18R3516_Attach_J_MECSP_Worksheet.doc

DOC document 29 KB Posted

Attached to
SURTASS-E Support Vessel (short-term)
Solicitation number
N32205-18-R-3516
Issued by

About this file

Attachment J

View the file

Other files

File Type Posted
18-R-3516_Amend_8.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data_Revised.xlsx XLSX spreadsheet
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_QA_17-19.docx DOCX document
N3220518R3516_Amend_7.docx DOCX document
18R3516_Q&A_14-16.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data_Revised.xlsx XLSX spreadsheet
N3220518R3516_Amendment_6.docx DOCX document
N32205-18-R-3516_Amend_5.pdf PDF
N32205-18-R-3516_Amend_4.pdf PDF
18R3516_RFP_PROFORMA_2018_Revised.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_Q&A_13.docx DOCX document
N32205-18-R-3516_Amend_3.docx DOCX document
18R3516_Attach_E_PWS_Revised.docx DOCX document
18R3516_QA_1-12.docx DOCX document
N3220518R35160002.docx DOCX document
18R3516_RFP_PROFORMA_2018_Rev_1.docx DOCX document
N3220518R3516_0001.docx DOCX document
18R3516_Attach_I_SFLLL.pdf PDF
18R3516_Attach_H_Wage_Determination__2014-0800_Rev_11.pdf PDF
18R3516_Attach_D_DD254.pdf PDF
18R3516_Attach_F_Technical_Offer_Worksheet_-_SURTASS_E_-_r1.xlsx XLSX spreadsheet
18R3516_RFP_PROFORMA_2018.docx DOCX document
18R3516_Attach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3516_Attach_E_PWS.docx DOCX document
18-R-3516_SF1449.docx DOCX document
18R3516_Attach_C_Crew_Complement.docx DOCX document
18R3516_Attach_M_Request_for_Clarification_Question.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-18-R-3516 ATTACHMENT J

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES, and Part X of the RFP, offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Part X section “l. BUSINESS PROPOSAL” of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, offerors must respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b)(2)(i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b)(2)(ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b)(2)(iii)).

5. Address any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel (DFARS 252.237-7024(b)(2)(iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b)(2)(v)).

MECSP Worksheet

File details come from the government source that posted it.