AAR_Master_PWS_N00421-16-R-0032.docx

DOCX document 134 KB Posted

Attached to
Commercial Air Services (CAS) Aerial Refueling Services Industry Day
Solicitation number
N00421-16-R-0032
Issued by

About this file

This document provides details for a performance work statement for contracted air services aerial refueling services. The Navy seeks to acquire aerial refueling services from contractor-owned and operated tanker aircraft to support fleet operations. Services include strategic tanker operations for pilot training and qualifications, operational test and evaluation support, and extended overwater refueling missions. Tankers must meet specified performance requirements for on-station time, fuel offload capacity, and ability to refuel multiple receivers simultaneously. The Navy will hold an industry day on December 1, 2016 to review the draft performance work statement and address industry questions and concerns. Attendees must RSVP by November 21 and submit security information in advance to attend the event at Marine Corps Air Station Cherry Point.

AAR Master PWS

View the file

Other files

File Type Posted
CDRL-A004_Fuel_Chit.pdf PDF
CDRL-A006_MSR.pdf PDF
N00421-16-R-0032.docx DOCX document
CDRL-A005_in_flight_fuel.pdf PDF
CDRL-A001_Airworthiness.pdf PDF
QASP_AAR.doc DOC document
CDRL-A002_Mgmt.pdf PDF
CDRL-A003_OPSEC.pdf PDF
Question_Form.xlsx XLSX spreadsheet
DD_254_AAR_N00421-16-R-0032.pdf PDF
CDRL-A007_GFP.pdf PDF
N00421-16-R-0032_4_16_18_DRAFT_RFP.pdf PDF
QA_Consolidated_Feb_2018.xlsx XLSX spreadsheet
CDRL-A004_Fuel_Chit.pdf PDF
QASP_AAR.doc DOC document
Section_C_CLIN_Descriptions.docx DOCX document
Section_B_CLIN_Structure.docx DOCX document
N00019-16-R-0032_DD254_signed.pdf PDF
CDRL-A006_MSR.pdf PDF
CDRL-A007_GFP.pdf PDF
Evaluation_Factors.docx DOCX document
Question_Form.xlsx XLSX spreadsheet
CDRL-A002_Mgmt.pdf PDF
CDRL-A003_OPSEC.pdf PDF
CDRL-A005_in_flight_fuel.pdf PDF
CDRL-A001_Airworthiness.pdf PDF
Draft_Instructions.docx DOCX document
Comments_and_Questions_to_PMA.docx DOCX document
Reference_AAR_Q_and_A.docx DOCX document
AAR_N00421-16-R-0032_PWS_.docx DOCX document
FBO_2nd_industry_day.pptx PPTX presentation
Attendee_List_FBO.pdf PDF
Air-to-AirRefuelN00421-16-R-0032_Master_PWS_v3.62.pdf PDF
AARQuestionnarieIndustryDayII.pdf PDF
Air-to-AirRefuel_N00421-16-R-0032_Draft_Evaluation_Criteria_v2.1.pdf PDF
Industry_Day_Qs_and_As.pdf PDF
Industry_Day_Attendees_tanker.pdf PDF
N00019-16-R-0032_BID_DD254_signed.pdf PDF
DRAFT_PBWS_Aerial_Refueling_N00421-16-R-0032_r3FBO.pdf PDF
2016.11.12.CAS_AR_IndustryDayFBOPost.pdf PDF
5000.1A_Enclosue(1)_v2014_11_14.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PMA-226

CONTRACTED AIR SERVICES (CAS)

AIR TO AIR REFUELING (AAR)

N00421-16-R-0032

PERFORMANCE WORK STATEMENT

11 January 2018

Distribution Statement A: Approved for Public Release Distribution Unlimited

PERFORMANCE WORK STATEMENT (PWS)

1.0 SCOPE

The Contracted Air Services (CAS) program provides Contractor Owned Contractor Operated (COCO) aerial refueling aircraft to the Department of the Navy (DoN) Fleet and Test customers for Air-to-Air Refueling (AAR) requirements. Basing operational locations include multiple Continental United States (CONUS) detachment operations sites and foreign and remote operating bases Outside the Continental United States (OCONUS). Other customers for CAS under this contract may include other Department of Defense (DoD) Agencies, United States Navy (USN) supported Foreign Military Sales (FMS), and Government Contractors.

The Contractor shall provide Strategic Tanker “Hose and Drogue” type refueling services for pilot initial qualifications and recurring pilot refresher readiness training.

The Contractor shall provide operational Test and Evaluation (T&E) support to evaluate aircraft new equipment installations and aircraft flight envelope investigation.

Additionally, the Contractor shall provide extended cross country and over water refueling services (“Drags”) for US and FMS aircraft movement as well as OCONUS Fleet Exercise refueling support.

For clarity, all references to the Federal Aviation Regulation in this Performance Work Statement (PWS) will be by reference to Title 14, Code of Federal Regulations (CFR) and abbreviated with the acronym “14 CFR”. All references to the Federal Acquisition Regulation will be abbreviated with the acronym “FAR”. When the requirements of this PWS exceed the minimum requirements of 14 CFR, this PWS takes precedence. Definitions contained in 14 CFR Part 1 apply to all situations and conditions relating to flight operations, aircraft maintenance, and flight crew certifications and qualifications are derived from the 14 CFR and Defense Contract Management Agency (DCMA) Instruction (INST) 8210.1C.

2.0 APPLICABLE DOCUMENTS

The Contractor shall utilize and adhere to the following documents, and updates or revisions to them, in satisfying the performance requirements of this PWS.

(a) Title 14, Code of Federal Regulations

(b) Allied Tactical Publication (ATP)-3.3.4.2

(c) FAA AC 00-1.1A Public Aircraft Operations (PAO)

(d) FAA AC 91-91 Maintaining Public Aircraft

(e) FAA Order 8300.16

(f) DCMA INST 8210.1C Naval Air Systems Command Instruction ((NAVAIRINST) 3710.1G)

(g) DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM)

(h) 32 CFR 766 Use of Department of the Navy Aviation Facilities by Civil Aircraft

(i) AFI 10-1001 Civil Aircraft Landing Permits

(j) AFI 10-1002 Agreement for Civil Aircraft Use of Air Force Airfields

(k) Federal Acquisition Regulation (FAR) Part 31.2 Contracts with Commercial Organizations

(l) CNAF M-3710.7 Series – Naval Air Training and Operating Procedures Standardization (NATOPS) General Flight and Operating Instructions

(m) NAVAIRINST 13034.1F – Flight Clearance Policy for Air Vehicles and Aircraft Systems

(n) DoD 5500.7R Joint Ethics Regulation (JER)

(o) Department of Defense (DoD) Directive 5030.61 DoD Airworthiness Policy

3.0 SPECIFIC REQUIREMENTS

3.1 Aircraft Performance Requirements

The Contractor shall provide aircraft to support two (2) geographically separate simultaneous presentations that meet the following performance criteria (assume Standard Day conditions):

PERFORMANCE REQUIREMENTS

Range and Time on Station
Minimum / Threshold:

5 Hour on-station mission with 150 mile transit and provide 60,000 lbs. off load 4 Hour on-station mission with 150 mile transit and provide 70,000 lbs. off load 3 Hour on-station mission with 150 mile transit and provide 80,000 lbs. off load

Objective:

6 Hour on-station mission with 150 mile transit and provide 80,000 lbs. off load

4.5 Hour on-station mission with 150 mile transit and provide 100,000 lbs. off load 3 Hour on-station mission with 150 mile transit and provide 120,000 lbs. off load

Number of Receivers Refueled Concurrently by a Single AAR Aircraft
Minimum / Threshold:

At least two (2) aircraft capable of refueling one (1) receiver aircraft at a time (centerline refueling system to support V-22 and E-2D)

Objective:

At least two (2) aircraft capable of refueling one (1) receiver aircraft at a time (centerline refueling system to support V-22 and E-2D) and at least one (1) aircraft capable of refueling two (2) receivers simultaneously

Altitude/Airspeed Range
Support tanking from 5,000 to 35,000 feet above Mean Sea Level (MSL)

200 – 300 Knots Indicated Airspeed (KIAS)

Lighting
AAR Lighting will meet ATP-3.3.4.2
Configuration/ Special Equipment:
Approved redundant hose and drogue (hose & basket) refueling system.

Centerline refueling system to support V-22 and E-2D Additional special equipment:

2 Ultra High Frequency (UHF) radios, 1 Very High Frequency (VHF) radio, 1 High Frequency (HF) radio available to the pilots and refuel operator Global Positioning System (GPS) Air/Air Tactical Air Navigation (TACAN) Installed Recording Device to Support Aircraft Aerial Refueling: Video and Audio of receiver aircraft entering and leaving the refueling drogue Traffic Collision Avoidance System (TCAS)

Day and Night
Capable of providing both day and night AAR operations.

The contractor shall only utilize aircraft that possess FAA Airworthiness Certifications, U. S. Navy AAR airworthiness certifications, and North Atlantic Treaty Organization (NATO) refueling ATP-3.3.4.2 approval. The contractor shall comply with all Airworthiness Directives (AD) pertinent to continued flight operations in the National Air Space. All aircraft must be certified to fly in actual and forecast icing conditions. Former military aircraft, regardless of source, must meet their original design standards for this condition.

3.2 Aircraft Certification (AC), Maintenance Practices and Operating Procedures

Contractor owned and operated aerial refueling aircraft utilized for AAR services under this contract shall be certified, maintained and operated In Accordance With (IAW) 14 CFR and their Navy Airworthiness Certification, with particular attention to the following areas:

AC 91-91 – Maintaining Public Aircraft
Part 21 – Certification Procedures for Products and Parts
Part 43 – Maintenance, Preventive Maintenance, Rebuilding and Alteration
Part 91 – General Operating and Flight Rules

3.2.1 FAA Airworthiness Certification

All aircraft used under this contract shall possess an effective FAA Airworthiness Certificate. A copy of the airworthiness certificates shall be available for inspection (Section J, Exhibit A, CDRL A001). All ADs must be complied within the prescribed time frame, and service bulletins must be evaluated for applicable action.

3.2.1.1 FAA Standard Certificates

For aircraft with Standard Certificates, the aircraft shall be maintained in accordance with Parts 21, 43, and 91. The Contractor shall secure FAA approval for each change to the configuration that is not defined in the aircraft’s Airworthiness Certificate before the change is used in support of this contract. For each such modification, whether internal or related to the carriage of external stores, or external mold line, the Contractor shall secure and make available for review, valid FAA-approved data (Section J, Exhibit A, CDRL A001). It is recognized that some modifications relate to powered systems that the FAA will certify for captive carriage only.

3.2.1.2 FAA Special Certificates

For aircraft with Special Certificates, the Contractor must provide the Program Letter submitted to the FAA for application of the airworthiness certificate used in support of this contract or latest Program Letter associated with the current airworthiness certificate. Under this certificate the aircraft shall be maintained in accordance with the Operating Limitations issued as part of that certificate. For each aircraft modification whether internal or related to the carriage of external stores, or external mold line, the Contractor must secure and make available for review, a valid FAA airworthiness certification, and associated Operating Limitations (Section J, Exhibit A, CDRL A001), before the modification is used in support of this contract. Where the modification is a Major Change (defined by 14 CFR 21.93), the Contractor shall also provide the Program Letter and secure the FAA's determination regarding the need for new or amended operating limitations. It is recognized that some modifications relate to powered systems that the FAA will certify for captive carriage only which will require further certification under a United States Navy (USN) Interim Flight Clearance (IFC).

3.2.1.3 FAA Experimental Certificates

For aircraft with Experimental Certificates, the Contractor shall secure FAA approval for each aircraft Major Change (as defined by 14 CFR 21.93) before the modification is used in support of this contract. For each modification, whether internal or related to the carriage of external stores, or external mold line, the Contractor shall secure and make available for review, a valid FAA airworthiness certification, FAA Form 8130-7 and associated Operating Limitations (Section J, Exhibit A, CDRL A001). Where the modification is a Major Change (defined by 14 CFR 21.93), the Contractor shall also secure the FAA's determination regarding the need for new or amended operating limitations. It is recognized that some modifications relate to powered systems that the FAA will certify for captive carriage only. Submittal of the complete data package is not required if an Offeror already has certified tankers.

3.2.1.4 Aircraft Modifications

All major alterations incorporated before contract award shall have sufficient data to determine that the equipment or provisions for the equipment meet the applicable civil, Original Equipment Manufacturer (OEM), or Military Standard (MIL-STD) for the type of aircraft concerned. If this data references FAA regulations as the standard, then the contractor shall provide Approved Data as defined in the FAA Order 8300.16 for any Major Alteration or Major repair. Major alterations to aircraft with Special and Standard Airworthiness Certificates shall have been certified as airworthy and properly documented using FAA Form 337 signed in blocks 6 (Conformity) and 7 (Return to Service) by persons authorized under 14 CFR § 43, and citing FAA Approval Data. Unless directed otherwise by the Government, the Contractor shall remove any major alteration incorporated before contract award that was not certified as airworthy by an appropriately rated FAA certified mechanic, aircraft manufacturer or repair station. Any major aircraft alterations (as defined in 14 CFR) performed after contract award, including alterations directed by the Government, shall have been certified as airworthy and properly documented using FAA Form 337 signed in blocks 6 (Conformity) and 7 (Return to Service) by persons authorized under 14 CFR 43, and citing the FAA Approved Data (defined in FAA Order 8300.16) in block 8 and an accompanying aircraft maintenance record entry. This applies to all aspects of the aircraft alteration to include cabin interior arrangement, electrical modifications, mechanical modifications, tie-downs, and antennas, as appropriate.

3.2.2 Navy Airworthiness Certification

All aircraft under this contract will require an USN issued IFC, see NAVAIRINST 13034.1 prior to conducting AAR Services. A test USN IFC may be required in order to clear specific platforms for AAR operations. In support of the IFC process, the Contractor shall make available for Government review records documenting the airworthiness of the aircraft and aircraft modifications, including but not limited to, Statements of Compliance With Airworthiness Standards (FAA form 8110-3), Major Repair and Alteration records (FAA form 337), Flight Manuals and Flight Manual Supplements, Instructions for Continuing Airworthiness, Supplemental Type Certificates (STC), etc. Data Deliverable required under (Section J, Exhibit A, CDRL A001).

The contractor shall obtain flight clearances from the Navy to refuel Navy/Marine Corps aircraft including but not limited to: F/A-18A-F, EA-6B, EA-18G, AV-8B, UAS, MV-22B, F-35B/C and E-2D aircraft. Note that currently, V-22 and E2-D aircraft are only authorized to refuel from a centerline system.

3.2.3 Policy and Procedures

A. The Contractor’s management policy and procedures shall ensure that contract execution and quality control are effective and in continuous compliance with 14 CFR and all contractual requirements. The Contractor’s policies and procedures shall require periodic management review of the quality system to ensure effective development, implementation, and execution of processes, systems, and requirements for support of and compliance with all contractual requirements. The Contractor shall develop and execute a specific written management plan to address all ground and flight operations items (section 3.2.3 and subsections) (Section J, Exhibit A, CDRL A002). The Contractor shall not begin flight operations until the procedures have been approved in writing by the CAS Government Flight Representative (GFR). The Contractor shall be responsible for writing, implementing, and enforcing their procedures and for identifying and correcting deficiencies. The procedures shall describe aircraft ground and flight operations required by sections 3.2.3.1-3.2.3.3) at all operating facilities. DCMA Instruction 8210.1, Change 1 Chapter 3 shall be used as guidance in developing the written procedures. If the Contractor references documents, such as existing company procedures, and operating instructions in these procedures, the referenced documents shall be made readily available for review and become part of the GFR approval process. If the Contractor possesses a 14 CFR Part 121 operating certificate, the associated FAA-approved Part 121 procedures may be used to satisfy the applicable portions of the Ground and Flight Operations Procedures (GOPs/FOPs). The Contractor shall make those procedures available for Government review upon request.

B. The Contractor shall comply with their GFR approved GOPs/FOPs and shall be responsible for identifying and correcting deficiencies for both Contractor and subcontractor operations. The Contractor shall be responsible for ensuring its subcontractors’ aircraft operations under this contract are safe and effective, and are responsible for ensuring its subcontractors have GFR approved procedures in place to meet these requirements.

C. A CAS GFR or designated representative will perform a biannual inspection of the Contractor’s operations. The purpose of these inspections is to evaluate the effectiveness of the Contractor’s GOP and FOP and their compliance with those procedures. A CAS GFR may conduct unscheduled inspections at any time during the contractor’s normal business day for the duration of the contract.

D. Standard operating instructions references are discussed below.

3.2.3.1 Contractor Procedures

The Contractor shall develop specific written Procedures for all flight and ground operations as required by this PWS (sections 3.2.3.1-3.2.3.3). The contractor is responsible for writing, implementing and enforcing its Procedures, and identifying and correcting deficiencies. The Procedures shall:

A. Provide specific guidance describing activities and requirements of this PWS pertaining to safety, and flight and ground operations applicable to this contract;

B. Describe in detail how the contractor ensures that individuals perform only duties they are qualified and authorized to perform;

C. Adequately explain all aspects of a given operation to include the purpose, scope, and steps to accomplish the task;

D. Identify the office/title of individual responsible for executing the specific procedure;

E. Include requirements to verify the successful completion of the procedure, when appropriate.

F. Be approved by the Government Flight Representative (GFR) after any changes.

3.2.3.2 Ground Operating Procedures (GOPs)

The Contractor shall establish and maintain Ground Operating Procedures (GOPs) that conform to the following:

14 CFR, § 43

8210.1C, Change 1 Para 5.1 Ground Operations Procedures 8210.1C, Change 1 Para 5.2.1 Master Training Plan 8210.1C, Change 1 Para 5.2.2 Training, Qualifications, Certifications Training Records 8210.1C, Change 1 Para 5.2.2.1 Initial/Recurring Currency of Employees 8210.1C, Change 1 Para 5.2.2.2 Record of Successful Course Completions 8210.1C, Change 1 Para 5.2.2.4 Other Certifications As Appropriate 8210.1C, Change 1 Para 5.3.1 Foreign Object Damage (FOD) and Tool Control Program 8210.1C, Change 1 Para 5.12.1 Aircraft/Equipment Hydraulic Fluid Analysis Program 8210.1C, Change 1 Para 5.15 Weight and Balance 8210.1C, Change 1 Para 5.19 Technical Orders/Maintenance Manuals 8210.1C, Change 1 Para 5.20 Aircraft Records Management 8210.1C, Change 1 Para 5.21 Safe-for-Flight Release

3.2.3.3 Flight Operating Procedures (FOPs)

The Contractor shall establish standard FOPs; provide them to the GFR for review and approval. Procedures must be up to date, reflect the current scope of operations, and be clearly understood by company employees. To ensure a safe, effective flight operations program, the Contractor shall abide by following, when appropriate:

14 CFR, § 135.267 Flight time limitations and rest requirements: Unscheduled for two-pilot crews.

14 CFR, § 61.56 Flight review.

14 CFR, § 61.57 Recent flight experience: Pilot In Command (PIC).

14 CFR, § 91.509 Survival equipment for overwater operations.

14 CFR, § 61.55 Second-In-Command (SIC) qualifications.

8210.1C, Change 1 Para 4.1.5 Contractor Flight Approval 8210.1C, Change 1 Para 4.1.7 Approved Flights 8210.1C, Change 1 Para 4.1.9.3 Maintenance Release Procedures 8210.1C, Change 1 Para 4.1.10 Documentation of Certificates, Licenses, and Permits 8210.1C, Change 1 Para 4.1.9.3 Aircraft Maintenance Release Procedures 8210.1C, Change 1 Para 4.1.13 Aircrew Duty and Rest Limitations 8210.1C, Change 1 Para 4.2.1 Contractor’s Requesting Official 8210.1C, Change 1 Para 4.4.11 Response to Emergencies 8210.1C, Change 1 Para 4.5.2.1 General requirements 8210.1C, Change 1 Para 4.8.7 Access to Records

3.3 AAR Capability Establishment

This section is applicable when the awardee will utilize AAR aircraft other than those having a current and valid USN IFC, for the purpose of certifying the awardee’s aircraft to perform AAR operations (CLIN 0005). By the end of the Capability Establishment period, the contractor’s proposed AAR aircraft must at a minimum be certified and cleared by the Navy to refuel the following Navy/Marine Corps aircraft: F/A-18A-F and EA-18G, with the objective of certifying and clearing all aircraft identified in PWS section 3.2.2. Additional data is not required for aircraft with current and valid USN IFCs, other than that required to establish the currency and validity. Airworthiness certification that has expired or that is/was issued by other than USN airworthiness authorities may be utilized to facilitate issuance of USN airworthiness, however supporting data will be required. Post award and before execution of AAR Flight Minutes (CLIN 0001), the contractor shall comply with requirements which include but are not limited to:

CDRL A001 Airworthiness and Related Substantiating Data submission (Section J, Exhibit A)

CDRL A002 Management Plan and Standard Operation Procedures submission (Section J, Exhibit A)

CDRL A003 OPSEC Plan submission (Section J, Exhibit A)

Management and Engineering airworthiness data review meetings

Aerial refueler certification flight planning coordination meetings

Missions for tanker and receiver aircraft certification flights

4.0 OPERATIONAL REQUIREMENTS

4.1 Mission Planning (Processing and Dissemination)

Under the Commander, NAVAIRSYSCOM, Program Manager Air (PMA)-226 is the overall CAS Program Manager. Depending on the mission and the customer, PMA-226 will designate Scheduling Officers (SO) to execute administrative tasks such as mission scheduling and coordination, and invoice certification. The Contractor Representative (CR) shall coordinate with the SO on all formal requests for AAR services to determine feasibility of support, associated cost of support, implications of support on other scheduled or potentially scheduled mission and any other necessary details requiring coordination.

Notwithstanding other directives of this PWS, flight operations may be scheduled at any time, 24 hours a day/seven days a week, subject to a minimum mission flight time. The Contractor shall provide a CR to contact, to cover scheduling 24 hours per day/seven days a week. Scheduled and planned maintenance requirements that will preclude availability of any tanker aircraft should be coordinated as far in advance as possible so that supportable commitments can be adjusted. As soon as it is determined that missions cannot be met, the Contractor shall inform the Government if any tanker aircraft are not able to meet assigned or future missions, via email or phone to the Contracting Officer’s Representative (COR).

A. The designated SO for all PMA-226 CNAF tanker Task Orders is the Contracted Air Services Office at Fleet Area Control and Surveillance Facility (FACSFAC) Virginia Capes (VACAPES).

B. The designated SO for other PMA-226 tanker Task Orders is the T&E Schedules Office for PMA-226 at NAS Patuxent River, Maryland. Scheduling conflicts within the confines of this contract will be decided by Commander, Naval Air Forces - Atlantic (CNAL) N3. The Government may change the SO during the course of the contract.

C. The SO and CR will communicate as often as required to develop the short range and long range schedule, but at a minimum, the CR will provide a weekly schedule to the SO reflecting events as flown, currently scheduled, flying hour execution and proposed aircraft maintenance schedule. This scheduling should include planned operation using Standard Mission Support Personnel.

D. If an additional mission is tasked and there is no aircraft currently in an operational status with crew attached, the Government will give the contractor as much advanced notice as possible to dispatch a tanker for additional tasking before cancelling the event. Notwithstanding other directives of this PWS, the Contractor shall be able to dispatch an aircraft within 72 hours of formal notification of tasking before being considered unable to meet tasking.

E. The Government may or may not order flight services on any given day of detachment operations.

4.1.1 Authorization of Flight Operations

All flight operations must be authorized through the SO or designated representative.

4.1.2 Released by the Government

When all flights for detachment operations have been completed, the SO will notify the CR, in writing, that the deployment is complete. Following this notification, the CR shall complete and implement arrangements to return the aircraft, personnel, and equipment to the home base.

4.2 Mission and Contract Coordination (Operational Reporting)

4.2.1 Meetings and Communications

4.2.1.1 Post-Award Conference (PAC)

The Contractor shall attend a PAC with the Government no later than 30 days after contract award at Patuxent River, Maryland or other CONUS location as determined by the Government to include contracts and management personnel. The PAC will cover the topics as set forth in FAR Subpart 42.5.

4.2.1.2 Program Management Reviews

The Government will schedule and conduct Program Management Reviews (PMR) on a semi-annual basis at NAVAIRSYSCOM PMA-226, Cherry Point, North Carolina, the Contractor’s facility, or other locations as directed by the COR. This typically consists of one (1) PMR at Cherry Point and one (1) PMR in CONUS annually. The Contractor shall attend (no more than two (2) contractor personnel may attend, unless prior approval for more personnel is obtained from the COR) all PMRs and make a presentation consisting of the following:

A. Overview of the work accomplished to date or since last review, the projected plan of action for completion of contract effort, and handout material documenting presentations.

B. Identification and discussion of problems encountered, if any, and action taken to resolve the problems.

C. Identification and discussion of problems anticipated and the Contractor’s plan of action for mitigation.

D. Experience working as a team with the other CAS Contractors and the Government, identifying successes and areas needing improvements.

4.2.1.3 Long Term Scheduled Maintenance Requirements

The Contractor shall coordinate with the SOs no less than once per month to discuss long term requirements (typically looking 12 to 24 months into the future) and identify potential aircraft scheduled maintenance. No special scheduling arrangements or considerations will be made to meet the Contractor’s maintenance requirements.

4.2.1.4 Accidents and Incident Reporting

The Contractor shall report all aircraft accidents and incidents IAW their MRP, GOPS and FOPS. After contacting the local base Commanding Officer, Safety Officer and Operations Officer, the Contractor shall immediately contact the PMA-226 representative. Do not leave messages. Call until you make contact with a PMA-226 Representative. PMA-226 Incident Reporting Phone Numbers will be provided at award.

4.2.1.5 Waiver Requests

Each aircraft used in the performance of this contract shall be operated and maintained IAW 14 CFR and its Navy Flight Clearance. If for any reason a contract requirement cannot be met, the Contractor shall notify the Procuring Contracting Officer (PCO), COR and CAS GFR, and submit a contract waiver request prior to conducting those operations, citing the specific requirement that cannot be adhered to.

4.2.2 Fuel

This is a “dry” contract. The Government will provide access to fuel at U.S. Government bases and civil fields. The Government will provide appropriate fuel cards for each of the Contractor’s aircraft. All fuel purchased by the contractor should be obtained from a military base whenever possible. Whenever “into plane” (government rate) fuel needs to be obtained from a civilian airport, the contractor shall record the circumstances and justification. Commercial non “into plane” fuel should only be used in extreme cases with the SO or COR advance approval.

The Contractor shall not use any Government provided fuel for any flight other than those scheduled under this contract.

The Contractor shall track all fuel consumption and provide fuel receipts, flight logs, and Fuel Reports to the Government IAW Section J, Exhibit A, CDRLs A004 and A005.

4.2.2.1 Fuel Card Training

All card users (Standard Mission Support Personnel) shall:

A. Complete the Card User Certification Course located at: https://www.navsup.navy.mil/public/navsup/ccpmd/air_card/training.

B. Complete the Online Certification and renew every two years.

C. Print the Certificate of Completion and provide a copy to the COR to be kept on file.

D. Sign a Card User Statement of Understanding (SOU) after conducting training.

4.2.3 Mishap Prevention and Aviation Safety Program

The Contractor shall establish and maintain an Aviation Safety and Mishap Prevention Program and ensure they are periodically reviewed by all aircrew members.

4.2.3.1 Aviation Safety Official

The Contractor shall designate an Aviation Safety Official with specific duties and responsibilities defined.

4.2.3.2 Risk Management Program

The Contractor shall establish and maintain an Operational Risk Management (ORM) Program.

4.2.3.3 Mishap Response Plan (MRP)

The Contractor shall establish and execute written procedures for responding to an aviation incident or accident (Section J, Exhibit A, CDRL A002). The MRP shall establish policies, responsibilities, and actions to be initiated if any aircraft becomes overdue or involved in an incident or mishap. The Contractor shall exercise the MRP on an annual basis. As a minimum, this plan shall include the following:

A. Procedures that conform to United States Code (USC) Title 49 Part 830 National Transportation Safety Board (NTSB);

B. Immediate action checklist to ensure command, control, and coordination of the rescue or recovery effort;

C. A notification plan which includes a current roster of Contractor and Government personnel (including duty and non-duty phone numbers) to be notified in the event of an aircraft mishap; and

D. Procedures for Contractor and subcontractor cooperation and participation in mishap investigations conducted by the Government. Procedures shall clearly define the differences between a Government Legal investigation (used to satisfy claims) and a Government Safety investigation (used for mishap prevention). The procedures shall clearly state the contractual obligation of Contractor personnel to provide information and participate in interviews by the Government Safety investigation immediately upon request. The Contractor shall have procedures that require, to the maximum extent possible, aircrew medical and toxicological testing immediately following a mishap. The results of medical and toxicological testing shall be provided to the Government Safety investigation board immediately upon request. The toxicological samples shall be provided to the Government legal investigation board immediately upon request.

4.2.4 Contract Status

The Contractor shall track flight minutes and all costs associated with each CLIN. The Contractor shall submit the Monthly Status Report IAW (Section J, Exhibit A, CDRL A006).

4.2.5 Public Aircraft Operations Status

The Contractor shall abide by all FAA “Public Aircraft Operations” notification procedures.

4.2.6 Transit Military Aircraft

Aircraft provided under this contract are considered transient military aircraft and not subject to landing fees at DoD-controlled airfields.

4.2.7 Civil Aircraft Landing Permits

The Contractor shall submit DD Form 2400 - Civil Aircraft Certificate of Insurance, DD Form 2401-Civil Aircraft Landing Permit and DD Form 2402-Civil Aircraft Hold Harmless Agreement, to the COR. These agreements must be kept current during the entire period of performance under the contract.

4.2.8 Maintenance Program

Aircraft used in the performance of this contract shall be maintained IAW 14 CFR and their Navy Airworthiness Certification. Additional requirements are listed in paragraph 3.2.3, Policies and Procedures.

4.2.9 Aeronautical Regulations

While operating as a Public Aircraft Operation, the Contractor shall operate and maintain the aircraft IAW 14 CFR unless a waiver is granted IAW paragraph 4.2.1. In addition, the Contractor shall operate the aircraft IAW USN, United States Air Force (USAF), and local military flying directives (including foreign Government requirements). The Contractor shall comply with DoD requirements for operation of civil aircraft in support of military operations.

4.2.10 Accident Costs

The Contractor shall be responsible for all accidents and damage to the aircraft that occurs during operation of the aircraft. The Contractor shall bear all costs to repair or replace aircraft parts and all additional ferry costs or travel costs that occur as a result of the accident or damage.

4.2.11 General Deployments

When directed by the SO, the Contractor shall deploy its aircraft, personnel, and required support equipment to perform at any airfield capable of supporting its aircraft. The Contractor shall plan, schedule, ship, and deploy its personnel and equipment, including all GFP, if applicable. On or about 30 days prior to deployments, the SO will work with the CR to coordinate and address requirements, services and detachment schedule. Although the schedule is subject to change based on fleet training requirements, the actual deployment schedule will be delivered to the CR no later than 72 hours (historically two (2) weeks) prior to facilitate final travel arrangements. If aircraft or aircrew substitutions are accomplished at the Contractor's request during a scheduled deployment, transit to and from the deployment base to accomplish the substitution shall be entirely at Contractor expense.

4.2.12 Communication and Navigation Capability

The Contractor shall ensure that all aircraft are equipped with the applicable communication and navigation capability to operate in the U.S. National Air Space. In addition, tasking requirements will require aircraft to deploy worldwide. The Contractor shall ensure that a sufficient number of aircraft are equipped, as applicable, to operate in international and foreign nation airspace. The Contractor shall comply with other FAA, International Civil Aviation Organization (ICAO), or foreign nation equipment pre-requisites, and shall be solely responsible to provide such equipment.

4.2.13 GFP Installation and Removal

During performance of this contract, installation and subsequent removal of GFP may be required by individual task orders. When required, the contractor shall provide personnel to install, maintain, operate and remove GFP. Use of GFP is typically required to record tanker aircraft flight dynamics during an airborne test with a receiver. The GFP may be used to measure key flight characteristics such as airspeed, altitude, outside air temperature, angle of bank, g-loading, on-board video recording, etc. In this case, GFP is a roll-on / carry-on monitor that will be strapped down and connected to the aircraft data bus systems. For some GFP installations, FAA approval via Form 8110-3s documenting compliance with 14 CFR requirements and Form 337s documenting modifications were performed IAW approved data may be required if the installation involves anything requiring FAA oversight.

To support the GFP installation and removal process, the Government will provide installation instructions and if required installation drawings and schematics for the contractor engineers and other contractor technical experts to utilize in facilitating installation. Contractor fabrication of mounting hardware for the GFP may be required. FAA Designated Engineering Representatives (DER) will provide any applicable Form 8110-3 approving the data and FAA Flight Standards inspectors or designee return the aircraft to service via a completed Form 337. If the GFP is to be contractor operated in flight, beyond the basic energize before test and de-energize after test, the Government will provide instructional manuals and other materials for operation of the GFP.

GFP for the performance of this contract will be limited to mission-specific GFP identified and transferred to the contractor via DD Form 1149.

4.3 Performance Metrics

This performance-based requirement includes performance metrics which are contained in the Quality Assurance Surveillance Plan (QASP), Section J attachment 2. The contractor’s performance will be assessed IAW the QASP.

4.4 Personnel Requirements

All personnel performing AAR operations shall have appropriate training and any necessary qualifications for AAR. AAR qualification/refresher training is the responsibility of the contractor. Personnel qualification and training records shall be provided to Government personnel. All personnel shall comply with local laws, policies, and regulations while aboard any military installation. All personnel working in an operational capacity (e.g., aircrew) or on U.S. or Foreign Government military installations shall be readily identifiable as contract employees through appropriate attire and badges while performing services under this contract.

4.4.1 Contractor Representative (CR)

The contractor shall be available to provide scheduling support 24 hours a day, seven days a week. Scheduling may be accomplished via Internet electronic mail account or phone (land-line or mobile). The contractor shall designate a point of contact for rapid response after duty hours. The CR shall have authority to schedule and assign contractor aircraft and crews in response to Government requirements. The CR shall interface between the Government and the contractor and shall:

A. Maintain close liaison with SO in matters regarding contractor’s aircraft and the current and projected schedule, both short and long term.

B. Develop short and long term flight hour and travel plan to assist the Government, when required, in determining the most effective and efficient operations of contractor aircraft.

C. Provide coordination between the contractor and Government scheduling office and higher authority to assist in determination of the most efficient and effective utilization of contractor assets in supporting various missions.

D. Maintain close liaison with current and future supported units to ensure effective operational continuity, obtain detailed mission information and identify potential operational concerns.

E. Provide contractor flight crews with comprehensive mission information and details of refueling tasking to include the customer unit (squadron, air wing, or Strike Group), number and type of aircraft, fuel offload requested, (AAR) location, on station times, altitudes, boom frequencies, etc.

F. Be familiar with applicable exercise scheduling or operational procedures as determined by the supported units and in turn, ensure that contractor flight crews are familiar with these exercises and other required regional operational instructions.

G. During operations, the contractor shall:

(1) Ensure attendance of pilots at required procedure and mission briefings.

(2) Ensure contractor aircraft launch in sufficient time to arrive at designated stations on time.

(3) Coordinate all maintenance, servicing, logistics, crew transportation, contractor personnel briefings, security clearances/vehicle registrations, and equipment/facility custodial functions in support of contractor operations.

(4) Provide daily “as flown” reports to facilitate flying hour management to the SO and a designated Program Manager AIR (PMA-226) representative. The report will contain a synopsis of flight hours and sorties completed, and billable flying minutes (CLINs 0001 and 0002) and fuel charges.

(5) At the conclusion of an operation, provide an all-inclusive summary to include the elements in (4) above and any recommendations for improvement or lessons learned.

H. Provide comprehensive post mission debriefs and other feedback as required or requested to the SO, supported units, or other government agencies to assist in future effective and efficient utilization of contractor assets.

4.4.2 Aircrew Requirements

The aircrew will operate the aircraft under the Contract IAW the aircraft’s FAA Airworthiness Certificate and 14 CFR requirements. In addition, regardless of aircraft type, the aircrew shall comply with the following requirements:

4.4.2.1 Provision for USG Personnel

Contractor shall make provisions for possible USG personnel on flights as requested. All USG personnel will be authorized by the assigned Government Flight Representative (GFR) or other designated representative prior to flight.

4.4.2.2 Scheduling

The company must demonstrate a closely monitored system that evaluates operational risks, experience levels of crewmembers, and ensures the proper pairing of aircrews on all flights. In multi-crew aircraft, a new PIC should be scheduled with a more experienced Flight Engineer/Aerial Refueling Panel Operator and Second in Command (SIC). A new Flight Engineer/Aerial Refueling Panel Operator should be scheduled with experienced PICs. The scheduling system must involve an established flight duty time program for aircrews, carefully managed so as to ensure proper crew rest. Aircrew flight time limitations and rest requirements shall comply with the provisions of CFR 135.267.

4.4.2.3 Pilot in Command (PIC)

The PIC shall have the final authority to determine whether an aircraft is airworthy, whether to launch or terminate a mission, and to deny boarding of anyone.

4.4.2.3.1 Pilot Certificate

The PIC shall hold at least a commercial, instrument rated pilot certificate with appropriate category and class ratings and type rating for the aircraft. The PIC shall have at least 1200 hours total pilot time, 100 hours night time, and 75 hours of actual or simulated instrument time, at least 50 hours of which are in actual flight. The PIC shall meet the recent experience requirements of 14 CFR § 61.57.

4.4.2.3.2 Flight Reviews

Prior to flying as PIC, the pilot shall have completed a flight review in the type of aircraft being flown within the preceding 12 months. The flight review shall be conducted IAW 14 CFR 61.56.

4.4.2.3.3 Instrument Proficiency Check

Prior to flying as PIC, the pilot shall have completed an instrument proficiency check in the type of aircraft being flown within the preceding 12 months. The instrument proficiency check shall be conducted IAW 14 CFR 61.57(d). If a pilot is qualified in more than one type of aircraft under the Contract, the pilot shall complete an instrument proficiency check in each type aircraft on an alternating 12 month basis. In no case shall a pilot serve as a PIC in an aircraft type that he or she has not conducted an instrument proficiency check within the preceding 24 months. A flight simulator may be used for the instrument check provided the flight simulator represents the type of aircraft used under the contract and the check is conducted by a training center certified by the FAA.

4.4.2.4 Records

Flight Crew Personnel records shall be maintained and reflect such data as experience, qualifications, and applicable medical status.

4.4.2.5 Aircrew Proficiency

Contractor shall have a process of assessing aircrew to ensure that they are able to demonstrate aircraft proficiency IAW company established standards. Flight crews must be able to determine an aircraft's maintenance condition prior to flight and use standardized methods to accurately report aircraft deficiencies to the maintenance activity. Regardless of the type of aircraft, all flights shall have a PIC and a SIC pilot, if the aircraft is configured for dual pilots. The SIC shall hold a commercial instrument rated pilots certificate and meet the requirements of 14 CFR § 61.55.

4.4.2.6 Aircrew/Maintenance Communications

Effective lines of communication that permit feedback from aircrew and maintenance personnel to operations and maintenance managers shall be maintained.

4.4.2.7 Aircrew Training

Training, including recurrent training, must be conducted in order to develop and refine skills designed to eliminate mishaps and improve safety. Captain and First Officer training objectives must cultivate similar levels of proficiency. Crew training for pilots, engineers, and project specialists must be appropriate to the level of risk and circumstances anticipated for the trainee.

4.4.2.8 Maintenance Personnel

Contractors seeking to support AAR Public Aircraft Operations (PAO) shall hire and train the number of employees required to safely maintain the company aircraft and support the scope of the maintenance operations both at home station (the company's primary facility) and detachment locations. These personnel shall ensure that all maintenance tasks, including required inspections and airworthiness directives, are performed; that maintenance actions are properly documented; and that the discrepancies identified between inspections are corrected.

4.4.2.9 Crew Resource Management

For Multi-Piloted Aircraft training shall include a selection and training process that considers proven experience, decision making, crew resource management, and response to unusual situations, including stress and pressure.

4.5 Quality and Safety Requirements

The Contractor shall establish, implement, and monitor Company policies and procedures, including appropriate guidance related to Ground and Flight standards. The Contractor shall demonstrate cooperative interaction and response to the assigned GFR and any NAVAIRSYSCOM oversight inspections, critiques, or comments.

4.6 Safety and Survival Equipment Requirements

Aircrew and Installed Aircraft Survival Equipment for carriage of personnel IAW OEM or 14 CFR requirements will be reviewed and approved by GFR and initially in the Navy Airworthiness process. Aircraft survival equipment for overwater operations shall meet requirements of 14 CFR § 91.509.

5.0 GOVERNMENT OVERSIGHT

A GFR or his designated representative will perform periodic inspections of the Contractor’s operations. The purpose of these inspections is to evaluate the Contractor’s compliance with contract requirements related to aircraft operations, including compliance with the requirements from 14 CFR and the DCMA INST 8210.1C, Change 1 as delineated in this PWS. This will be applicable to the prime Contractor and any subcontractors operating in support of the contract. The Contractor is responsible for identifying and correcting deficiencies in subcontractor operations.

The Contractor shall make available to the GFR for review the following:

A. Pilot Records, including pilot certificates, logbooks, effective date and class of medical certificates, the date and results of the last flight review and instrument proficiency check, and any other pertinent information to determine compliance with the Contract requirements.

B. Maintenance personnel records to include, but not limited to, training records and required certification documentation.

5.1 FAA Inspection and Reviews

The Contractor shall notify the GFR of, and make available for review, the results of any FAA inspection or review of the Contractor’s operations or any action taken by the FAA against the Contractor that are PAO specific in the Contractor’s Progress, Status and Management Report (Section J, Exhibit A, CDRL A006).

5.2 Aircraft Maintenance Management Team

In addition to GFR reviews, at a minimum every two years, a NAVAIRSYSCOM Aircraft Maintenance Management Team, under the direction of the Aircraft Controlling Custodian Office, will provide an outside evaluation of the contractor and the GFR, and assess the overall risks associated with the contract.

5.3 Government Notification

The Contractor shall report all aircraft accidents and incidents IAW their MRP, GOPs, FOPs and section 4.2.1.

5.4 Investigations

The Contractor shall cooperate and support accident and incident investigations conducted by the Government or a government investigation body. In the event that the U.S. DoD conducts an investigation, the Contractor shall have accident and incident response procedures that clearly define the differences between a Government Legal investigation (used to satisfy claims) and a Government Safety investigation (used for accident and incident prevention). Contractor personnel shall provide information and interviews to the Government Safety investigation immediately upon request.

5.5 Hazard Reports and Engineering Investigations

In the event that a potential hazard is identified associated with the operation or a material issue associated with the aircraft, the Contractor shall notify the GFR to determine if further investigation is warranted in mitigating risks associated with potential future exposure. If this hazard is associated with the material condition or the function of a component on the aircraft, the Contractor may be required to perform an Engineering Investigation (EI) of that component. The Government will provide support (particularly GFP) or oversight if an EI is required.

6.0 GOVERNMENT FURNISHED PROPERTY

GFP is not provided under this contract; however unique developmental GFP may be required by special mission evaluation test flights. If provided the contractor shall manage and report GFP (Section J, Exhibit A, CDRL A007).

6.1 Accountability

The Contractor shall maintain strict accountability of all GFP parts/equipment in its possession. The Contractor shall maintain accurate and current chain of custody documentation to track turnover/possession between the U.S. Government and the Contractor.

For all GFP received under this contract, the Contractor shall conduct all necessary examinations, inspections, and maintenance. The Contractor shall be responsible for reporting all losses and damage to the Government IAW (Section J, Exhibit A, CDRL A007). The Contractor shall update the GFP listing annually to ensure the GFP list is accurate and complete. Any additions or subtractions of GFP changes shall be noted in (Section J, Exhibit A, CDRL A007).

In the case of theft or loss, the reported incident will be examined by the COR. Examination of all aspects of the incident, to include documentation, will be reviewed and final determination will be made by the responsible Contracting Officer.

6.2 Return of GFP

The Contractor shall remove all GFP from aircraft and return to the Government within thirty (30) days after the end date of the contract IAW FAR 52.245-1.

7.0 OTHER PERFORMANCE REQUIREMENTS

7.1 Work Hours and Location

The Contractor shall coordinate ground and flight crew daily schedules as necessary to meet the Operational Tasking of the Schedules Officer.

7.2 Reserved

7.3 Technical Assistance Agreements (TAAs)

The contractor shall ensure that appropriate Technical Assistance Agreements (TAAs) and/or applicable export licenses are in place before conducting any activity under this PWS which requires such approval and documentation.

7.4 International Traffic in Arms Regulations (ITAR)

When handling export controlled items, including information, technology or hardware, it is the Contractors responsibility to notify the COR and develop and maintain internal controls as required by the Export Administration Regulations (EAR) and the International Traffic in Arms Regulations (ITAR).

8.0 SECURITY

8.1 The Contractor shall execute contract efforts IAW applicable DoD Security Classification Guides (SCG), marking practices, requirements documents, and the Program Protection Plan (PPP) provided as Government Furnished Information (GFI).

8.2 The Contractor shall use DoD 5205.02-M, DoD Operations Security (OPSEC) Program Manual, Office of the Chief of Naval Operations (OPNAV)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .