Att_P-3_Vol_2_T-2_Manning_20151009.xlsx
XLSX spreadsheet 190 KB Posted
- Attached to
- Naval Test Wing Atlantic (NTWL) Federal contract opportunity
- Solicitation number
- N00421-15-R-0044
About this file
Att P-3 Vol 2 T-2 Manning 20151009
View the file
Other files for this federal contract opportunity
Show all 50
Naval Test Wing Atlantic (NTWL) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for Table T-2 Manning | |
| For the worksheets titled VX-20, HX-21 111, HX-21 109, VX-23, TPS, and NTWL Support | |
| Column AA - Rationale | Provide a rationale for how the manpower requirements were determined. Describe the method by which the FTEs for each labor category were calculated or determined and identify data or standards used. Describe adjustments from data or standards and the rationale. |
If bidding in accordance with the Government estimate, so state.
| Manning/Personnel Skill Levels | On the top portion of the tab for each location (e.g. VX-20), propose ALL of the manning/personnel skill levels, and expertise to perform the work required by this solicitation in accordance with Section L. |
| Premium Pay | Use the Premium Pay table at the bottom of each location tab (e.g. VX-20) to display the various FTEs proposed WITHIN the manning/personnel skill levels proposed above that will carry Premium Pay qualifications in accordance with the CBA. |
E.g., If a total of 100 FTEs are proposed for the manning/personnel skill levels, indicate how many of the 100 FTEs will carry premium pay qualifications in accordance with the CBA.
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
VX-20
| VX-20 Hangar 306 | Labor Source | Entity | TOTAL FOR ALL YEARS | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | RATIONALE | |||||||||||||||||
| SHIFT | DX | NX | MX | WEEKEND | CLIN(S) | CBA/DOL Professional | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | Include changes from year to year |
SHOP/Labor Category
Total 0 0 0 0 N/A N/A N/A
| Premium Pay | Full Time Equivalents (FTE) | ||||
| Category | DX | NX | MX | WEEKEND | Rational |
| Aircrew Premium 1 |
Aircrew Premuim 2
Shipboard
Engine Turn/APU Qualifier
CDI/CDQAR
Plane Captain
Aircraft Engine Turn
Fuel Cell Confined Space
V-22 Blade Fold
Detachment Coordination
Temporary WC Supervisor
SPOC
Phase Coordinator
Ordnance Pay Differential
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
VX-20 By CLIN
| X004 | VX-20 Shared Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| FFP | Category | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X018 | KC-130J Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X019 | KC-130 R/T Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X020 | E-6B Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X021 | E-2C Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X022 | E-2D Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X023 | C-2A Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X024 | P-8A Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X025 | P-3C Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X026 | C-38 Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X027 | UC-12B Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X028 | T-6A Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
Total
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
HX-21 111
| HX-21 HANGAR 111/Warehouse 2832 | Labor Source | Entity | TOTAL FOR ALL YEARS | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | RATIONALE | |||||||||||||||||
| SHIFT | DX | NX | MX | WEEKENDS | CLIN(S) | CBA/DOL Professional | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | Include changes from year to year |
SHOP/Labor Category
Total 0 0 0 0
| Premium Pay | Full Time Equivalents (FTE) | ||||
| Category | DX | NX | MX | WEEKEND | Rational |
| Aircrew Premium 1 |
Aircrew Premuim 2
Shipboard
Engine Turn/APU Qualifier
CDI/CDQAR
Plane Captain
Aircraft Engine Turn
Fuel Cell Confined Space
V-22 Blade Fold
Detachment Coordination
Temporary WC Supervisor
SPOC
Phase Coordinator
Ordnance Pay Differential
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
HX-21 111 By CLIN
| X002 | HX-21 Shared Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| FFP | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X008 | AH-1W Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X009 | AH-1Z Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X010 | UH-1Y Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X011 | MH-60R Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X012 | MH-60S Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X013 | MH-60S Maintenance Labor SAR | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X014 | MH-53E Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X015 | TH-57C Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
| TOTAL |
| Total |
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
HX-21 109
| HX-21 HANGAR 109 | Labor Source | Entity | TOTAL FOR ALL YEARS | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | RATIONALE | |||||||||||||||||
| SHIFT | CBA/DOL Professional | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | Include changes from year to year | ||||||
| DX | NX | MX | WK | CLIN(S) | ||||||||||||||||||||||
| SHOP/Labor Category |
Total 0 0 0 0
| Premium Pay | Full Time Equivalents (FTE) | ||||
| Category | DX | NX | MX | WEEKEND | Rational |
| Aircrew Premium 1 |
Aircrew Premuim 2
Shipboard
Engine Turn/APU Qualifier
CDI/CDQAR
Plane Captain
Aircraft Engine Turn
Fuel Cell Confined Space
V-22 Blade Fold
Detachment Coordination
Temporary WC Supervisor
SPOC
Phase Coordinator
Ordnance Pay Differential
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
HX-21 109 By CLIN
| X001 | HX-21 MV-22B Shared Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| FFP | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X007 | MV-22B Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
Total
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
VX-23
| VX-23 Hangar 115 | Labor Source | Entity | TOTAL FOR ALL YEARS | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | RATIONALE | ||||||||||||||||||
| SHIFT | DX | NX | MX | WEEKEND | CLIN(S) | CBA/DOL Professional | FTE | Productive Hours | Total | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | Include changes from year to year |
SHOP/Labor Category
Total 0 0 0 0
| Premium Pay | Full Time Equivalents (FTE) | ||||
| Category | DX | NX | MX | WEEKEND | Rational |
| Aircrew Premium 1 |
Aircrew Premuim 2
Shipboard
Engine Turn/APU Qualifier
CDI/CDQAR
Plane Captain
Aircraft Engine Turn
Fuel Cell Confined Space
V-22 Blade Fold
Detachment Coordination
Temporary WC Supervisor
SPOC
Phase Coordinator
Ordnance Pay Differential
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
VX-23 By CLIN
| X003 | VX-23 Shared Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| FFP | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL 0 0
| X016 | F/A-18 Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X017 | EA-6B Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
Total
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
TPS
| TPS Hangar 110 | Labor Source | Entity | TOTAL FOR ALL YEARS | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | RATIONALE | ||||||||||||||||
| SHIFT | DX | NX | MX | CLIN(S) | CBA/DOL Professional | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | Include changes from year to year |
SHOP/Labor Category
Total 0 0 0
| Premium Pay | Full Time Equivalents (FTE) | ||||
| Category | DX | NX | MX | WEEKEND | Rational |
| Aircrew Premium 1 |
Aircrew Premuim 2
Shipboard
Engine Turn/APU Qualifier
CDI/CDQAR
Plane Captain
Aircraft Engine Turn
Fuel Cell Confined Space
V-22 Blade Fold
Detachment Coordination
Temporary WC Supervisor
SPOC
Phase Coordinator
Ordnance Pay Differential
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
TPS By CLIN
| X005 | USNTPS Shared Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| FFP | Firm | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
| X029 | USNTPS Maintenance Labor | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| CPFF | Firm | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
Total
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
NTWL SUPPORT
| NTWL SUPPORT Hangar 301/B507 | Labor Source | Entity | TOTAL FOR ALL YEARS | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | RATIONALE | ||||||||||||||||
| SHIFT | DX | NX | MX | CLIN(S) | CBA/DOL Professional | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | Include changes from year to year |
SHOP/Labor Category
Total 0 0 0
| Premium Pay | Full Time Equivalents (FTE) | ||||
| Category | DX | NX | MX | WEEKEND | Rational |
| Aircrew Premium 1 |
Aircrew Premuim 2
Shipboard
Engine Turn/APU Qualifier
CDI/CDQAR
Plane Captain
Aircraft Engine Turn
Fuel Cell Confined Space
V-22 Blade Fold
Detachment Coordination
Temporary WC Supervisor
SPOC
Phase Coordinator
Ordnance Pay Differential
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
NTWL Support By CLIN
| X006 | NTWL Program Support | Total for All Years | BASE PERIOD | OPTION PERIOD 1 | OPTION PERIOD 2 | OPTION PERIOD 3 | OPTION PERIOD 4 | |||||||||||||
| FFP | Entity | FTE | Productive Hours | Total | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | FTE | Productive Hours | Total Hours | |
| Day Check | Labor Category 1 | |||||||||||||||||||
| Labor Category 2 |
| Swing Check | Labor Category 1 |
| Labor Category 2 |
| Mid Check | Labor Category 1 |
| Labor Category 2 |
| Weekend | Labor Category 1 |
| Labor Category 2 |
TOTAL
Attachment J: P-3 Volume 2 Table T-2 Manning Solicitation # N00421-15-R-0044
Sheet1
File details come from the government source that posted it. Updated .