0519_A_ANCHOR_WINDLASS_SHAFT_BUSHING_REPLACEMENT.doc

DOC document 70 KB Posted

Attached to
USNS MEDGAR EVERS (T-AKE 13) REGULAR OVERHAUL/DRYDOCKING (ROH/DD) Federal contract opportunity
Solicitation number
N32205-14-R-3004
Issued by
Department of the Navy Military Sealift Command

About this file

WI 519

View the file

Other files for this federal contract opportunity

Other files attached to USNS MEDGAR EVERS (T-AKE 13) REGULAR OVERHAUL/DRYDOCKING (ROH/DD), newest first.
File Type Posted
0021_A__AMENDMENT_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012.doc DOC document
14-R-3004_Amend_0006.doc DOC document
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Amend_00005.doc DOC document
N322205-14-R-3004_Amend_0005.doc DOC document
0302_A_HV-SS-EMERGENCY_SWITCHBOARD_CLEANING_Rev_1.doc DOC document
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Amend_0001_Redacted.pdf PDF
J-2_Category_A_Items_Rev_2.xls XLS spreadsheet
1003_A_SLIDING_BLOCK_RUBBER_BUMPER_REPLACEMENT.doc DOC document
N32205-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_WORK_ITEM_INDEX_REV_2.doc DOC document
N32205-14-R-3004_0004.doc DOC document
J-2_Category_A_Items_Rev_1.xls XLS spreadsheet
J-3_Category_B_Items_Rev_2.xlsx XLSX spreadsheet
N32205-14-R-3004_0003.doc DOC document
N32205-14-R-3004_0002.doc DOC document
Q_AND_A_No._3.docx DOCX document
J_-_3_Category_B_Items_Rev_1.xlsx XLSX spreadsheet
INDEX_-DRYDOCK_USNS_MEDGAR_-Aug__2014_Rev_1.doc DOC document
0902_A__PROPELLER_SHAFT_AND_STERN_TUBE_INSPECTION_Rev_1.doc DOC document
N32205-14-R-3004_0001.doc DOC document
Q_AND_A_No._2.docx DOCX document
Q_AND_A_No._1.docx DOCX document
N32205-14-R-3004_Work_Items_1-16.zip ZIP file
N32205-14-R-3004.doc DOC document
N32205-14-R-3004_Work_Items.zip ZIP file
J_ATTACHMENTS_N32205-14-R-3004.zip ZIP file
JA_N104-14-R-3004_USNS_MEDGAR_EVERS_ROHDD_Redacted.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS MEDGAR EVERS

(T-AKE 13)

MACHINERY, AUXILIARY SYSTEMS
N32205-14-R-3004

16 April 2014

ITEM NO. 519
Category "A"
MSC/Van Vleck/BVV

W2 Anchor windlass shaft bushing replacement

1.0 ABSTRACT:

1.1 This item describes providing support to remove the W2 anchor/mooring combination winch shaft and replacing the shaft bushing.

2.0 REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 T/M TG813-BV-MMC-010, Electrically Driven Deck Equipment

2.1.2 Drawing 03-138.007/0A, Drum Shaft Assembly

2.2 Enclosures:

2.2.1 None

3.0 ITEM LOCATION AND DESCRIPTION:

3.1 Locations/Quantity

3.1.1 Location:

-PORT, Bow 1-10-0

3.1.2 Quantity: 1 ea. combination anchor/mooring winch

3.1.3 Quantities given in the List of Materials are considered estimates. The Contractor shall provide these quantities and reasonable additional material in order to install a fully functional system that meets the requirements of this specification.

3.1.4 Bill of Materials, Contractor Furnished:

3.1.4.1 1 ea., drum shaft bushing, P/N:03-126121/0

3.1.5 Additional material/components necessary to accomplish work required by this work item, such as hangers, weld material, etc. are not included below, and shall be provided by the Contractor.

3.2 Item Description/Manufacturer’s Data:

3.2.1 Kocks Bremen Anchor-Mooring Windlass, Model 03-136.184/0

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES: None

5.0 NOTES:

5.1 The contractor and subcontractors must consult Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements.

5.2 The contractor and subcontractors shall review other work items under this contract, to determine their effect on the work required by this item. Based on this review the contractor shall plan and schedule work to minimize conflicts between work items.

5.3 This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area with out proper authorization.

5.4 THE USNS MEDGAR EVERS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.

5.5 The definitions of many terms used in this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide the services of a Kocks Bremen OEM representative to assist in the replacement of the shaft bushing, and oversight of work described in this specification.

7.1.1 Technical representative to provide new drum shaft bushing listed in Para 3.1.4

7.1.2 Shipyard to provide all rigging and crane services to temporarily move anchor windlass/reduction gear/mooring drum assembly shaft to access wildcat shaft bushing for repair.

7.1.3 Shipyard to remove and reinstall anchor chain to provide access for rigging. Anchor chain may be rigged up out of the way in lieu of removal if possible.

7.2 Removals:

7.2.1 Assist ship’s force with locking out and electrically tagging out W2 windlass.

7.2.2 Shipyard to unbolt mooring winch and reduction gear foundation bolts.

7.2.3 Remove gypsy winch drum. Drum weighs approximately 800 lbs. Use Ref 2.2 as guidance.

7.2.4 Remove wildcat pillow blocks.

7.2.5 Rig entire mooring winch drum, reduction gear, e-motor, and drum shaft pinion assembly off the vessel. Assembly weighs approximately 8000 lbs.

7.2.6 Remove existing shaft bushing (1) and wildcat pinion gear.

7.3 Clean and polish the shaft where the existing shaft bushing was installed.

7.4 Clean ID of wildcat pinion.

7.5 Machine and match the new shaft bushing OD to the pinion ID and recommended tolerance, per manufacturer’s and OEM’s guidance.

7.6 Installations:

7.6.1 Install new shaft bushing (CFM) under the guidance of the OEM representative.

7.6.2 Rig entire assembly back onto the vessel. Install under guidance of OEM.

7.6.3 Fasten mooring winch, e-motor, and reduction gear foundations.

7.6.4 Reinstall gypsy head on the drum shaft.

7.7 Electrical:

7.7.1 Electrically disconnect and reconnect mooring winch motor. This is required to rig windlass assemble.

7.8 Preparation of Drawings/Documents: None

7.9 Testing/Inspection:

7.9.1 Shipboard Testing: Perform operational in accordance with tech rep recommendations. Tech rep shall witness testing.

7.10 Painting/Insulation:

7.10.1 Clean and prepare the disturbed areas and apply a primer and two topcoats of paint to all areas disturbed to match the surrounding areas.

7.11 Markings

7.12 Manufacturer's Representative:

7.12.1 TTS Marine – USA

Nicole Watson - Service Coordinator/Sales nicole.watson@tts-se.us

TTS Marine Inc.

Fort Lauderdale, Florida ph: (954) 493-6405 fax: (954) 493-6409

8.0 GENERAL REQUIREMENTS: None additional.