N32205-17-R-4205_U0001.docx

DOCX document 41 KB Posted

Attached to
USNS CESAR CHAVEZ: Regular Overhaul and Dry Docking Federal contract opportunity
Solicitation number
N32205-17-R-4205
Issued by
Department of the Navy Military Sealift Command

About this file

N32205-17-R-4205 Amendment.

View the file

Other files for this federal contract opportunity

Other files attached to USNS CESAR CHAVEZ: Regular Overhaul and Dry Docking, newest first.
File Type Posted
0903_A_PROPELLER_SHAFT_AND_STERN_TUBE_INSPECTION_REV_A(6Apr17).docx DOCX document
N32205-17-R-4205-U0004.docx DOCX document
0504_A__CRANE_RETESTING_SURVEY_AND_HYDRAULIC_HOSE_REV_-_(6Apr17).docx DOCX document
Appleton_Crane_Hose_list_8391521.pdf PDF
Q_AND_A_responses_4.docx DOCX document
0024_A_Physical_Security_at_Private_Contractor's_Facility__31_MARCH_2017_N10__N00L_Comments.doc DOC document
J_-_3_Category_B_Items_REV_3-31-17.xls XLS spreadsheet
J_-_2_Category_A_Items_REV_3-31-17.xls XLS spreadsheet
0025_B_Physical_Security_at_Private_Contractor's_Facility__MARCH_2017_N10_N00L_Comments.doc DOC document
2017_CCZ_ROH_Final_Amendment.zip ZIP file
N32205-17-R-4205-U0003.docx DOCX document
J_-_8_Request_for_Spec_Clarification__005.doc DOC document
8499169-_VACUUM_SEWAGE_and_PLUMBING_DRAINS_SYSTEM_DIAGRAM_(TAKE14).pdf PDF
Q_AND_A_Responses_3.docx DOCX document
Q_AND_A_Responses_2.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
References_Work_Item_1006.zip ZIP file
N32205-17-R-4205_Amendment_00002.docx DOCX document
N32205-17-R-4205_Revised_WI's_and_J-Attachments_Amendment_0002.zip ZIP file
8494557_B_USQ-144_ADNS_installation.pdf PDF
J_-_2_Category_A_Items.xls XLS spreadsheet
0431_A_ADNS-SFF_SYSTEM_SUPPORT_REV_-.docx DOCX document
Solicitaion_Work_Package_N32205-17-R-4205.zip ZIP file
USNS_CESAR_CHAVEZ_J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4205

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard Work Items included for this solicitation:

Work Item
Work Item Title
Category

000 GENERAL REQUIREMENTS

001
Intent, Scope, General Requirements, And Definitions
NSP
002
Technical And Manufacturer’s Representatives
NSP
003
Approach, Berth, And Mooring Requirements
NSP
004
Testing And Quality Assurance
NSP
005
Electrical Safety Procedure Requirements
NSP
006
Heavy Weather Plan
NSP
007
Cold Weather Plan
NSP
0010
Furnish Office For Overhaul Management Team (OMT)
A
0011
Furnish General Services (T-AKE)
A
0012
Telephone Services
A
0013
Project Planning And Production Status Monitoring Reports
A
0014
Preparation Of Weight And Moment Report
A
0015
Integrated Logistics And GFM Support Requirements
A
0016
Fire Protection And Ship's Safety Program
A
0017
Handling Ship's Stores
A
0018
Delivery And Redelivery Of The Vessel
A
0019
Shipboard Access And Security
A
0020
Gas Free Certificates
A
0021
Clean And Gas Free Tanks, Voids, Cofferdams & Spaces
A
0022
Dock Trials And Sea Trials
A
0023
Hazardous Waste Disposal At a Contractor's Facility
A
0024
Physical Security At Private Contractor’s Facility
NSP
0025
Physical Security At Private Contractor’s Facility In Force Protection Conditions Bravo - Delta
B
0030
Continuation of Services
B

100 HULL STRUCTURAL

0108
Tank Boundary Testing and Structural Survey (ABS)
A
0141
Replace Mooring line fairleads (correct material discrepancy)
A
0142
Blast And Coat Tanks (food waste and grey water)
A
0143
Forward Crane Boom Rest Pedestal Repair (TALT 402)
A

200 MACHINERY PROPULSION

0201
Propulsion Motor and Cooler Cleaning
A
0202
5 year Main Engine Flex Hose Replacement
A
0205
AUTOMATION AND PROP ANNUAL TESTING_REV -
A
0206
MDG Vulkan Coupling Inspection
A
0210
MDG 12,000 HR Overhaul
A
0231
Splash Oil and Test Circuit Modification (TALT-381R)
A

300 ELECTRICAL

0301
Cleaning Main Generators And Propulsion Control System (5-YR)
A
0303
High Voltage, Ship's Service, And Emergency Switchboard Inspection And Cleaning
A
0331
Bilge Alarms Distribution Trunks (TALT 393)
A
0342
Shipyard support for installation of AESS UPS (TALT 434)
A

400 Communication and Navigational Aids

0401
Bridge Equipment Annual Service
A

OE-570/WSC Antenna System Maintenance Automated Digital Network System (ADNS-SFF) Support REV- A A

0441
NAVMACSII Shipyard Industrial Assistance (TALT 454)
A
0442
VDR Generation 4 Upgrade (TALT 413)
A
0443
Upgrade Gyro CPU
A

500 Machinery, Auxiliary Systems

0501
Firefighting System Annual Inspection
A
0502
SCBA Annual Inspection
A
0503
SCBA Air Compressor And Filling Station Inspection And Maintenance
A
0504
5 Yr. Crane Retesting Survey and Hose Replacement (ABS)
A
0507
5 year Emergency Diesel Flex Hose Replacement
A
0510
Oil Content Meter Calibration
A
0512
Magazine Sprinkler Gauge Calibration
A
0513
Gauge Calibration (INCLUDE GPETE)
A
0514
Relief Valve Testing
A
0515
Testing And Certification Of HP Air Receivers
A
0516
Sewage System Piping Flush
A
0519
LTFW Cooler Cleaning and Regasketing
A
0520
HTFW Cooler Cleaning and Regasketing
A
0528
Magazine control valve inspection/overhaul
A
0551
Miscellaneous Pipe Repair - Replacement (VR16-019 VR16-018)
A
0552
Replace HP Air Fittings
A
0553
HTFW Pump overhaul
A
0554
LTFW Pump overhaul and motor replace
A
0555
Fire Charging Pump Overhaul
A
0556
Repair Miscellaneous Valves
A
0557
Repair Pressure Regulating Valves
A
0558
Replace Cascade Restrictive Orifice Device (CORD)
A
0559
Install drains at RO unit (VR16-002)
A
0560
Repair MSD discharge chamber TLI (VR16-017)
A
0561
Replace 01 Level roller door motor operators
A
0562
Correct Potable Water Pump Short Cycle (VR16-016)
A
0563
#2 fire sprinkling pump overhaul
A
0564
#1 Dewater/Ballast Pump Overhaul
A
0567
MARPOL Annex VI Fuel Sampling (TALT 377)
A
0568
MMR AFFF System Piping Replacement (TALT 394)
A
0569
Forward AFFF System Piping Replacement (TALT 394)
A

600 Outfit, Furnishings and Habitability

0602
Accommodation Ladder Inspection And Load Testing
A
0603
FASSMER Lifeboat and Davits Inspections
A
0604
FASSMER Rescue Boat and Davits Inspections
A
0605
Life Raft certification
A
0606
Renew Flight Deck Non-skid
A
0607
Renew hanger bay Non-skid
A
0641
Lagging And Insulation Repair
A
0643
Replace Deck Covering In Waste Processing Room
A
0644
Replace Deck Covering In Fast Food Serving Line Annex
A
0645
Replace Deck Covering In Galley
A
0649
Preservation Of Machinery Space Fan Rooms
A
0652
Galley Serving Window Repair (VR-16-021)
A

700 Sponsor Equipment

800 Heating, Ventialtion, and Air Conditioning

0801
Galley and Laundry Exhaust Duct Cleaning
A
0841
Replace Heaters AC741 and AC732
A

900 Drydocking And Undocking

0901
Dry-Docking And Undocking Ship
A
0902
Additional Dock days
B
0903
Propeller Shaft And Stern Tube Inspection
A
0905
Bow Thruster 5 Year Maintenance
A
0908
Renew Seachest, Rope Guard, And Bow Thruster Zincs
A
0909
Anchor and Anchor Chain Ranging
A
0910
Overhaul Sea Valves
A
0911
Inspect And Repair Cathodic Protection
A
0913
Renew Waster Pieces
A
0916
Underwater Hull Cleaning And Painting
A
0941
Freshwater (Closed Loop) Stern Tube Lubrication System (TALT403)
A
0952
Restore draft markings on stern
A

1000 Underway Replenishment Gear

1001
Sliding Block Hoist Chain Replacement
A
1006
E-STREAM Upgrade Station 6 Rev - (04-May-16)
A

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .