Att_P-10_Vol_5_NPE_CS_20151009.xls
XLS spreadsheet 877 KB Posted
- Attached to
- Naval Test Wing Atlantic (NTWL) Federal contract opportunity
- Solicitation number
- N00421-15-R-0044
About this file
Att P-10 Vol 5 NPE CS 20151009
View the file
Other files for this federal contract opportunity
Show all 50
Naval Test Wing Atlantic (NTWL) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| 1) Gray shading indicates cells where no data or formulae is expected. Example data entered in red italics and should be deleted by offeror. |
| 2) Provide contractor labor categories and FTE, Productive Hours, and Priced Hours from Manning Attachment P-3 contained in the technical volume. Insert rows as necessary to accommodate all labor categories. Replace the generic titles e.g., Labor category 1) with the specific titles for the proposed labor categories. Ensure Labor category titles are traceable to rates source (e.g., CBA or FPRA). |
| 3) N/A |
| 4) Delete example data and allocate 'Total Labor Cost (for Prime and Subcontractor Labor) and Total Fee (for Prime and Subcontractor Labor) to CPFF CLINS proportionally on the basis of direct labor costs per CLIN. Insert rows as necessary to accomodate subcontracted work. See VX-20 CPFF CLIN Labor Tab for example. |
| 5) Overtime only applies to CPFF CLINS/Tabs. Calculate overtime as 3.5% of "Total Straight Time Labor Cost." See Rows 41-43 of the HX-21 MV-22B CPFF Labor tab as an example. |
| 6) Premium Pay cost should be calculated based on the Premium Pay categories proposed on Attachment P-3 (Vol 2 T-2 Manning) and entered in the designated row for Premium Pay. |
| 7) Shift differential shall be accounted for in the direct labor rate (DL Rate column) proposed for the base and each option period. |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 MV-22B FFP Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X001: HX-21 MV-22B Shared Labor | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X001 | HX-21 MV-22B Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Note 2 | ||||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Subcontracted Firm Fixed Price (FFP) Labor |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 MV-22B CPFF Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| HX-21 MV-22B COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X007 | MV-22B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of total Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Total Subcontractor Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 FFP Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X002: HX-21 SHARED LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X002 | HX-21 Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Note 2 | ||||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Subcontracted Firm Fixed Price (FFP) Labor |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
HX-21 CPFF Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| HX-21 COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X008 | AH-1W Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $2,000,000 | |||||||||||||||||||||||||||||
| X009 | AH-1Z Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $850,000 | |||||||||||||||||||||||||||||
| X010 | UH-1Y Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | Etc. | |||||||||||||||||||||||||||||
| X011 | MH-60R Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X012 | MH-60S Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X013 | MH-60S Maintenance Labor SAR | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X014 | MH-53E Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X015 | TH-57C Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Total Subcontractor Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
VX-23 FFP Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X003: VX-23 SHARED LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X003 | VX-23 Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Note 2 | ||||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Subcontracted Firm Fixed Price (FFP) Labor |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
VX-23 CPFF Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| VX-23 COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X016 | F/A-18 Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X017 | EA-6B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Straight Time Labor Cost) | 2.00% | |||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Total Subcontractor Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVolume 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
VX-20 FFP Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X004: VX-20 SHARED LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X004 | VX-20 Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Subcontracted Firm Fixed Price (FFP) Labor |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
VX-20 CPFF Labor
| ATTACHMENT P-110 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| VX-20 COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X018 | KC-130J Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $2,000,000 | |||||||||||||||||||||||||||||
| X019 | KC-130 R/T Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | $850,000 | |||||||||||||||||||||||||||||
| X020 | E-6B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | Etc. | |||||||||||||||||||||||||||||
| X021 | E-2C Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X022 | E-2D Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X023 | C-2A Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X024 | P-8A Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X025 | P-3C Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X026 | C-38 Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X027 | UC-12B Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| X028 | T-6A Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Total Subcontractor Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
USNTPS FFP Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X005: USNTPS SHARED LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X005 | USNTPS Shared Labor | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Subcontracted Firm Fixed Price (FFP) Labor |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
USNTPS CPFF Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| USNTPS COST PLUS FIXED FEE (CPFF) LABOR | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| CPFF Labor Cost Elements | DL Rate Source | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | |
| Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Note 2 | Note 2 | |||||||||||||||||||||||||||||
| X029 | USNTPS Maintenance Labor | |||||||||||||||||||||||||||||
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Direct Labor Subtotal | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 2 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 2 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Straight Time Labor Cost | ||||||||||||||||||||||||||||||
| Overtime (3.5% of Total Straight Time Labor Cost) | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fixed Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Total Subcontractor Labor Cost Plus Fixed Fee (CPFF) |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
NTWL FFP Labor
| ATTACHMENT P-10 | ||||||||||||||||||||||||||||||
| Non-Prime Entity COST SUMMARY FORMAT | ||||||||||||||||||||||||||||||
| X006: NTWL Program Support | ||||||||||||||||||||||||||||||
| Non-Prime Entity Name: | ||||||||||||||||||||||||||||||
| Total for All Years | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | |||||||||||||||||||||||||
| X006 | NTWL Program Support | Shift | FTE | Priced Hours | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount | FTE | Productive Hours | Priced Hours | DL Rate | Amount |
| Day Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Night Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Mid Check | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Weekend | Labor Category 1 | |||||||||||||||||||||||||||||
| Labor Category 2 | ||||||||||||||||||||||||||||||
| Total Direct Labor Heads/Hours/Cost | ||||||||||||||||||||||||||||||
| Premium Pay | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost plus Premium Pay | ||||||||||||||||||||||||||||||
| Indirect Labor Cost | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | Rate | Base | Amount | |||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Fringe Benefits 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| Overhead 1 | ||||||||||||||||||||||||||||||
| G&A 1 | ||||||||||||||||||||||||||||||
| G&A 2 | ||||||||||||||||||||||||||||||
| Total Indirect Labor Cost | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | ||||||||||||||||||||||||||||||
| COM | ||||||||||||||||||||||||||||||
| Total Labor Cost | ||||||||||||||||||||||||||||||
| Fee | ||||||||||||||||||||||||||||||
| Subcontractor Fee | ||||||||||||||||||||||||||||||
| Total Fee | ||||||||||||||||||||||||||||||
| Subcontracted Firm Fixed Price (FFP) Labor |
&LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044 &LAttachment J: P-10&CVol 5 Non-Prime Entity Cost Summary&RSolicitation # N00421-15-R-0044
Sheet2
Sheet11
File details come from the government source that posted it. Updated .