Technical Exhibit 9 System Engineering Projects

View the file

Other files

File Type Posted
N00421-11-R-0066-0004.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_20_Feb_2014.xls XLS spreadsheet
Incurred_Cost_CDRL.pdf PDF
N00421-11-R-0066-0003.doc DOC document
N00421-11-R-0066-0003_Attachment_(6)_Incurred_Cost_and_Progress_Reporting_CDRL.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_P2_Workforce_Qualifications_rev1.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_2TL_-_Labor_Categories__Hours_Worksheet_18_Oct_2013.xls XLS spreadsheet
08062013_Q A.xlsx XLSX spreadsheet
N00421-11-R-0066-0002.doc DOC document
07182013_Q A.xlsx XLSX spreadsheet
Attachment_P5_PP_Contract_Data.xlsx XLSX spreadsheet
N00421-11-R-0066-0001.doc DOC document
Amendment_0001_Final_Q As.xlsx XLSX spreadsheet
07102013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
Attachment_P2_Workforce_Qualifications.xlsx XLSX spreadsheet
Attachment_P3_Workforce_Hour_Matrix.xlsx XLSX spreadsheet
CDRLs_2829.pdf PDF
CDRLs_131415.pdf PDF
TE4_Acronym_List.doc DOC document
TE5_ATR__ATMO_Operational_Workload_Information.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_2_July_2013.xls XLS spreadsheet
TE2_ATMO_Equipmemt_Distribution_Matrix.xls XLS spreadsheet
TE7_Overtime_Templates.doc DOC document
06042013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
TE3_ATR_Facilities _Systems _and_Equipment_TOC 1 .docx DOCX document
TE8_Material_and_ODC_Purhase_History.doc DOC document
CDRLs_252627.pdf PDF
CDRLs_123.pdf PDF
CDRLs_456.pdf PDF
CDRLs_192021.pdf PDF
Attachment_P5_Summary_of_Relevant_Past_Performance_Contract_Data.xls XLS spreadsheet
CDRLs_303132.pdf PDF
CDRLs_3637.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet_V6_____20_June_2011_without_CIC.xls XLS spreadsheet
CDRLs_333435.pdf PDF
CDRLs_161718.pdf PDF
Attachment_3_-_Surveillance_Activity_Checklist.docx DOCX document
Attachment_P1_Relevant_Contract_Table.xlsx XLSX spreadsheet
CDRLs_789.pdf PDF
TE1_ATMO_Facility_ _Equipment_Descriptions.doc DOC document
TE6_Budget_Tracking_Managment_Sample.xlsx XLSX spreadsheet
Attachment_5_DD254.pdf PDF
Attachment_P4_Past_Performance_Questionnaire.docx DOCX document
N00421-11-R-0066_3_Jul_13.doc DOC document
CDRLs_222324.pdf PDF
TE10_ATR-ATMO_Staffing_Information.xlsx XLSX spreadsheet
CDRLs_101112.pdf PDF
Final_Industry_Q_and_A.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT TE9

ATR SYSTEM ENGINEERING PROJECTS

The AD Spectrum Reallocation project will provide enhanced telemetry coverage around the runway and tarmac areas and in Chesapeake Test Range and the Atlantic Warning Areas airspace. This project will develop and implement a multi-band L-, S- and C-band capability in the telemetry acquisition pedestals. The Spectrum Reallocation project has prototyped and evaluated the performance of multi-band pedestal units, in particular, performance of telemetry in C-band. Data encapsulation techniques have been developed to support the implementation of a best source selection capability to provide enhanced data availability. The project will expand telemetry operations into C-band and enhance telemetry data availability, spectrum utilization efficiency and system reliability.

The Multiple-target Instrumentation Radar (MIR) Modernization project will improve system reliability by replacing obsolete subsystems and significantly enhance the radar’s tracking ability by using state-of-the-art digital signal processing and implementing an enhanced RF power management capability. This major overhaul of the MIR will include replacing major subsystem components to eliminate obsolescence in the radar. The overhaul of the pedestal was initiated with replacement of obsolete electronics (ACU, servo amps, synchro digital converter, etc.).

The ARDS Sustainment project will extend the life of the ARDS system until the Common Range Integrated Instrumentation System (CRIIS) can be deployed on NAVAIR Ranges in FY16. This project procured form, fit, function components to replace obsolete units in the ARDS pods and will replace the data link ground systems at the West Coast NRC ranges.

The Pax to Wallops Fiber Network Expansion project will provide an optical network with 96 fibers in a stand-alone conduit, from the NASA Wallops Flight Facility in Virginia to NAS Patuxent River. The fiber link will provide the enhanced bandwidth to meet current and future data, voice and video communication needs between the sites.

The Bay Fiber Replacement project will install new fiber to the down range instrumentation sites and extend fiber communications to the Webster Field Annex (WFA).

The Patuxent River IR Signature Measurement Improvements project improved the data acquisition capability by acquiring a second KTM and upgrading the digital control systems on the current trackers. The ability to measure fast moving targets has been accomplished with imager upgrades with increased frame rates and dynamic range, and the purchase of multi-field-of-view optics. Data processing times have been decreased with added storage/networking hardware, enabling simultaneous processing of two classified datasets.

The RIR-778 SLEP will refurbish Radars 16 and 17 by replacing the obsolete components in the radar, including the optics, receiver and console in the system. Engineering development will be performed in FY12 and FY13.

ATR received an additional $750K in FY11 for a Flight Termination System (FTS) to support off-shore missile shots for F-18 and JSF. The FTS will have the enhanced digital capability that provides an extended degree of communication reliability between the target and ground control.

The Video Instrumentation Project will provide HD cameras for the KTM instrumentation mounts and replace the core video routing, editing and display capability. The HD cameras are being purchased in FY12. The core video routing infrastructure will be replaced in FY13 and FY14. The new video infrastructure will support the new digital HD video and high resolution PC graphics formats, which are not supported by the current video infrastructure.

Rev Date: May 9, 2013