Att_P-9__Vol_5_Prime_CCS_20150909.xls
XLS spreadsheet 594 KB Posted
- Attached to
- Naval Test Wing Atlantic (NTWL) Federal contract opportunity
- Solicitation number
- N00421-15-R-0044
About this file
FINAL RFP Att P-9 Vol 5 Prime CCS 20150909
View the file
Other files for this federal contract opportunity
Show all 50
Naval Test Wing Atlantic (NTWL) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| RFP N00421-15-R-0044, Attachment P-9 |
| 1) Gray shading indicates cells where no data or formulae are expected. Example data entered in red italics and should be deleted by offeror. |
| 2) Provide contractor labor categories and FTE, Productive Hours, and Priced Hours from Manning Attachment P-3 contained in the technical volume. Insert rows as necessary to accommodate all labor categories. Replace the generic titles e.g., Labor category 1) with the specific titles for the proposed labor categories. Ensure Labor category titles are traceable to rates source (e.g., CBA or FPRA). |
| 3) Provide total from Attachment P-11 - Subcontractor Cost Summary |
| 4) Delete example data and allocate 'Total Labor Cost (for Prime and Subcontractor Labor) and Total Fee (for Prime and Subcontractor Labor) to CPFF CLINS proportionally on the basis of direct labor costs per CLIN. Insert rows as necessary to accomodate subcontracted work. See VX-20 CPFF CLIN Labor Tab for example. |
| 5) Overtime only applies to CPFF CLINS/Tabs. Calculate overtime as 3.5% of "Total Prime Contractor Straight Time Labor Cost." Total Prime Contractor Straight Time Labor Cost |
| plus Overtime will equal Total Prime Contractor Labor Cost. See rows 41 - 43 of the HX-21 MV-22B tab as an example of the calculation. |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 MV-22B FFP Labor
| N00421-15-R-0044; ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X001: HX-21 MV-22B Shared Labor | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X001 | HX-21 MV-22B Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Note 2 | ||||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost (Note 3) | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Firm Fixed Price (FFP) Labor |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 MV-22B CPFF Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| HX-21 MV-22B COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X007 | MV-22B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Pay Premiums from Manning Attachment L-1 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Cost plus Premiums | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Prime Contractor Straight Time labor Cost) | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost (Note 3) | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 FFP Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X002: HX-21 SHARED LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X002 | HX-21 Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Note 2 | ||||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost 3 | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Firm Fixed Price (FFP) Labor |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 CPFF Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| HX-21 COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X008 | AH-1W Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $2,000,000 | |||||||||||||||||||||||||||||
| X009 | AH-1Z Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $850,000 | |||||||||||||||||||||||||||||
| X010 | UH-1Y Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | Etc. | |||||||||||||||||||||||||||||
| X011 | MH-60R Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X012 | MH-60S Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X013 | MH-60S Maintenance Labor SAR | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X014 | MH-53E Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X015 | TH-57C Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Pay Premiums from Manning Attachment L-1 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Cost plus Premiums | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Prime Contractor Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost (Note 3) | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | $42,500,000 | |||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | $1,700,000 | |||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | $44,200,000 | |||||||||||||||||||||||||||||
| $42,500,000 | $1,700,000 | $44,200,000 | ||||||||||||||||||||||||||||
| Allocation of Total Cost and Fee to CLINS (Note 4) | Total for All Years | Base Period | Base Period | Base Period | Base Period | Base Period | ||||||||||||||||||||||||
| FTE | Hours | Amount | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | |||
| X008 | AH-1W Maintenance Labor | |||||||||||||||||||||||||||||
| Prime Contractor, Inc. | $2,000,000 | |||||||||||||||||||||||||||||
| Subcontractor A, Inc. | $150,000 | |||||||||||||||||||||||||||||
| Total | $2,150,000 | 9.21% | $3,913,276 | $156,531 | $4,069,807 | |||||||||||||||||||||||||
| X009 | AH-1Z Maintenance Labor | |||||||||||||||||||||||||||||
| Prime Contractor | $850,000 | 3.64% | $1,547,109 | $61,884 | $1,608,994 | |||||||||||||||||||||||||
| X010 | UH-1Y Maintenance Labor | |||||||||||||||||||||||||||||
| X011 | MH-60R Maintenance Labor | |||||||||||||||||||||||||||||
| X012 | MH-60S Maintenance Labor | |||||||||||||||||||||||||||||
| X013 | MH-60S Maintenance Labor SAR | |||||||||||||||||||||||||||||
| X014 | MH-53E Maintenance Labor | |||||||||||||||||||||||||||||
| X015 | TH-75C Maintenance Labor | |||||||||||||||||||||||||||||
| Total | $23,350,000 | $42,500,000 | $1,700,000 | $44,200,000 |
&LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
VX-23 FFP Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X003: VX-23 SHARED LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X003 | VX-23 Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Note 2 | ||||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost 3 | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Firm Fixed Price (FFP) Labor |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
VX-23 CPFF Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| VX-23 COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X016 | F/A-18 Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X017 | EA-6B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Pay Premiums from Manning Attachment L-1 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Cost plus Premiums | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Prime Contractor Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost (Note 3) | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | ||||||||||||||||||||||||||||||
| Allocation of Total Cost and Fee to CLINS (Note 4) | Total for All Years | Base Period | Base Period | Base Period | Base Period | Base Period | ||||||||||||||||||||||||
| FTE | Hours | Amount | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | |||
| X016 | F/A-18 Maintenance Labor | |||||||||||||||||||||||||||||
| Prime Contractor, Inc. | ||||||||||||||||||||||||||||||
| Subcontractor A, Inc. | ||||||||||||||||||||||||||||||
| Total | ||||||||||||||||||||||||||||||
| X017 | EA-6B Maintenance Labor | |||||||||||||||||||||||||||||
| Prime Contractor | ||||||||||||||||||||||||||||||
| Total | ||||||||||||||||||||||||||||||
| Total |
&LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
VX-20 FFP Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X004: VX-20 SHARED LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X004 | VX-20 Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost 3 | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Firm Fixed Price (FFP) Labor |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
VX-20 CPFF Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY | ||||||||||||||||||||||||||||||
| VX-20 COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X018 | KC-130J Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $2,000,000 | |||||||||||||||||||||||||||||
| X019 | KC-130J R/T Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $850,000 | |||||||||||||||||||||||||||||
| X020 | E-6B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | Etc. | |||||||||||||||||||||||||||||
| X021 | E-2C Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X022 | E-2D Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X023 | C-2A Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X024 | P-8A Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X025 | P-3C Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X026 | C-38 Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X027 | UC-12B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X028 | T-6A Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Pay Premiums from Manning Attachment L-1 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Cost plus Premiums | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Prime Contractor Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost (Note 3) | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | $42,500,000 | |||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | $1,700,000 | |||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | $44,200,000 | |||||||||||||||||||||||||||||
| $42,500,000 | $1,700,000 | $44,200,000 | ||||||||||||||||||||||||||||
| Allocation of Total Cost and Fee to CLINS (Note 4) | Total for All Years | Base Period | Base Period | Base Period | Base Period | Base Period | ||||||||||||||||||||||||
| FTE | Hours | Amount | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | DL Cost | DL Proportion | Cost | Fee | Total | |||
| X018 | KC-130J Maintenance Labor | |||||||||||||||||||||||||||||
| Prime Contractor, Inc. | $2,000,000 | |||||||||||||||||||||||||||||
| Subcontractor A, Inc. | $150,000 | |||||||||||||||||||||||||||||
| Total | $2,150,000 | 9.21% | $3,913,276 | $156,531 | $4,069,807 | |||||||||||||||||||||||||
| X019 | KC-130J R/T Maintenance Labor | |||||||||||||||||||||||||||||
| Prime Contractor | $850,000 | 3.64% | $1,547,109 | $61,884 | $1,608,994 | |||||||||||||||||||||||||
| X020 | E-6B Maintenance Labor | |||||||||||||||||||||||||||||
| X021 | E-2C Maintenance Labor | |||||||||||||||||||||||||||||
| X022 | E-2D Maintenance Labor | |||||||||||||||||||||||||||||
| X023 | C-2A Maintenance Labor | |||||||||||||||||||||||||||||
| X024 | P-8A Maintenance Labor | |||||||||||||||||||||||||||||
| X025 | P-3C Maintenance Labor | |||||||||||||||||||||||||||||
| X026 | C-38 Maintenance Labor | |||||||||||||||||||||||||||||
| X027 | UC-12B Maintenance Labor | |||||||||||||||||||||||||||||
| X028 | T-6A Maintenance Labor | |||||||||||||||||||||||||||||
| Total | $23,350,000 | $42,500,000 | $1,700,000 | $44,200,000 |
&LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
USNTPS FFP Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X005: USNTPS SHARED LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X005 | USNTPS Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost 3 | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Firm Fixed Price (FFP) Labor |
&LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVol 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
USNTPS CPFF Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| USNTPS COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X029 | USNTPS Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Pay Premiums from Manning Attachment L-1 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct Labor Cost plus Premiums | ||||||||||||||||||||||||||||||
| Prime Contractor Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Prime Contractor Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Prime Contractor Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Prime Contractor Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Prime Contractor Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | ||||||||||||||||||||||||||||||
| Subcontractor Labor Cost (Note 3) | ||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | ||||||||||||||||||||||||||||||
| Subcontractor 1 | ||||||||||||||||||||||||||||||
| Subcontractor 2 | ||||||||||||||||||||||||||||||
| Etc. | ||||||||||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | ||||||||||||||||||||||||||||||
| Prime contractor pass through (not including fee) | ||||||||||||||||||||||||||||||
| Handling | ||||||||||||||||||||||||||||||
| G&A | ||||||||||||||||||||||||||||||
| Other (if any) | ||||||||||||||||||||||||||||||
| Total pass through (not including fee) | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost | ||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | ||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor | ||||||||||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | ||||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-9&CVolume 5 Prime Contractor Cost Summary&RSolicitation # N00421-15-R-0044
NTWL FFP Labor
| ATTACHMENT P-9 | ||||||||||||||||||||||||||||||
| PRIME CONTRACTOR COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X006: NTWL Program Support | ||||||||||||||||||||||||||||||
| Prime Offeror Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X006 | NTWL Program Support | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .