Attachment_2_-_QASP.doc

DOC document 54 KB Posted

Attached to
CIVMAR Lodging in Norfolk, VA
Solicitation number
N32205-18-R-2004
Issued by

About this file

Attachment 2 - Quality Assurance Surveillance Plan

View the file

Other files

File Type Posted
Q&A_Number_3__N32205-18-R-2004.docx DOCX document
Q&A_Number_2_Doc.docx DOCX document
Amendment_0001_N32205-18-R-2004.doc DOC document
Attachment_4_-_Past_Performance_Questionnaire.doc DOC document
Questions_and_Answers.doc DOC document
N32205-18-R-2004.docx DOCX document
Attachment_1_-_Checklist_of_Technical_Requirements.xls XLS spreadsheet
Attachment_3_-_Past_Performance_Data_Sheet.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

Contract Number: N3220518PXXX

Contract Description: CSU East Lodging and Transportation

Contractor’s Name: To Be Determined (TBD) (hereafter referred to as the contractor).

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

The following FAR clause may apply depending on contract type: 52.212-4(a) Inspection/Acceptance

2. Government Roles and Responsibilities.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO: Steve Parker

Telephone: 757-443-XXXX Email: XXXX@navy.mil

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Assigned COR: Sharon Stailey

Telephone: (757) 443-XXXX Email: XXXX@navy.mil

3. Contractor Representatives:

The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.

a. Program Manager – TBD

Telephone: TBD Email: TBD

b. Task Manager – TBD

Telephone: TBD Email: TBD

4. Performance Standards.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

5. Incentives.

The Government shall use past performance as an incentive. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. Methods of QA Surveillance.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the Contract Specialist shall be responsible for monitoring the contractor’s performance in meeting a specific performance.

a. MANAGEMENT INFORMATION SYSTEMS (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)

b. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the Contract Officer’s actions.

8. Ratings.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Exceptional:
Performance significantly exceeds contract requirements to the Government’s benefit.
Satisfactory:
Performance meets contractual requirements.
Unsatisfactory:
Performance does not meet contractual requirements.

9. DOCUMENTING PERFORMANCE.

a. Acceptable Performance.

The Government shall document positive performance. A report template is attached.

b. Unacceptable performance.

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions or other actions deemed necessary by the KO.

10. Frequency of Measurement.

a. Frequency of Measurement. During contract/order performance, the COR shall take periodic measurements, whenever a deficiency is detected, as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings. The COR shall meet with the contractor semi-annually but will only assess performance annually. The COR will provide a written performance assessment (CPARS).

Prepared by: Sharon XXXXX

Signature – Contracting Officer’s Representative

Contract Discrepancy Report (CDR)

1. Contract Number: <insert number>

2. TO: (Contractor Task Manager or on-site representative) <insert name>

3. FROM: (Name of COR) <insert name>

4. Date and time observed discrepancy:

5. DISCREPANCY OR PROBLEM:

<Describe in detail. Identify any attachments.>

5. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: <Enter COR’s name>

Signature – Contracting Officer’s Representative

Date

Received by:

Signature - Contractor Task Manager or on-site representative

Date

QASP MATRIX

Deliverable or Service Requirement
Measurement/Metric
Performance

Standard

Acceptable Quality Level (AQL)
Method of

Surveillance Incentive

Failure in more than any 1 metrics below or continued failure in any or all of the below performance work metrics may cause the contractor to be penalized.

Ability to provide the required number of hotel rooms daily as specified under the contract
Timeliness and Quality
Quality –All requirements are completed as required.

Timeliness – Requirements are performed as prescribed.

100%
Customer feedback
Positive past performance feedback
Ability to meet all technical requirements outlined in the contract for both the prime facility and the overflow facilities
Timeliness and Quality
Quality –All requirements are completed as required.

Timeliness – Requirements are performed as prescribed.

100%
Customer feedback
Positive past performance feedback
Less than 5 complaints filed per quarter regarding meeting technical requirements of the contract
Quality
Quality - Number of complaints received concerning technical requirements or lack of
90%
Customer Feedback

Positive past performance feedback

Ability to address and correct complaints filed regarding the technical requirements of the contract within 24 hours
Timeliness & Quality
Quality – All requirements are completed as required.

Timeliness – Requirements are performed as prescribed.

90%
Customer Feedback
Positive past performance feedback

< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>

PAGE

Attachment 2

File details come from the government source that posted it.