0025_B_Physical_Security_at_Private_Contractor's_Facility__MARCH_2017_N10_N00L_Comments.doc
DOC document 70 KB Posted
- Attached to
- USNS CESAR CHAVEZ: Regular Overhaul and Dry Docking Federal contract opportunity
- Solicitation number
- N32205-17-R-4205
About this file
Revised work item 025
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS CESAR CHAVEZ
(T-AKE 14)
General Requirements
N32205-17-R-4205
MARCH 2017
ITEM NO. 025
Category "B"
MSC/N10
physical security AT PRIVATE CONTRACTOR’S FACILITY
1.0 ABSTRACT:
1.1 This item describes the requirements for the physical security of the vessel and its crew while at the contractor’s facility for Force Protection Condition (FPCON) CHARLIE and DELTA.
1.2 The contractor shall provide a bid price on Attachment J-3 for establishing and maintaining the shipyard’s Force Protection (FP) posture from BRAVO to CHARLIE and CHARLIE to DELTA. Additionally, the contractor shall provide a per-day rate to maintain FP Conditions above Condition BRAVO.
1.3 Pricing format:
| CHARLIE |
| DELTA |
$ COST TO ESTABLISH
| $ |
| $ |
$ COST PER DAY TO MAINTAIN
| $ |
| $ |
2.0 REFERENCES:
2.1 COMSCINST 5530.3 Series, Military Sealift Command (MSC) Shipboard Antiterrorism (AT) Program
2.2 NAVSEA Standard Item 009-72 “CURRENT FY REVISION”, Physical Security at Private Contractor’s Facility
2.3 33 C.F.R. Part 165, Regulated Navigation Areas and Limited Access Areas
3.0 ITEM LOCATION AND DESCRIPTION:
3.1 Vessel located at contractor’s facility
4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES: None
5.0 NOTES:
5.1 The contractor and subcontractors must consult Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements.
5.2 The contractor and subcontractors shall review other work items under this contract, to determine their effect on the work required by this item. Based on this review the contractor shall plan and schedule work to minimize conflicts between work items.
5.3 The definitions of many terms used in this work item are found in work item 001.
5.4 Work item 019 addresses actual shipboard vessel access and security.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK:
7.1 The Contractor shall, within 24 hours of notice, implement and maintain the physical security requirements for the vessel and the crew for FPCON CHARLIE or DELTA in accordance with the References in 2.0 above while the vessel is located at the contractor’s facility as directed by the Contracting Officer. The Contractor shall maintain and provide such physical security requirements until otherwise directed by the Contracting Officer.
7.2 The Contractor shall implement and maintain any additional, special physical security requirements for the vessel and crew for FPCON CHARLIE or DELTA as directed by the Contracting Officer while the vessel is located at the contractor’s facility. The Contractor shall maintain and provide such additional, special physical security requirements until otherwise directed by the Contracting Officer. Any additional, special physical security measures for FPCON CHARLIE or DELTA will be authorized under the Changes Clause, DFARS 252.217-7003.
8.0 GENERAL REQUIREMENTS: None additional 025-1