Items_included_in_Amendment_0001_20151009.docx

DOCX document 20 KB Posted

Attached to
Naval Test Wing Atlantic (NTWL) Federal contract opportunity
Solicitation number
N00421-15-R-0044
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Items included in Amendment 0001 20151009

View the file

Other files for this federal contract opportunity

Other files attached to Naval Test Wing Atlantic (NTWL), newest first.
File Type Posted
Att_J-20_QASP_AMD_0006_20160217.docx DOCX document
Exhibit_A_DD_Form_1423 _NTWL_CDRLS_A001-A004_AMD_0006_20160217.pdf PDF
Items_included_in_AMD_0006_20160217.docx DOCX document
N00421-15-R-0044-0005.docx DOCX document
Att_J-19_PBSOW_AMD_0005_20160129.docx DOCX document
Att_J-20_QASP_AMD_0005_20160129.docx DOCX document
N00421-15-R-0044-0004.docx DOCX document
Items_included_in_Amendment_0003_20151105.docx DOCX document
Att_P-6_Vol_3_PP-1_Con_Data_20151105_AMD_003.xlsx XLSX spreadsheet
NTWL_N00421-15-R-0044-0002_RFP_Release_to_FBO_20151022.docx DOCX document
Att_P-10_Vol_5_NPE_CS_20151021_AMD_0002.xls XLS spreadsheet
Att_P-8_Vol_5_CP_ExB_201501021_AMD_0002.xlsx XLSX spreadsheet
Att_P-9__Vol_5_Prime_CCS_20151021_AMD_0002.xls XLS spreadsheet
Att_P-3_Vol_2_T-2_Manning_20151009.xlsx XLSX spreadsheet
NTWL_N00421-15-R-0044-0001_Release_to_FBO_20151013.docx DOCX document
Att_P-3_Vol_2_T-2_Manning_20150909.xlsx XLSX spreadsheet
Att_J-8_SAAR-N_20150909.pdf PDF
Att_J-1_PQS_FLT_Deck_Fam_20150909.pdf PDF
DD_Form_1423 _NTWL_CDRLS_A001-A004_20150909.pdf PDF
Att_P-5_Vol_3_PPQ_20150909.docx DOCX document
Att_P-2_Vol_2_T-1_CRM_20150909.xlsx XLSX spreadsheet
Att_J-4_TASS_Reg_Req_20150909.pdf PDF
Att_J-7_SECNAV_BaseVisitReq_20150909.pdf PDF
Att_P-6_Vol_3_PP-1_Con_Data_20150909.xlsx XLSX spreadsheet
Att_J-3_OPSEC_DI-MGMT_20150909.pdf PDF
Att_J-6_Base_Acc_Req_20150909.doc DOC document
DD_Form_1423 _NTWL_CDRLS_A009-A012_20150909.pdf PDF
Att_J-12_COCA_20150909.xlsx XLSX spreadsheet
Att_J-10_SAAR-N_Guide_20150909.docx DOCX document
NTWL_N00421-15-R-0044_A-M_RFP_Release_to_FBO_20150914.docx DOCX document
Draft_RFP_Industry_Questions_and_Government_Responses_20150910.xlsx XLSX spreadsheet
Draft_RFP_Industry_Questions_and_Government_Responses_20150903.xlsx XLSX spreadsheet
NTWL_Pre-Sol_Conference_Brief_-_FPO_Posting.pptx PPTX presentation
Att_J-5_Non-Nisp_PP.pptx PPTX presentation
P-11_Vol_5_FB_Labor_Rates.xlsx XLSX spreadsheet
Att_J-1_PQS_FLT_Deck_Fam.pdf PDF
P-2_Vol_2_T-1_CRM_20150630.xlsx XLSX spreadsheet
Att_J-6_Base_Acc_Req.doc DOC document
Att_J-10_SAAR-N_Guide.docx DOCX document
Att_J-13_Travel_Req.xls XLS spreadsheet
P-6_Vol_3_PP-1_Con_Data_06262105.xlsx XLSX spreadsheet
Att_J-7_SECNAV_BaseVisitReq.pdf PDF
Att_J-20_QASP.docx DOCX document
Att_J-15_DOL_WDs_05-2103.docx DOCX document
P-3_Vol_2_T-2_Manning_20150610.xlsx XLSX spreadsheet
Att_J-4_TASS_Reg_Req.pdf PDF
Att_J-19_PBSOW.docx DOCX document
DD_Form_1423 _NTWL_CDRLS_A005-A008.pdf PDF
N00421-15-R-0044_NTWL_Draft_RFP.doc DOC document
NTWL_Draft_PBSOW.docx DOCX document
Show all 50

Naval Test Wing Atlantic (NTWL) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP

1. Minor editorial updates (e.g. spacing, addition of transition words) throughout.

2. Throughout Section L, updated the title of Annex C to “Final Versions of Previous SOW/PWSs/Other Supporting Documentation for Past Performance and Corporate Experience”;

3. Section L, Part B, Volume 2 (Technical), Paragraph 2.2.e updated to add "for each work center” to the end of the first sentence. "The Offeror shall provide a top-level block diagram or flow chart of the overall process showing man-hours and man loading for each work center";

4. Section L, Part B, Volume 2 (Technical), Paragraph 2.5.a, added “Plan” after “Transition”; Paragraph 2.5.b, added “Plan” after “Phase In”;

5. Section L, Part B, Volume 2 (Technical), Paragraph 2.5 Transition / Phase In Plans, Moved Phase-in 2.5b.(1) to Section L, Part B, Paragraph 2.5a.(4) and modified wording to read “Submit a manning schedule that indicates manning by site, work center and function during transition. Indicate a "ramp-up" to achieve full manning levels and performance. Analysis shall account for workload requirements/fluctuations, operational commitments/tempo, work in progress, and other area impacts.” Moving resulted in renumbering 2.5b.(2) and (3) to 2.5b.(1) and (2);

6. Section L, Part B, Volume 3 (Past Performance), updated the Annex C title and added “… or other supporting solicitation/contract documentation …”;

7. Section L, Part B, Volume 3 (Past Performance), PP-1 (Contract Data) updated data elements 13a. and 13b.

a. Data element 13a.

i. Updated the citation from “DCMA 8210.01 Series” to “DCMA 8210. 1 Series”

ii. Added “…or other supporting solicitation/contract documentation …”

b. Data Element 13b.

i. Updated data element to “Magnitude/Complexity”

ii. Updated the instructions

8. Section L, Part B, Volume 3 (Past Performance), Paragraph 3.2, Table PP-1 (Past Performance Contract Data), update Data Element 13.b (Magnitude/Complexity);

9. Section L, Part B, Volume 3 (Past Performance), Paragraph 3.3a.(1)a), updated “those” to “type/model/series”;

10. Section L, Part B, Volume 4 (Corporate Experience), Paragraph 4.0 updated to “the relevant portions (sections and paragraphs) of the contract reference’s SOW/PWS or other supporting solicitation/contract documentation”;

11. Section L, Volume 5 (Cost/Price), Paragraph 5.3, Section 2 (Firm Fixed Price CLINs (X001 – X006)), added instructions for Premium Pay cost and Shift Differential;

12. Section L, Volume 5 (Cost/Price), Paragraph 5.3, Section 3 (Cost Plus Fixed Fee CLINs (X007 – X030), removed the word “premiums”;

13. Section L, Volume 5 (Cost/Price), Paragraph 5.3, Section 3 (Cost Plus Fixed Fee CLINs (X007 – X030), modified instructions for Premium Pay cost and added instructions for Shift Differential;

14. Section M-1 Evaluation Factors for Award, II Specific Information, B. Past Performance added “Only performance on relevant contracts will be considered in the evaluation. Performance that took place greater than 3 years from the proposal due date will not be evaluated under this factor. The relevancy and recency of the past performance information, as well as its associated consequence will be used in determining the Performance Confidence Level Rating.”; and

15. Section M-1 Evaluation Factors for Award, II Specific Information, C. Corporate Experience added “Only corporate experience on relevant contracts will be considered in the evaluation. Corporate experience that took place greater than 3 years from the proposal due date will not be evaluated under this factor.”

J Attachments

1. J-20 QASP, Enclosure (2), Section 2.5, VX-23 T/M/S Systems Required for RA Aircraft: Added “… and EA-18G” P Attachments

2. Att P-3 Vol 2 T-2 Manning

a. Instruction Tab, added instructions for “Manning/Personnel Skill Levels” and “Premium Pay”

b. Location Tabs (e.g. VX-20), removed the pricing portion of the premium pay table

3. Att P-6 Vol 3 PP-1 Con Data

a. Instructions tab for data element 13a. added “…or other supporting solicitation/contract documentation …”

b. Data element 13a. on the PP-1 tab

i. Updated the citation from “DCMA 8210.01 Series” to “DCMA 8210. 1 Series”

ii. Added “…or other supporting solicitation/contract documentation …”

c. Data Element 13b. on the PP-1 tab

i. Updated data element to “Magnitude/Complexity”

ii. Updated the instructions

4. Att P-9 Vol 5 Prime CCS and Att P-10 Vol 5 NPE CS

a. Instruction Tab, added instructions for Premium Pay and Shift Differential.

b. Location Tabs, added cells for “Premium Pay” and “Total Direct Labor Cost plus Premium Pay”

L Attachments

1. Att L-7 Government Manpower Estimate: Updated the VX-20 Tab (TPAs and PRs) and VX-23 Tab (Fighter Shop Powerplant). Changes indicated in bold red.

File details come from the government source that posted it. Updated .