Attachment_4_Data_Transmittal.doc
DOC document 35 KB Posted
- Attached to
- IDS Technical and Integration Support Services
- Solicitation number
- N00421-15-R-0023
About this file
Data Transmittal Acceptance/Rejection Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00421-15-R-0023-0003.docx | DOCX document | |
| Attachment_P7_Subcontractor_10Aug15.xls | XLS spreadsheet | |
| Attachment_P6_Offeror_10Aug15.xls | XLS spreadsheet | |
| Attachment_2_OCI_(5AUG2015).docx | DOCX document | |
| N00421-15-R-0023-0002.docx | DOCX document | |
| Attachment_2_OCI_(29Jul2015).docx | DOCX document | |
| N00421-15-R-0023-0001.docx | DOCX document | |
| N00421-15-R-0023.docx | DOCX document | |
| Attachment_1_QASP.docx | DOCX document | |
| Attachment_P7_Subcontractor.xls | XLS spreadsheet | |
| Attachment_2_OCI_List.doc | DOC document | |
| Attachment_7_Small_Business_Subcontracting_Plan.doc | DOC document | |
| Exhibit_B_CDRL_Templates.pdf | ||
| Attachment_6_Wage_Determinations.txt | TXT text file | |
| Attachment_8_Issuance_of_Performance_Based_Streamlined_Orders.docx | DOCX document | |
| Attachment_P5_Past_Performance.doc | DOC document | |
| Attachment_5_GFP.pdf | ||
| N00421-15-R-0023.docx | DOCX document | |
| Exhibit_A_CDRLs.pdf | ||
| Attachment_3_DD254.pdf | ||
| Draft_RFP.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
DATA ITEM TRANSMITTAL/ACCEPTANCE/REJECTION FORM
Contract : TBD
CLIN/SLIN: / TITLE:
Block 14 Distribution:
Other:
Doc. Ref. No.: Date:
From:
To: Naval Air Warfare Center Aircraft Division, ADDRESS, ATTN: COR The above detailed CDRL item is forwarded for review and acceptance/ rejection. This item is due . The Government review period is days.
Sincerely, Signature: _____________________________________ Typed Name/Title: ______________________________
ENDORSEMENT: Date Received:
( ) Accepted.
( ) Accepted. Attached comments must be incorporated into the next scheduled submission.
( ) Rejected, comments attached. Change pages ( ) are ( ) not sufficient for correction.
Contractor is allowed ( ) 30 days or ( ) days to resubmit.
Signature:___________________________________________ Typed Name/Title:____________________________________
Code: Date:_______________
Return to Contractor Via: Date:
CC w/Encl.:
CC w/o Encl.:
N00024-10-R-3492 Attachment (10)
File details come from the government source that posted it. Updated .