18R3516_Attach_E_PWS.docx

DOCX document 243 KB Posted

Attached to
SURTASS-E Support Vessel (short-term)
Solicitation number
N32205-18-R-3516
Issued by

About this file

Attachment E

View the file

Other files

File Type Posted
18-R-3516_Amend_8.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data_Revised.xlsx XLSX spreadsheet
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_QA_17-19.docx DOCX document
N3220518R3516_Amend_7.docx DOCX document
18R3516_Q&A_14-16.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data_Revised.xlsx XLSX spreadsheet
N3220518R3516_Amendment_6.docx DOCX document
N32205-18-R-3516_Amend_5.pdf PDF
N32205-18-R-3516_Amend_4.pdf PDF
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_Q&A_13.docx DOCX document
N32205-18-R-3516_Amend_3.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_QA_1-12.docx DOCX document
N3220518R35160002.docx DOCX document
18R3516_RFP_PROFORMA_2018_Rev_1.docx DOCX document
N3220518R3516_0001.docx DOCX document
18R3516_Attach_I_SFLLL.pdf PDF
18R3516_Attach_H_Wage_Determination__2014-0800_Rev_11.pdf PDF
18R3516_Attach_D_DD254.pdf PDF
18R3516_Attach_F_Technical_Offer_Worksheet_-_SURTASS_E_-_r1.xlsx XLSX spreadsheet
18R3516_RFP_PROFORMA_2018.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3516_Attach_J_MECSP_Worksheet.doc DOC document
18-R-3516_SF1449.docx DOCX document
18R3516_Attach_C_Crew_Complement.docx DOCX document
18R3516_Attach_M_Request_for_Clarification_Question.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

(ATTACHMENT E)

RFP # N32205-18-R-3516

SURTASS-E Support Vessel (short-term)

1.1 Mission. The Military Sealift Command (MSC) requests one US flagged or foreign flagged (to be reflagged U.S.) vessel required to tow an acoustic array in support of U.S. Navy Operations.

1.2 Area of Operation. The vessel will operate out Norfolk, VA throughout the Atlantic Ocean.

1.3 Operating Scenario. The vessel will tow a passive acoustic monitoring system, 3-7 kts, 24hrs/day for up to a 45 day event. The ship will need to be able to tow in a straight line for extended periods at slow speed. Because of the type of acoustic system to be employed, the ability of the vessel to maintain heading stability is critical.

1.4 Operational Support.

1.5 Delivery: Norfolk, VA

1.5.1 Pre Delivery Site Survey (PDSS): The vendor shall permit USG personnel to visit the ship no less than 15 days and no more than 45 days prior to the delivery date to conduct a PDSS. The purpose of this PDSS shall be to, at a minimum, identify lay-down locations of GFE/CFE equipment, identify locations of electrical outlets, and limit potential obstructions to operations.

1.6 Redelivery: Norfolk, VA

1.7 Charter Period: Firm Period: about 120 days, Option Period 1: about 60 days, and Option Period 2: about 60 days.

1.8 Government-Furnished Equipment (GFE)

No.
SURTASS –E VOO Capability
Mandatory Requirement
1
Vessel Classification and General Conditions
a. Shall be class by an International Association of Classification Society (IACS) member.

b. Shall be certified for Open Ocean Manned Operations per applicable USCG and/or ABS regulations

c. Certification Of Inspection (COI) shall be maintained for the entire duration of vessel lease

d. Shall be US Flag

e. The Master, officers, and entire crew shall be U.S. citizens. All deck officers are required to hold a SECRET security clearance prior to assignment.

f. Shall provide armed security while in port

g. Shall provide emergency medical services to all embarked personnel.

h. Shall provide sufficient life-saving equipment to meet local regulatory and SOLAS requirements for all embarked SURTASS-E personnel.

i. Shall provide fire-fighting coverage of all SURTASS-E ISO vans and elements on deck using the ship’s existing firefighting equipment.

i. Class A

ii. Class B

iii. Class C

j. For operating scenarios, the ship, with SURTASS-E installed, shall comply with all intact and damage stability criteria required by the ship's Flag Administration, Classification Society's Rules, and USCG Certificate.

k. Shall provide type accommodations for 15 SURTASS-E personnel. (2 officer equivalent, 13 unlicensed equivalent)

2
Vessel Characteristics - General
a. Vessel shall be capable of supporting a typical operations cycle of:

1. 4000 NM transit; 18 Days towing at 5 kts

2. Shall be capable of 32 days at sea un-replenished This includes:

a. fuel

b. food

c. berthing

d. potable water

e. waste disposal (sanitary)

b. Minimum Transit Speed: shall be no less than 12 kts

c. Operating Speed:

1. Vessel shall be able to tow a long line acoustic system at 5kts for 24 hours/day and maintain course within 5 degrees of desired heading in sea state 4;

2. Turning Rates: The ship must be capable of making controlled turns at 5 degrees/minute in sea state 5.

3. Deployment & Retrieval: The vessel shall be capable of maintaining a stable heading (within 5 degrees of desired course), while deploying and retrieving the acoustic system at speeds varying between 1-2 knots, for periods no less than 4 hrs.

4. During towing operations, the ship steerage shall not endanger the acoustic system by creating a thrust direction that would bring the acoustic system into contact with the ship propulsion or steerage equipment

5. Shall be able to conduct aft deck launch and recovery operations at 1-2 kts in Sea State 4.

d. Seakeeping:

1. Shall be able to tow the acoustic system on any heading at 5 kts in Sea State 4.

2. Shall be able to tow the acoustic system on best heading at 5 kts in Sea State 5.

NOTE: Sea states are as defined in NATO Standardization Agreement 4194 (Edition 1) “Standardized Wave and Wind Environments and Shipboard Reporting of Sea Conditions” (1983) as Amended (1985).

Sea State 4: wind 16-21 kts, wave heights 1.25-2.5 m Sea State 5: wind 22-27 kts, wave heights 2.5-4.0 m

e. Maximum freeboard at the mission deck shall be 10 ft. (3 m).

NOTE: The ship may be ballasted to achieve this maximum freeboard, provided it does not violate USCG or Classification Society regulations regarding stability.

If ballasted to achieve freeboard, new list & trim shall not exceed 5 degrees

f. Shall have a cargo loading capacity of 1025 lb/ft² (5 tons/m²)

g. Shall have a minimum deck load capacity 100 Long Tons.

h. Shall provide 150 kW of 440/460/480 VAC, 3-phase, Delta, 50-60 Hz, 200 Amp electric power. Power shall be stable and available 24 hr/day during mobilization, deployment, and de-mobilization.

Note:

1. The vessel shall provide electrical service via either one (1) 200 Amp service or Two (2) 100 Amp service.

2. Non-permanently installed generating equipment must not contribute to the radiated noise of the vessel in excess of the requirements outlined in Requirement 14 of this section.

3. Emergency back-up power shall be available (within 5 minutes) for SURTASS-E equipment.

i. Shall provide up to 500 gallons/day (1893 liters) of non-potable freshwater, no hydrocarbons, to the fantail for wash down of SURTASS-E equipment. Vessel shall provide connection to SURTASS-E systems if required.

j. Shall provide up to 40 gallons/min (151 liters) of seawater at a minimum of 50 psi to the fantail for cooling of the SURTASS-E equipment.

k. Shall provide workshop-quality compressed air to fantail for tools such as air driven wrenches.

l. Shall provide a crane with a 7.5 ton capacity with sufficient reach to lift the ISO vans and equipment from the pier to the stern of the ship.

3
Vessel Characteristics - Mission System Support
a. The vessel shall have a clear deck area of a minimum of 3100 ft2 (288m2).

b. Deck space may not be separated over more than two adjacent decks. If deck space is separated over two decks, provisions must be made by the vessel for power and data cableways between the two decks.

c. All deck space must allow the installation of high cube ISO containers.

d. The vessel shall have a stern/over boarding section of 30 ft (9.14m) wide 50 ft.(15.74m) immediately forward of transom for deployment & retrieval of acoustic system.

e. The 30 ft (9.14m) dimension shall be along the transom.

f. Exclusive of the stern/over boarding section, the remaining deck shall be no smaller than 1600 ft2 (148.64m2) and may be separated into smaller sections but no individual area shall be smaller than 870 ft2 (81m2).

NOTE: The SURTASS-E notional footprint can be found in the concept ship Deck Layout, Appendix 1. Exact deck layout will be based on vessel selection.

g. The vessel shall provide sufficient opening of any stern wall to provide for the unobstructed over-boarding of the SURTASS-E Acoustic system via the stern chute. A minimum of an 18.5 ft. (5.64 m) opening shall be required. The centerline of the opening must be the same as the centerline of the deck space for the winch specified in paragraph 3d.

h. The deck shall be coplanar with a maximum vertical deviation of 2 in (5.08 cm) when measured from the transom to 50 ft (11 m) forward of the transom for SURTASS-E Winch/Acoustic system Handling Equipment.

i. There shall not be any Ship’s deck hardware with a vertical height of 2 in (5.08 cm) or greater from the deck in the way of SURTASS-E bases NOTE: This includes any retractable deck equipment that is needed for routine operations of the vessel to include mooring or maneuvering with tugs

j. The deck and deck attachment points must not have damage or cracking, cracked welds, excessive pitting or corrosion.

k. Deck attachment shall support welding of mating structures for acoustic system. The deck may be fitted with standard ISO container attachment points to allow securing acoustic system equipment to deck.

l. Shall support winch tow loading of 75,000 lbs (333616 Newtons)

m. Freeboard at the mission deck and gunwale shall allow for the deployment of one or two 10-30 foot (3.05-9.14m) vertical poles, one supporting an acoustic speed sensor and a second pole supporting a fathometer transducer. Both poles will be deployed over the side during towing operations

n. The vessel shall provide one Mechanical technician to perform maintenance & repairs on the Hydraulic Power Unit.

o. The vessel shall provide one Electrical technician to preform maintenance & repairs on the Power Distribution System Electrical ISO Van.

p. The vessel shall provide an ABS certified welder for mobilization & de-mobilization.

4
Vessel Characteristics - Radiated Noise
a. During normal towing operations, the ship radiated noise cannot exceed the requirements as set forth in the Rules for Classification of Ships, January 2010, Part 6 Chapter 24, Det Norske Veritas (DNV) SILENT-R – vessels engaged in research or other noise critical operations;

b. The vessel contractor must provide documentation to show that Ship’s radiated noise is at or below the curve for: Rules for Classification of Ships, January 2010, Part 6 Chapter 24, Det Norske Veritas (DNV) SILENT-R – vessels engaged in research or other noise critical operations; documentation shall be in accordance with, Det Norske Veritas (DNV) SILENT-R, para C100.

The Acoustic system is designed to be a self-contained accredited Mission System, capable of rapid mobilization on a Vessel of Opportunity (VOO). Items 1- 9, provide basic capability for all mobilizations. Item 1- Winch and Acoustic system Handling System with stern chute, Item 2 – Hydraulic Power Unit for the winch, Item 3 - OBRP Module Storage Reels, Item 4 - Processing equipment, Item 5 – Technician/Operators, Item 6 - C4I Suite for communications, Item 7 - Acoustic system workshop, Item 8 - Power Distribution Unit, Item 9 - Deck Equipment Support Structures & Mounts.

Item
Description
area (ft2)
weight (lbs)
1
Winch and Acoustic System Handling System with Stern Chute
1035
52,000
2
Winch Hydraulic Power Unit (HPU)
290
12,000
3
OBRP Module Storage Reels
290
12,000
4
Processing
290
14,000
5
Technician
290
12,000
6
Communications
290
13,500
7
Acoustic system Workshop
290
12,500
8
Power Distribution Unit
290
15,000
9
Deck Equipment Support Structures & Mounts
0
23,000
total
3,065
166,000

Preferred Deck Layout

Notes:

a. Clear deck area of 3100 ft2(288m2).

b. Deck space may not be separated over more than two adjacent decks.

c. A stern / over boarding section with a minimum area of 1500 ft2(139.4m2).

d. A clear deck area of 30 ft (9.14m) wide x 50 ft.(15.74m) forward of transom for deployment & retrieval of acoustic system.

image1.png image2.png