0024_A_Physical_Security_at_Private_Contractor's_Facility__31_MARCH_2017_N10__N00L_Comments.doc

DOC document 64 KB Posted

Attached to
USNS CESAR CHAVEZ: Regular Overhaul and Dry Docking
Solicitation number
N32205-17-R-4205
Issued by

About this file

Revised work item 024

View the file

Other files

File Type Posted
0903_A_PROPELLER_SHAFT_AND_STERN_TUBE_INSPECTION_REV_A(6Apr17).docx DOCX document
Appleton_Crane_Hose_list_8391521.pdf PDF
0504_A__CRANE_RETESTING_SURVEY_AND_HYDRAULIC_HOSE_REV_-_(6Apr17).docx DOCX document
N32205-17-R-4205-U0004.docx DOCX document
Q_AND_A_responses_4.docx DOCX document
N32205-17-R-4205-U0003.docx DOCX document
J_-_3_Category_B_Items_REV_3-31-17.xls XLS spreadsheet
J_-_2_Category_A_Items_REV_3-31-17.xls XLS spreadsheet
0025_B_Physical_Security_at_Private_Contractor's_Facility__MARCH_2017_N10_N00L_Comments.doc DOC document
2017_CCZ_ROH_Final_Amendment.zip ZIP file
8499169-_VACUUM_SEWAGE_and_PLUMBING_DRAINS_SYSTEM_DIAGRAM_(TAKE14).pdf PDF
J_-_8_Request_for_Spec_Clarification__005.doc DOC document
Q_AND_A_Responses_3.docx DOCX document
Q_AND_A_Responses_2.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
N32205-17-R-4205_Amendment_00002.docx DOCX document
References_Work_Item_1006.zip ZIP file
N32205-17-R-4205_Revised_WI's_and_J-Attachments_Amendment_0002.zip ZIP file
0431_A_ADNS-SFF_SYSTEM_SUPPORT_REV_-.docx DOCX document
N32205-17-R-4205_U0001.docx DOCX document
8494557_B_USQ-144_ADNS_installation.pdf PDF
J_-_2_Category_A_Items.xls XLS spreadsheet
Solicitaion_Work_Package_N32205-17-R-4205.zip ZIP file
USNS_CESAR_CHAVEZ_J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS CESAR CHAVEZ

(T-AKE 14)

General Requirements

N32205-17-R-4205

MARCH 2017

ITEM NO. 024

Category "A"

MSC/N10

physical security AT PRIVATE CONTRACTOR’S FACILITY

1.0 ABSTRACT:

1.1 This item describes the requirements for the physical security of the vessel and its crew while at the contractor’s facility for Force Protection Condition (FPCON) BRAVO.

1.2 The contractor shall provide a bid price on Attachment J-2 for establishing and maintaining the shipyard’s Force Protection (FP) posture at BRAVO.

1.3 Physical security requirements for the vessel and its crew while at the contractor’s facility required by a different FPCON will be implemented by the Contracting Officer as an option in accordance with Category “B” Work Item 025.

2.0 REFERENCES:

2.1 COMSCINST 5530.3 Series, Military Sealift Command (MSC) Shipboard Antiterrorism (AT) Program

2.2 NAVSEA Standard Item 009-72 “CURRENT FY REVISION”, Physical Security at Private Contractor’s Facility

2.3 33 C.F.R. Part 165, Regulated Navigation Areas and Limited Access Areas

3.0 ITEM LOCATION AND DESCRIPTION:

3.1 Vessel located at contractor’s facility.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES: None

5.0 NOTES:

5.1 The contractor and subcontractors must consult Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements.

5.2 The contractor and subcontractors shall review other work items under this contract, to determine their effect on the work required by this item. Based on this review the contractor shall plan and schedule work to minimize conflicts between work items.

5.3 The definitions of many terms used in this work item are found in work item 001.

5.4 Work item 019 addresses actual shipboard vessel security.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK:

7.1 The current FPCON is BRAVO. The Contracting Officer will notify the contractor of any changes in the FPCON or additional measures required during the period of performance.

7.2 The Contractor shall maintain the physical security requirements for the vessel and the crew for FPCON BRAVO in accordance with the References in 2.0 above while the vessel is located at the contractor’s facility.

7.3 The Contractor shall maintain any additional, special physical security requirements for the vessel and at crew for FPCON BRAVO as directed by the Contracting Officer while the vessel is located at the contractor’s facility. Any additional, special physical security measures for FPCON BRAVO will be authorized under the Changes Clause, DFARS 252.217-7003.

8.0 GENERAL REQUIREMENTS: None additional 024-1