of vessel options to meet the government need.

19. Why has the mission period been reduced to 120 days firm with no extensions when the previous program had extensions allowed up to 319 days?

Answer: These are the days required under the revised requirement.