Attachment_(12)_Manned_Flight_Simulator_GFI.docx

DOCX document 21 KB Posted

Attached to
5. 4. 3 Operations and Maintenance
Solicitation number
N00421-15-R-0012
Issued by

About this file

Attachment 12

View the file

Other files

File Type Posted
N00421-15-R-0012-0002_Amendment_(05-25-2017).docx DOCX document
N00421-15-R-0012-0001_Amendment_(04-26-2017).docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(06-13-2017).xls XLS spreadsheet
N00421-15-R-0012-0003_Amendment_(06-07-2017).docx DOCX document
N00421-15-R-0012-0004_Conformed_(06-13-2017).docx DOCX document
N00421-15-R-0012-0004_Amendment_(06-13-2017).docx DOCX document
RFP_N00421-15-R-0012-0004.docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(06-12-2017).xls XLS spreadsheet
RFP_N00421-15-R-0012_Industry_Q&A_(06-07-2017).xls XLS spreadsheet
RFP_N00421-15-R-0012-0003.docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(06-01-2017).xls XLS spreadsheet
RFP_N00421-15-R-0012_Industry_Q&A_(05-31-2017).xls XLS spreadsheet
Attachment_P6_-_Prime_&_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_(2)_-_Personnel_Qualifications.docx DOCX document
RFP_N00421-15-R-0012_Industry_Q&A_(05-25-2017).xls XLS spreadsheet
Attachment_(2)_-_Personnel_Qualifications.docx DOCX document
Attachment_(3)_-_Security_Classification_Specification_(DD254).pdf PDF
N00421-15-R-0012-0002.docx DOCX document
Attachment_(1)_-_Labor_Categories_and_Requirements.docx DOCX document
Attachment_(6)_-_OCI_List.doc DOC document
Attachment_P6_-_Prime_&_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Attachment_P7_-_Subcontractor_Cost_Breakout_Spreadsheet.xls XLS spreadsheet
Industry_QA_(05-11-2017)_-.xlsx XLSX spreadsheet
RFP_N00421-15-R-0012.docx DOCX document
CDRL_A003_Monthly_Progress_Report.pdf PDF
Attachment_P8_Annual_Fully-Burdened_Labor.xlsx XLSX spreadsheet
CDRL_A001_Monthly_Financial_Summary.pdf PDF
Attachment_P6_Prime_and_Subcontractor_Cost_Breakout.xls XLS spreadsheet
Attachment_(11)_Wage_Determinations_15-2103.pdf PDF
Attachment_P7_Subcontractor_Cost_Breakout.xls XLS spreadsheet
Attachment_(7)_Quality_Assurance_Surveillance_Plan_(QASP).docx DOCX document
CDRL_A005_Tech_Reports_and_Documentation.pdf PDF
CDRL_A002_Monthly_Project_Financial_Summ.pdf PDF
Attachment_(4)_CDRL_A001_Format.xlsx XLSX spreadsheet
Attachment_P4_Past_Performance_Matrix.doc DOC document
Attachment_(5)_CDRL_A002_Format.xlsx XLSX spreadsheet
Attachment_(3)_Security_Classification_Specification_(DD254).pdf PDF
Attachment_(1)_Labor_Categories_and_Requirements.pdf PDF
CDRL_A004_OPSEC_Plan.pdf PDF
Attachment_(9)_Government_Furnished_Property.pdf PDF
CDRL_A006_Incurred_Cost_and_Progress_Reporting_for_Services.pdf PDF
Attachment_P3_Past_Performance_Information_Form.pdf PDF
Attachment_(2)_Personnel_Qualifications.pdf PDF
Attachment_P5_Contractor_Performance_Assessment_Questionnaire_(CPAQ).pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5.4.3 Operations and Maintenance 2017-03-14

Government-Furnished Information (GFI) Manned Flight Simulator (MFS) Laboratory Operations Attachment (12)

Annual lab usage is anticipated to be approximately 5,000 customer simulation flight hours and 5,000 development flight hours. After system configuration and startup, lab operations support is required during simulation operation approximately 5-15% of the time, including support for tours. MFS laboratory infrastructure currently includes:

· 8 laboratory simulation stations:

· 7 of which have out-the-window (OTW) visual display systems (VDS),

· 1 of which is on a 6-DOF motion platform,

· 1 of which has multiple operator stations,

· 8 mobile aircraft cockpits,

· 9 OTW and 2 sensor image generation systems, and

· Avionics racks, support equipment, and simulation systems including audio, video distribution, and shared memory systems.

Lab stations and aircraft cockpits have standard electrical and mechanical interfaces so that the mobile aircraft cockpits (weighing 3000-5000 lbs.) can be moved between lab stations to optimize available resources. Test and development sessions using laboratory resources are scheduled in an online scheduling system. Laboratory operations pre-event support includes movement of the aircraft cockpits to their scheduled location, connection of the cockpits and supporting equipment, configuration and initialization of the image generator, and startup and initialization of laboratory station and simulation system equipment. Simulation event support includes providing technical assistance to project engineers as required to ensure simulation systems are operational and operating simulations for tours and as required for project test events.

File details come from the government source that posted it. Updated .