0021_A__AMENDMENT_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012.doc

DOC document 141 KB Posted

Attached to
USNS MEDGAR EVERS (T-AKE 13) REGULAR OVERHAUL/DRYDOCKING (ROH/DD)
Solicitation number
N32205-14-R-3004
Issued by

About this file

Revised Work Item 021

View the file

Other files

File Type Posted
14-R-3004_Amend_0006.doc DOC document
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Amend_00005.doc DOC document
N322205-14-R-3004_Amend_0005.doc DOC document
0302_A_HV-SS-EMERGENCY_SWITCHBOARD_CLEANING_Rev_1.doc DOC document
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Amend_0001_Redacted.pdf PDF
N32205-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_WORK_ITEM_INDEX_REV_2.doc DOC document
J-2_Category_A_Items_Rev_2.xls XLS spreadsheet
N32205-14-R-3004_0004.doc DOC document
1003_A_SLIDING_BLOCK_RUBBER_BUMPER_REPLACEMENT.doc DOC document
J-3_Category_B_Items_Rev_2.xlsx XLSX spreadsheet
J-2_Category_A_Items_Rev_1.xls XLS spreadsheet
0519_A_ANCHOR_WINDLASS_SHAFT_BUSHING_REPLACEMENT.doc DOC document
N32205-14-R-3004_0003.doc DOC document
N32205-14-R-3004_0002.doc DOC document
Q_AND_A_No._3.docx DOCX document
J_-_3_Category_B_Items_Rev_1.xlsx XLSX spreadsheet
INDEX_-DRYDOCK_USNS_MEDGAR_-Aug__2014_Rev_1.doc DOC document
0902_A__PROPELLER_SHAFT_AND_STERN_TUBE_INSPECTION_Rev_1.doc DOC document
N32205-14-R-3004_0001.doc DOC document
Q_AND_A_No._2.docx DOCX document
Q_AND_A_No._1.docx DOCX document
N32205-14-R-3004_Work_Items_1-16.zip ZIP file
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Redacted.pdf PDF
N32205-14-R-3004.doc DOC document
J_ATTACHMENTS_N32205-14-R-3004.zip ZIP file
N32205-14-R-3004_Work_Items.zip ZIP file
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS MEDGAR EVERS

(T-AKE 13)

GENERAL REQUIREMENTS N32205-14-R-3004

3 June 2014 ITEM 021 Category “A” MSC/PM1CM2/REV OCT 12

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACE (AMENDMENT)

1.0 ABSTRACT:

1.1 This work item describes the requirement to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.

2.0 REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 NAVSEA DWG 801-8499127 Rev-, Capacity Plan USNS MEDGAR EVERS

2.1.2 NAVSEA 801-8499168 Rev-, USNS MEDGAR EVERS Trim and Stability Booklet

2.2 Enclosures:

2.2.1 USNS MEDGAR EVERS (T-AKE 13) List of Applicable Tanks, Voids and Cofferdams

3.0 ITEM LOCATION / DESCRIPTION: See Enclosure 2.2.1.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL: None.

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

5.3 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under work item 023 of this work package.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.

7.0 STATEMENT OF WORK REQUIRED:

7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a Naval Architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least 2 business days prior to starting this work to permit review and approval by MSC Naval Architect.

7.2 Contractor and Ships Force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility. Chief Engineer shall review and endorse all soundings taken/recorded. Submit copy of endorsed record to the MSCREP.

7.3 Provide a clean storage facility with a capacity of approximately 0 tons (0 gal) of fuel oil, 0 tons (0 gal) of JP-5 and 0 tons (0 gal) of lube oil. Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil. Prior to off loading of liquids, samples shall be taken by the contractor of each of the tanks to be moved to temporary storage. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately. Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.

7.3.1 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.

7.4 Removals: The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities. In the event that the tank contents are being moved off the ship, the contractor shall provide support to the vessel, including all hoses and manpower on the shore side to accomplish this removal. Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1. Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated in the enclosure. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations. In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste. When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Item 0023 shall be used for the identification, handling and disposal. The costs for removal are still part of this (WI 021) work item..All other costs for offload and disposal shall be captured in this work item.

7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.6 Accomplish the following for each tank/space annotated by an “X” in enclosure 2.2.1:

7.6.1 Open manholes and erect/maintain safety guards over openings.

7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers. Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.

7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.

7.6.4 Temporarily provide and erect staging, as required, to support the requirements of this work item, and to allow structural tank inspections by the attending ABS Surveyor, and final close out inspections by the MSCREP.

7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained “Safe for Men/ Safe for Hot Work”. The provision of gas free certificates is covered under work item 020 of this work package.

7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.

7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.

7.7.3 Post Original Gas Free Certification at each Tank/Space Location. Certificate shall be mounted directly at the tank/space manhole entrance.

7.7.4 Post copy of Gas Free Certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.

7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.

7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank / space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.

7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense. Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.

7.9.2 Ensure all blowers, lighting, staging, tools, and miscellaneous equipment are removed prior to the final inspection. Any staging necessary for MSCREP close out inspection shall be removed just prior to final acceptance close out of tank/space.

7.9.3 Present Tank in “Final” clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).

7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a Condition Found Report for any missing or damaged fasteners or hardware.

7.11 The following tanks and spaces, included in enclosure 2.2.1, shall be opened, cleaned and prepared for gas free certification within 7 days of the shipyard availability start:

Engine Room 5-66-0

Shaft Alley 5-79-0

AMR 5-58-08

Motor Rm 5-75-0

Stern Tube Void 6-83-1

Elevator Pit #1 5-40-0

Elevator Pit #3 5-49-0

Fuel Oil Storage 6-34-1

Fuel Oil Storage 6-34-2 Fuel Oil Storage 6-40-1

Fuel Oil Storage 6-40-2

Fuel Oil Storage 6-49-01 LO Settling 3-73-5-2

Cofferdam 6-45-01

MSD & CHT Tanks

7.12 Required Deliverable Report:Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:

A.
Tank / Space Name
B.
Tank/Space Location Designation
C.
Date Tank/Space Opened
D.
Date Gas Free Cleaning Started
E.
Date Gas Free Cleaning Completed
F.
Date Gas Free Cert. Received
G.
Date ABS Initial Structural Survey Complete
H.
Date Air Test / Hydro Test Completed
I.
Date Final Tank/Space Cleaning Started
J.
Date Final Tank/Space Cleaning Completed
K.
Date Tank/Space Final Close
L.
Tank/Space Related Repair Status: List major job sequence within a tank/space followed by date start & date completed (such as below):

* Access Cuts -> Date Removed / Date Installed

* Blasting -> date start / date complete

* Painting -> date start / date complete

* Related work items internal repairs (pipe, valve, structure, etc)

* Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)

* Fluids added / removed from tank/space (pot water chlorination; Undocking Stability; fuels/oils; etc.)

M.
Other

7.13 Paint all disturbed surfaces to match surroundings.

7.14 Preparation of Drawings: None.

7.15 Manufacturer's Rep: None.

8.0 GENERAL REQUIREMENTS: None

ENCLOSURE 2.2.1 – USNS MEDGAR EVERS

(T-AKE 13)

TANKS, VOIDS, AND COFFERDAMS

NOTE: Tank Arrival Conditions are estimates only.

Description
Tank Location
95% Capacity

(gals) Area

(ft2) Arrival

Condition

(Ltons)

Safe for Men
Safe for Hot Work
Cargo Fuel 1C
4-24-0
302,265
Cargo Fuel 2C
4-30-0
337,084
Cargo Fuel 3S
4-34-1
185,185
Cargo Fuel 3C
4-34-0
93,728
Cargo Fuel 3P
4-34-2
185,185
Fuel Oil Storage
6-34-1
57,921
726
X
X
Fuel Oil Storage
6-34-2
57,072
715
X
X
Fuel Oil Storage
6-40-1
87,880
1,322
X
X
Fuel Oil Storage
6-40-2
87,880
1,322
X
X
Fuel Oil Storage
6-49-1
90,784
Fuel Oil Storage
6-49-01
66,094
33
X
X
Fuel Oil Storage
6-49-2
90,784
Fuel Oil Storage
6-58-1
62,977
Fuel Oil Storage
6-58-0
52,741
Fuel Oil Storage
6-58-2
62,859
Fuel Oil Storage
6-62-1
70,194
Fuel Oil Storage
6-62-01
50,254
Fuel Oil Storage
6-62-4
70,191
Fuel Oil Storage
6-66-1
40,946
Fuel Oil Storage
6-66-2
37,838
Fuel Oil Storage
6-72-0
33,192
Fuel Oil Storage
3-79-3
46,872
Fuel Oil Storage
3-75-3
75,289
Fuel Oil Storage
3-81.5-2
70,270
Fuel Oil Overflow Tank
3-82-1
61,556
Fuel Oil Settling Tank
4-79-6
56,268

1,270

LO Storage Tank
3-82.5-1
63,401

685 gals

LO Storage Tank
3-73.5-2
25M3

20M3

Machinery Oily Waste Tank
5-71-1
5,019

3300 gals

Cargo Hold Oily Waste Tank
6-62-2
2,641

970 gals

Fuel Oil Leakage Collection Tank
6-68.5-0
530

220 gals

Aviation Fuel Storage Tank
3-82.5-2
34,263

700 gals

Aviation Fuel Service Tank
3-84-2
5,891

125 gals

Aviation Overflow and Drain Tank
4-79-2
46,679

100 gals

Void
4-79-4
N/A

N/A

Cargo Pump Room
5-34-0
N/A

N/A

Main Machinery Space Bilges
5-66-0
N/A
N/A
X
X
Aux Machinery Space Bilges
5-58-0
N/A
N/A
X
X
Shaft Alley
5-79-0
N/A
N/A
X
X
Void
6-83-0
N/A
N/A
X
X
JP-5 Pump Room Bilges
3-82.5-4
N/A

N/A

Cofferdam 6-45-01
6-45-01
N/A
N/A
X
X
Void
4-79-3
N/A

N/A

Cargo Slop Tank
4-38.5-0
37,491

10,000 gals

Ballast Tank
4-83-2
46,499

1,000 gals

Ballast Tank
4-83-1
46,499

1,000 gals

Ballast Tank
6-54-01
51,453

1,000 gals

MSD & CHT
3-75-6
400 ft3
300 ft3
X
X
Cargo Potable Water
3-80.5-2
25,224

500 gals

Cargo Potable Water
3-79-2
25,224

500 gals

Distilled Water
3-79-0
29,868

500 gals

Ship Potable Water
3-79-1
25,224

15,000 gals

Ship Potable Water
3-80.5-1
25,224

15,000 gals

Food Waste Tank
3-77-2

2,114 gals

Grey Water Tank
3-77-4

25,627 gals

021-1

File details come from the government source that posted it. Updated .