Question and Answers for Propeller Aircraft Services RFP N0042124R0001.pdf

PDF 102 KB Posted

Attached to
Contracted Air Services (CAS) Propeller Aircraft Services
Solicitation number
N0042124R0001
Issued by

View the file

Other files

File Type Posted
Amendment 0002_Question and Answers for Propeller Aircraft Services RFP N0042124R0001.pdf PDF
PWS 2.0_dd_FAA AC_91-91.pdf PDF
PWS 3.4.1_g_DCMA-INST-8210-1C-C1.pdf PDF
PWS 2.0_jj_MIL-HDBK-516C.pdf PDF
PWS 2.0_oo_OPNAVINST 3432.1A.pdf PDF
L-7 Vol 3 P-2 Business Systems.xlsx XLSX spreadsheet
PWS 3.4.1_k_FAA AC_91-91.pdf PDF
PWS 2.0_c_AIC Link Circulars.pdf PDF
PWS 2.0_j_CFR Title 14 Part 61.pdf PDF
PWS 2.0_x_DoDM 4140.25.pdf PDF
PWS 2.0_cc_FAA AC_91-70B_CHG_1.pdf PDF
PWS 2.0_t_DoDD 5500.07 Chg 7 JER.pdf PDF
PWS 2.0_gg_ICAO Annex 1-18.pdf PDF
L-6 Vol 3 P-1 Offeror Summary.pdf PDF
PWS 2.0_bb_FAA AC_43-210A_CHG_1.pdf PDF
PWS 2.0_n_CFR Title 49 Link.pdf PDF
PWS 3.4.1_f_AIC Link Circulars.pdf PDF
L-2 Vol 1 T-2 Aircraft Performance.pdf PDF
Att 4_GFP N0042124R0001 11.18.22.pdf PDF
PWS 2.0_ff_HSPD-12.pdf PDF
PWS 2.0_u_DoDD 8140.01.pdf PDF
PWS 3.4.1_m_ICAO Annex 19.pdf PDF
PWS 3.4.1_n_AIP Pub Link.pdf PDF
Exhibit A CDRLs 12.1.22.pdf PDF
PWS 2.0_a_18 USC Part 793.pdf PDF
RFP N00421-24-R-0001.pdf PDF
L-3 Vol 2 CPAQ.pdf PDF
PWS 3.4.1_h_FAA Order_8300.16A_CHG_1.pdf PDF
PWS 2.0_nn_NAVSUP Instruction 4200.97A.pdf PDF
PWS 2.0_k_CFR Title 14 Part 91.pdf PDF
L-4 Vol 2 Past Perf Info Form.pdf PDF
PWS 2.0_q_DCMA-INST-8210-1C-C1.pdf PDF
PWS 2.0_z_DoDM 8570.01.pdf PDF
PWS 3.4.1_j_AC_91-70B_CHG_1.pdf PDF
PWS 3.4.1_b_CFR Title 14 Part 43.pdf PDF
PWS 2.0_d_afi10-1001.pdf PDF
PWS 2.0_ee_FAA Order_8300.16A_CHG_1.pdf PDF
PWS 3.4.1_d_CFR Title 14 Part 121.1111 EWIS Maint Program.pdf PDF
PWS 2.0_mm_NAVAIRINST 13034.1G.pdf PDF
Att 1_PROPS PWS 12.6.22.pdf PDF
L-8 Vol 3 Pricing Sheet 12.6.22.xlsx XLSX spreadsheet
PWS 2.0_v_DoDI 4500.53.pdf PDF
PWS 2.0_g_CFR Title 14 Link.pdf PDF
PWS 2.0_h_CFR Title 14 Subpart H.pdf PDF
PWS 3.4.1_e_49 USC Qualifications for Public Status.pdf PDF
Att 3_QASP_PROPS 11.7.22.pdf PDF
PWS 2.0_pp_SECNAV INST 5510.30C.pdf PDF
PWS 2.0_y_DoDM 5220.22-M.pdf PDF
PWS 2.0_r_DCMA-MAN_8210-2_C1_29 May 2020.pdf PDF
Att 5_Airworthiness Checklist.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0042124R0001

Propeller Aircraft Services

Questions and Answers

January 2023

# Questions Answers

1 What is the contract number for the current contract? The contact number is N00421‐19‐D‐0030.

Ref. PWS Table 3.1.1, speed/altitude is specified as: (1) Capable of sustaining not less than 170

KTAS at all elevations between 200 and 10,000 feet Mean Sea Level (MSL) (Note 1); (2) Maximum structural cruising speed (VNO) not less than 170 Knots Indicated Air Speed (KIAS). ). If VNO unavailable, maximum operating limit speed (VMO) of not less than 170 KIAS. What is the driving factor on the requirement for a UAV/UAS/RPA to fly this fast at 200ft mean sea level

The driving factor on the requirement to fly at these speeds is to support a

UAS escort between the base location and the operating area. Attachment

(1) Performance Work Statement (PWS) section 3.2.1 provides the Typical

Profiles to be flown in support of this contract. Paragraph c is for a UAS

Escort.

Ref. PWS Table 3.1.1, turn performance is specified as “Minimum of 2G turns, sustained, below

14,000 feet MSL.” Was this meant to say Maximum?

No, the Turn Performance within attachment (1) Performance Work

Statement (PWS) table 3.1.1 was not meant to say Maximum of 2G turns, sustained, below 14,000 feet MSL. Minimum turn performance is required.

Your proposed solution needs to meet this minimum performance requirement.

Ref. PWS Table 3.1.1, Configuration / Special Equipment “2 x High Frequency (HF) antennas.” Can another BLOS communication system substitute, or is there a specific HF solution with the equipment?

Attachment (1) Performance Work Statement (PWS) Table 3.1.1 requirement for (2) High Frequency (HF) antennas is the requirement. One antenna will be used with the HF Transceiver. The second HF antenna is a provisioning requirement for the Secure Communications Relay System.

Ref. RFP section 2.1.4., and PWS para 3.1, will any of the specified aircraft modifications require us to place our aircraft into experimental status?

It is not anticipated that an aircraft needs to be registered as an experimental aircraft. Attachment (1) Performance Work Statement (PWS) Table 3.1.1

Configuration/Special Equipment requirements is not anticipated to require an experimental aircraft.

Dependent on your proposed aircraft solution, the Configuration/Special

Equipment may require the aircraft to be registered as experimental.

Ref. RFP section 2.1.5, the section specifies the use of Microsoft Project to create the Integrated

Master Schedule (CDRL A007). Will you accept any other format?

No, we will not accept an alternate format other than Microsoft Project.

See RFP Section L, Part B, 1.0 Volume 1, Section 2.1.5. "Integrated Master

Schedule (IMS) to achieve Capability Stand Up per PWS Section 3.3: The

Offeror shall submit a proposed master schedule using Microsoft Project .mpp format for completion of all stand up requirements, including the date that they will be able to provide full performance of services under CLINs 0002 through 0004 including availability of all aircraft for tasking."

Ref. RFP section 2.1.6., is there a CDRL # for the Ground and Flight Operating Procedures

(GOPS/FOPS)?

Yes, there is a CDRL number for the Ground and Flight Operating Procedures

(GOPS/FOPS). The CDRL number is A001 Airworthiness and Related

Substantiation Data.

See Attachment (1) Performance Work Statement (PWS) section 3.3.3 "If any operations are determined to be PAO by PMA‐226" and 3.3.3.2 "The

Contractor shall develop and submit to the GFR Training and Safety programs as well as Ground Operating Procedures (GOPs) and Flight Operating

Procedures (FOPs) IAW Exhibit A, CDRL A001, and receive GFR approval for these documents."

Ref RFP 2.3.1, 2.3.2, 2.3.5, will you accept a current and active Civil Aircraft Operations (CAO)

Verification Letter from ACC AMIC to satisfy the NAVAIR IFC/MFR/AWR requirement?

No, the Government will not accept a current and active Civil Aircraft

Operations (CAO) Verification Letter from ACC AMIC to satisfy the RFP Section

L, Part B, 1.0 Volume 1, Sections 2.3.1, 2.3.2 and 2.3.5.

Reference 2.3.1, "This requirement can be satisfied by submitting an active

(as of the date specified in Block 9 of the SF 33 of the RFP) NAVAIR IFC, United

States Air Force (USAF) Military Flight Release (MFR), or United States Army

Airworthiness Release (AWR), if the aircraft can satisfy the requirements of this solicitation within the limits of the submitted IFC, MFR, or AWR."

Reference 2.3.2, "This requirement can be satisfied by submitting an active

(as of the date specified in Block 9 of the SF 33 of the RFP) NAVAIR IFC, USAF

MFR, or United States Army AWR, if the aircraft can satisfy the requirements of this solicitation within the limits of the submitted IFC, MFR, or AWR."

Reference 2.3.5, "This requirement can be satisfied by submitting an active

(as of the date specified in Block 9 of the SF 33 of the RFP) NAVAIR IFC, USAF

MFR, or US Army AWR, if the aircraft can satisfy the requirements of this solicitation within the limits of the submitted IFC, MFR, or AWR."

Ref RFP 2.3.4. This section specifies only a NAVAIR IFC. Does a current/active MFR or AWR also satisfy this requirement?

No, the Government will not accept a current/active MFR or AWR to satisfy the requirement identified in RFP Section L, Part B, 1.0 Volume 1, Section

2.3.4.

Reference 2.3.4, If submitted with the proposal, an active (as of the date specified in Block 9 of the SF 33 of the RFP) NAVAIR IFC satisfies this requirement.

File details come from the government source that posted it. Updated .