Quality Assurance Surveillance Plan (QASP) for
Propeller Aircraft Services
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a government developed and applied document used to ensure the systematic quality assurance methods are used in the administration of the performance based service tasks under the planned contract. The intent is to ensure that the contractor performs In Accordance With (IAW) the performance metrics, the government receives the quality of services required under the contract, and that the actual performance results are documented IAW this plan.
This QASP describes how the government will observe, evaluate and document the contractor’s performance in meeting the critical performance standards identified in the contract and task orders. Specifically, the QASP will identify the government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. The intent is to establish and properly execute a QASP that will assist the government in obtaining services from the contractor.
2. Authority
Authority for issuance of this QASP is provided under contract Section E – Inspection and
Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP. The contractor, and not the government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The QASP, on the other hand, is put in place to provide government surveillance oversight of the contractor’s efforts to assure that they are timely, effective, and are delivering the results specified in the order.
4. Government Resources
The following definitions for government resources are applicable to this plan:
Contracting Officer – A person duly appointed with the authority to enter into (Procuring
Contracting Officer) (PCO) or administer (Administrative Contracting Officer) (ACO) contracts and make related determination and findings on behalf of the government. The PCO for this contract is A252600. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Alternative Contracting Officer Representative (ACOR) – An individual appointed in writing by the PCO to act as its authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Flight Representative (GFR) – A United States (US) Military Officer or similarly qualified civilian with the responsibility for oversight of public aircraft operations conducted by commercial contractors.
Program Manager (PM) – As part of PMA 226, the PM manages and supports specialized and proven aircraft platforms & systems to include CAS acquisition, PAO Declaration and
Airworthiness.
CAS Integrated Product Team Lead (IPTL) - The IPTL executes the program as the PM’s primary representative.
5. Responsibilities
The following government resources shall have responsibility for the implementation of this
QASP:
Contracting Officer – The Contracting Officer shall monitor performance of all necessary actions for effective contracting, ensure compliance with the terms of the contract, and safeguard the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair, and equitable treatment under the contract. The
Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
COR/ACOR – The COR/ACOR is responsible for technical administration of the contract and assures proper government surveillance of the contractor’s performance. In addition to the continuous monitoring of performance, the COR/ACOR will also submit an annual assessment in the Navy’s Contractor Performance Assessment Reporting System (CPARS). In CPARS, the
COR/ACOR assesses general quality of the services, schedule, management, and other important areas. The COR/ACOR is not empowered to make any contractual commitments or to authorize any changes on the government’s behalf. Any changes that the contractor deems may affect contract price and terms or conditions shall be referred to the Contracting Officer for action.
GFR – The GFR is responsible for surveillance of contractor ground operations involving CAS aircraft. GFR duties and responsibilities are described in DCMA INST 8210.1C, Chapter 7
(NAVAIRINST 3710.1G).
PM – The PM provides primary program oversight, nominates the COR, and supports the COR’s performance assessment activities. The PM for this contract is PMA-226.
CAS IPTL - The IPTL executes the program as the PM’s primary representative, which includes designating the Scheduling Officers to execute administrative tasks such as mission scheduling, coordination, prioritization of CAS and invoice inspection.
6. Methods of Quality Assurance Surveillance
a. Contractor Performance Assessment Report System (CPARS) – The market place for
Contracted Air Services is becoming very competitive. As such, the successful offeror has a vested interest in the government generated CPARS rating under this contract.
Additionally, an evaluation using the CPARS format will be performed annually inclusive of all task orders awarded during the applicable annual rating period. This evaluation will be one determinant in the continuation of issuing task orders under this contract. The government will address the quality of the services, schedule, management, and other important areas for this procurement. As this information may affect future source selections throughout DoD, and the continuation of the contract, the CPARS evaluation will be used appropriately as an additional performance oversight and communication tool with the QASP.
b. QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity
Checklist (SAC) provided as Enclosure (4) herein.
7. Surveillance
Enclosures (1), (2), and (3) set forth the CAS performance standards, data performance standards, and incentives for the contractor and the COR. Enclosure (4) provides the checklist and means for the COR to document on a monthly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing monthly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the Surveillance and Performance Module (SPM). The file will contain copies of all reports, evaluations, recommendations, and any actions related to the government’s performance of the quality assurance function, including the originals of the
Quality Assurance Checklists. All such records will be maintained for the life of the contract.
The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a
Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP enclosure (5).
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The government will review the contractor's corrective action plan to determine acceptability.
The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action;
and, whenever an unfavorable trend is detected in contractor performance
9. Enclosures
Enclosure (1) – Contracted Air Service Performance Standards
Enclosure (2) - Data Performance Standards
Enclosure (3) - Incentives
Enclosure (4) - Surveillance Activity Checklist
Enclosure (5) – Contract Discrepancy Report
Enclosure (1)
CONTRACTED AIR SERVICES PERFORMANCE STANDARDS
Performance Work
Statement (PWS) Task
Description
Performance Standards
Required and Tied to CPAR
Ratings
Surveillance Method/Measure Incentives
Provide Propeller Aircraft
Services (flight minutes) which meet requirements within the PWS
Metric 1
Execute complete missions (weight off wheels to weight on wheels) 85.0% of the time to be mission effective.
95.0 – 100.0% = Exceptional
90.0 – 94.99% = Very Good
85.0 – 89.99% = Satisfactory
80.0 – 84.99% = Marginal
<80.0% = Unsatisfactory
100.0% Inspection by COR and customer feedback.
Example:
Mission Effectiveness is the total sorties flown in which the aircraft functions as required by the
PWS and IAW scheduled flights prescribed by
Scheduling Officer (SO) divided into the total sorties scheduled to achieve percentage (e.g. 49 flown/50 scheduled = 98.0%). Excludes canceled sorties by customer or due to weather related occurrences.
See enclosure 3.
Contractor to maintain
Government Furnished Property (GFP) accountability IAW DI-
MGMT-81947B
Metric 2
Contractor shall account for all GFP with a goal of 100.0% accuracy and a Satisfactory metric of 95.0%.
Reports shall be submitted IAW
CDRL A006.
98.0 – 100.0% = Exceptional
97.0 – 97.99% = Very Good
95.0 – 96.99% = Satisfactory
90.0 – 94.99% = Marginal <90.0% = Unsatisfactory
Government performed random on-site physical audits combined with 100.0% inspection by COR of GFP reports submitted per CDRL A006 of contractor assigned GFP against the contract master list of assigned
GFR.
Take total number of GFP items issued from the government to the contractor compared to the
1149 list and complete reports submitted. And/or Take total GFP items accounted for during physical audit and divide by total GFP issued by government to derive percentage (299/300 = 99.7%)
See enclosure 3.
Safety program compliance
Metric 3
Contractor shall maintain compliance with Ground Operating Procedures (GOPs) and Flight Operating
Procedures (FOPs).
Contractor goal is 100.0% compliance with a Satisfactory metric of 94.0%
96.0 – 97.99% = Very Good
94.0 – 95.99% = Satisfactory
90.0 – 94.99% = Marginal <90.0% = Unsatisfactory
100.0% Inspection by GFR.
DCMAINST 8210.1C Change 1 compliance inspection will be conducted by the GFR on a semiannual basis. A score will be derived based on the total number of compliant responses versus the total number of questions in the applicable audit checklist.
See enclosure 3.
Fuel accountability compliance (fuel consumption report)
Metric 4
Contractor shall maintain 95.0% accurate fuel consumption tracking between fuel cards/fuel receipts, flight logs and fuel receipts, with a goal of 100.0% accurate tracking.
97.0 – 97.99% = Very Good
95.0 – 96.99% = Satisfactory
90.0 – 94.99% = Marginal
<90.0% = Unsatisfactory
100.0% Inspection by CAS Fuel Analyst, COR and customer feedback.
Provide evidence that the fuel card charge receipts match with flight log and fuel receipts.
Take total fuel transactions (receipt amounts and gallons dispensed) and compare/match aggregate cost & gallons & fuel log & flight log.
Perform sample audit each month of transaction IAW MIL-STD-105E. Divide the total number of errant fuel transactions by the total number of fuel transactions in the CPAR cycle to derive a percentage.
Capability Stand Up Metric 5
The contractor shall complete a Capability Stand Up period, which consists of all the applicable elements identified in PWS Section 3.3.
Contractor goal is to complete Capability Stand Up no later than the number of months identified in the awarded contract PWS Section 3.3.
Award PWS 3.3 required # of months or earlier from contract award = Satisfactory
Greater than award PWS 3.3 required # of months =
Unsatisfactory
100.0% Inspection by COR.
Compliance checks with PWS 3.3 will be conducted by the COR on a continual basis during the Capability Stand Up period. A rating will be derived based on the total number of months the contractor utilizes to complete the applicable elements of PWS
Section 3.3, Capability Stand Up. A score of Satisfactory will be assigned for completion of
Capability Stand Up that occurs on or before the timeline specified in the PWS. A score of Unsatisfactory will be assigned for completion of Capability Stand Up greater than the time specified in the PWS.
Enclosure (2)
DATA PERFORMANCE STANDARDS
PWS/CDRL Task
Description Standard AQL
Surveillance
Method/
Measure
Incentives
Airworthiness and Related
Substantiation Data (A001)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
100.0% Inspection by
COR and/or ACOR.
See Enclosure 3.
Management Plan (A002) Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Contractor Roster (A003) Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Government Furnished
Material (GFM)
Consumption Report / Fuel Tracking Report and
Receipts (A004)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Contractor’s Progress, Status and Management Report /
Monthly Status Report
(A005)
Submission is IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Government Furnished Property Inventory and
Forecasting Report /
Government Furnished Property (GFP) Inventory
Reporting (A006)
Submission is IAW the DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Integrated Master Schedule
(IMS) (A007)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Airworthiness and Related
Substantiation Data / Contractor’s PAO Flight
Schedule (A008)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Course Conduct Information
Package / Fuel / AIR Card SOU and Training
Certificates (A009)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Briefing Material / Post-
Award Conference Brief
(A00A)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Briefing Material / Program
Management Review Brief
(A00B)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Mishap Risk Assessment
Report / Mishap Response
Plan (A00C)
Submission is IAW the
DID cited in the CDRL.
95.0% acceptable on first submission to government;
100.0% acceptable on 2nd submission to government
Enclosure (3)
INCENTIVES
Assessment Period Acceptable Performance
Definition
How Measured
Incentives
Year 1 All measurement areas rated** "Satisfactory" or above.
Annual assessment period
(12 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment (CPAR), appropriate for the quality of service provided.
(-) Does not meet the acceptable performance definition as a condition for receiving additional task orders.* (-)Receives a negative assessment (CPAR), appropriate for the quality of service provided.
Year 2 All measurement areas rated** "Satisfactory" or above.
Annual assessment period
(24 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment (CPAR), definition as a condition for receiving additional task orders.* (-)Receives a negative assessment (CPAR), appropriate for the quality of service provided.
Year 3 All measurement areas rated** "Satisfactory" or above.
Annual assessment period
(36 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders*
(+) Receives a positive assessment (CPAR), definition as a condition for receiving additional task orders.* (-)Receives a negative assessment (CPAR), Year 4 All measurement areas rated** "Satisfactory" or above.
Annual assessment period
(48 months into contract period) evaluation using the
CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for receiving additional task orders* (+) Receives a positive assessment (CPAR), definition as a condition for receiving additional task orders.*
(-)Receives a negative assessment (CPAR), appropriate for the quality of service provided.
Year 5 All measurement areas rated** "Satisfactory" or above.
Assessment period (60 months into contract period) evaluation using the CPARS format covering the previous 12 months.
(+) Receives a positive assessment (CPAR), (-)Receives a negative assessment (CPAR), appropriate for the quality of service provided.
* The government may not issue additional task orders unless all regulatory requirements are met and the contractor meets at least the “satisfactory” rating levels for the performance metrics identified in this
QASP.
**Evaluation Ratings will be IAW FAR 42.1503.
All PWS/CDRL tasks, including PWS/CDRL sub-tasks, will be assessed focusing on the following:
Quality of the Services – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or affect the schedule variance. Also address significance of scheduled events discuss causes, and assess the effectiveness of contractor corrective actions.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantaged and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
Enclosure (4)
SURVEILLANCE ACTIVITY CHECKLIST
Monthly Surveillance Format Used:
The COR will perform an annual assessment of Quality, Schedule, Management
Responsiveness, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
Description Surveillance
Method/Measure
Date
Planned
Date
Completed
Quality
Metric =
Schedule
Metric =
Cost
Control
Metric =
CPAR
Mgmt.
Metric
= CPAR
Utilization or Small
Business
(yes/no)
Other
Areas
As described above in
Enclosure 1& 2
100% Inspection by COR and customer feedback
TBD
100% Inspection by
COR and customer feedback
TBD
100% Inspection by
COR and customer feedback
TBD
100% Inspection by
COR and customer feedback
TBD
100% Inspection by
COR and customer feedback
TBD
100% Inspection by
COR and customer feedback
TBD
Monthly Summary of Ratings:
Quality of Service Schedule
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Management Other Areas
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the
CPARS evaluation rating definitions listed in Enclosure (3) and the monthly summary of ratings.
Description Surveillance Method/Measure Date Planned Date Completed Summary
Rating/Results
Quality of the Services Review of Monthly Ratings. TBD
Schedule Review of Monthly Ratings. TBD
Management Review of Monthly Ratings TBD
Other Areas Review of Monthly Ratings TBD
Enclosure (5)
Contract Discrepancy Report (CDR)
1. Contract Number:
2. TO: (Contractor Task Manager or on-site representative)
3. FROM: (Name of COR)
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
6. Corrective action plan:
A written corrective action plan (is/is not) required.
The written Corrective Action Plan will be provided to the undersigned not later than 7 days after receipt of this CDR.
Prepared by: COR
Signature – Contracting Officer’s Representative Date
Received by:
Signature - Contractor Representative Date