N32205-14-R-3004_0004.doc

DOC document 47 KB Posted

Attached to
USNS MEDGAR EVERS (T-AKE 13) REGULAR OVERHAUL/DRYDOCKING (ROH/DD) Federal contract opportunity
Solicitation number
N32205-14-R-3004
Issued by
Department of the Navy Military Sealift Command

About this file

SOLICITATION AMEND N32205-14-R-3004 0004

View the file

Other files for this federal contract opportunity

Other files attached to USNS MEDGAR EVERS (T-AKE 13) REGULAR OVERHAUL/DRYDOCKING (ROH/DD), newest first.
File Type Posted
14-R-3004_Amend_0006.doc DOC document
0021_A__AMENDMENT_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012.doc DOC document
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Amend_00005.doc DOC document
N322205-14-R-3004_Amend_0005.doc DOC document
0302_A_HV-SS-EMERGENCY_SWITCHBOARD_CLEANING_Rev_1.doc DOC document
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Amend_0001_Redacted.pdf PDF
N32205-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_WORK_ITEM_INDEX_REV_2.doc DOC document
1003_A_SLIDING_BLOCK_RUBBER_BUMPER_REPLACEMENT.doc DOC document
J-2_Category_A_Items_Rev_2.xls XLS spreadsheet
0519_A_ANCHOR_WINDLASS_SHAFT_BUSHING_REPLACEMENT.doc DOC document
J-3_Category_B_Items_Rev_2.xlsx XLSX spreadsheet
N32205-14-R-3004_0003.doc DOC document
J-2_Category_A_Items_Rev_1.xls XLS spreadsheet
N32205-14-R-3004_0002.doc DOC document
Q_AND_A_No._3.docx DOCX document
0902_A__PROPELLER_SHAFT_AND_STERN_TUBE_INSPECTION_Rev_1.doc DOC document
N32205-14-R-3004_0001.doc DOC document
INDEX_-DRYDOCK_USNS_MEDGAR_-Aug__2014_Rev_1.doc DOC document
J_-_3_Category_B_Items_Rev_1.xlsx XLSX spreadsheet
Q_AND_A_No._2.docx DOCX document
Q_AND_A_No._1.docx DOCX document
N32205-14-R-3004_Work_Items_1-16.zip ZIP file
N32205-14-R-3004_Work_Items.zip ZIP file
J_ATTACHMENTS_N32205-14-R-3004.zip ZIP file
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Redacted.pdf PDF
N32205-14-R-3004.doc DOC document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard Work Items included for this solicitation:

SECTION 000

GENERAL REQUIREMENTS

NOT SEPERATELY PRICED (NSP) REQUIREMENTS

INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS

TECHNICAL AND MANUFACTURER’S REPRESENTATIVES

APPROACH, BERTH, AND MOORING REQUIREMENTS

TESTING AND QUALITY ASSURANCE

ELECTRICAL SAFETY PROCEDURE REQUIREMENTS

HEAVY WEATHER PLAN

COLD WEATHER PLAN

CATEGORY “A” WORK ITEMS

FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)

FURNISH GENERAL SERVICES

TELEPHONE SERVICES

PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS

PREPARATION OF WEIGHT AND MOMENT REPORT

INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS

FIRE PROTECTION AND SHIP’S SAFETY PROGRAM

HANDLING SHIP’S STORES

DELIVERY AND REDELIVERY OF THE VESSEL

SHIPBOARD ACCESS AND SECURITY

GAS FREE CERTIFICATES

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES

DOCK TRIALS AND SEA TRIAL

HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY

SECURITY AT PRIVATE CONTRACTORS FACILITY

SECTION 100

HULL STRUCTURE

CATEGORY “A” WORK ITEMS

T-ALT

ROLLER CHOCK REPLACEMENT

136M

HV LOAD CENTER 9-12 SECURITY CAGES

190M

ELEVATOR NO. 1 AND 3 PIT COATING

N/A

HAZMAT CONTAINER RIGGING

N/A

SECTION 200

MACHINERY, PROPULSION

CATEGORY “A” WORK ITEMS

T-ALT

MDE NO.1 & 4 6K HR MAINTENANCE/OVERHAUL TECH REP

N/A

SECTION 300

ELECTRICAL

CATEGORY “A” WORK ITEMS

T-ALT

PROPULSION MOTOR CLEANING

N/A

HV-SS-EMER SWITCHBOARD CLEANING AND MAINTENANCE

N/A

SECTION 400

COMMUNICATION AND NAVIGATIONAL AIDS

CATEGORY “A” WORK ITEMS

T-ALT

SPERRY BRIDGE EQUIPMENT MAINTENANCE

N/A

SECTION 500

MACHINERY, AUXILIARY SYSTEMS

CATEGORY “A” WORK ITEMS

T-ALT

SALT WATER VALVE REPLACEMENT (SW-V-41)

N/A

MSD DISCHARGE PUMP

191M

AFFF PIPING REPAIRS

279U

DISTILLING PLANT DUMP MOD TO SEA CHEST

CARGO BRINE SYSTEM VALVE AND PIPING MOD

FIREMAIN ISOLATION VALVES INSTALL

N/A

CENTRAL SEAWATER SYSTEM SPOOL REPAIRS

238M

LTFW ENDPLATE INSTALLATION

014M

BOWTHRUSTER LUBE OIL PIPING MODIFICATION

291M

REVERSE OSMOSIS DESALINATOR SYSTEM INSTALLATION

351M

FIREMAIN OVERBOARD PIPING RENEWAL

N/A

BRINE AND DEFROST PUMP AND MOTOR OVERHAULS

HP AIR UNION REPLACEMENT

N/A

W2 ANCHOR WINDLASS SHAFT BUSHING REPLACEMENT

SECTION 600

OUTFIT, FURNISHINGS and HABITABILITY

T-ALT

CARGO HOLD 3 INSULATION SUPPORT

N/A

GALLEY EQUIPMENT CALIBRATION

STATEROOM HEAD DECKING RENEWAL

SECTION 800

HEATING, VENTILATION and AIR CONDITIONING

CATEGORY “A” WORK ITEMS

T-ALT

801 GALLEY EXHAUST DUCT CLEANING

N/A

802 LAUNDRY EXHAUST DUCT CLEANING

N/A 805 CARGO AND CHILLER VSD INSTALLATION SUPPORT (iHVAC & R) 319M HVAC VSD INSTALLATION SUPPORT (iHVAC & R) N/A

SECTION 900 DRY DOCKING

CATEGORY “A” WORK ITEMS

T-ALT

DRY DOCKING/ UNDOCKING VESSEL

N/A

PROPELLER SHAFT AND STERN TUBE INSPECTION Rev 1

STERN TUBE SEAL INSPECTION

POLISH BOWTHRUSTER PROPELLER-INSPECT SEALS

HEAVY ANCHOR UPGRADE

CENTRAL SEAWATER 30 INCH WASTER PIECE MOD

290M

PROPELLER SHAFT HORIZONTAL PROXIMITY PROBE INSTALLATION

321U

STERN TUBE REFERENCE CELL INSTALLATION

321U

909 UNDERWATER HULL CLEANING AND PAINTING

RENEW SEACHEST, ROPE GUARD AND BOWTHRUSTER ZINCS

INSPECT AND REPAIR CATHODIC PROTECTION

STERN TUBE BELZONA REPAIR

FIREMAIN OVERBOARD WASTER RENEWAL

SECTION 1000

UNREP GEAR

T-ALT

1001 RENEW FLIGHT DECK NON-SKID

1002 UNREP RELIEF VALVE TESTING

N/A

1003 SLIDING BLOCK RUBBER BUMPER REPLACEMENT

CATEGORY “B” WORK ITEMS

SECURITY AT PRIVATE CONTRACTORS FACILITY IN FORCE PROTECTION B-D

CONTINUATION OF SERVICES

(End of Summary of Changes)

File details come from the government source that posted it. Updated .