Attachment_P8_Annual_Fully-Burdened_Labor.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
5. 4. 3 Operations and Maintenance
Solicitation number
N00421-15-R-0012
Issued by

About this file

Attachment P8

View the file

Other files

File Type Posted
N00421-15-R-0012-0003_Amendment_(06-07-2017).docx DOCX document
N00421-15-R-0012-0004_Amendment_(06-13-2017).docx DOCX document
N00421-15-R-0012-0004_Conformed_(06-13-2017).docx DOCX document
N00421-15-R-0012-0001_Amendment_(04-26-2017).docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(06-13-2017).xls XLS spreadsheet
N00421-15-R-0012-0002_Amendment_(05-25-2017).docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(06-12-2017).xls XLS spreadsheet
RFP_N00421-15-R-0012-0004.docx DOCX document
RFP_N00421-15-R-0012-0003.docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(06-07-2017).xls XLS spreadsheet
RFP_N00421-15-R-0012_Industry_Q&A_(06-01-2017).xls XLS spreadsheet
Attachment_(2)_-_Personnel_Qualifications.docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(05-31-2017).xls XLS spreadsheet
Attachment_P6_-_Prime_&_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_(3)_-_Security_Classification_Specification_(DD254).pdf PDF
Attachment_(2)_-_Personnel_Qualifications.docx DOCX document
N00421-15-R-0012-0002.docx DOCX document
Attachment_(6)_-_OCI_List.doc DOC document
Attachment_P6_-_Prime_&_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_P7_-_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_(1)_-_Labor_Categories_and_Requirements.docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(05-25-2017).xls XLS spreadsheet
Industry_QA_(05-11-2017)_-.xlsx XLSX spreadsheet
Attachment_(5)_CDRL_A002_Format.xlsx XLSX spreadsheet
Attachment_(1)_Labor_Categories_and_Requirements.pdf PDF
Attachment_(3)_Security_Classification_Specification_(DD254).pdf PDF
Attachment_(7)_Quality_Assurance_Surveillance_Plan_(QASP).docx DOCX document
Attachment_(12)_Manned_Flight_Simulator_GFI.docx DOCX document
CDRL_A004_OPSEC_Plan.pdf PDF
Attachment_P7_Subcontractor_Cost_Breakout.xls XLS spreadsheet
Attachment_(9)_Government_Furnished_Property.pdf PDF
CDRL_A006_Incurred_Cost_and_Progress_Reporting_for_Services.pdf PDF
CDRL_A005_Tech_Reports_and_Documentation.pdf PDF
Attachment_(2)_Personnel_Qualifications.pdf PDF
Attachment_P3_Past_Performance_Information_Form.pdf PDF
CDRL_A002_Monthly_Project_Financial_Summ.pdf PDF
Attachment_P5_Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Attachment_(4)_CDRL_A001_Format.xlsx XLSX spreadsheet
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_(11)_Wage_Determinations_15-2103.pdf PDF
Attachment_P6_Prime_and_Subcontractor_Cost_Breakout.xls XLS spreadsheet
CDRL_A003_Monthly_Progress_Report.pdf PDF
RFP_N00421-15-R-0012.docx DOCX document
CDRL_A001_Monthly_Financial_Summary.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions to Prime Contractors for completing Attachment P8 Annual Fully Burdened Labor

RFP # N00421-15-R-0012

COLUMN/AREACOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
AOfferor NameEnter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies
CProposed Labor Category (Furnished by Government)Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA".
DIndividual Designator*For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on Attachment XX.
E-IProposed Annual Fully-Burdened Labor per Labor Catergory, per Labor Individual DesignatorEnter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period.

Prime Burdened Labor Rates

Offeror NameATTACHMENT XIndividual Designator*Proposed Annual Fully-Burdened Labor
Proposed Labor CategoryYear 1Year 2Year 3Year 4Year 5
Program Manager
Engineer/Scientist IV (KEY)
Engineer/Scientist II
Engineer/Scientist I
Engineering/Electronics Technician, Senior (KEY)
Engineering/Electronics Technician, Junior
Data Specialist
Computer Specialist

File details come from the government source that posted it. Updated .