About this file

Amendment 0003

View the file

Other files

File Type Posted
N00421-11-R-0066-0004.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_20_Feb_2014.xls XLS spreadsheet
Incurred_Cost_CDRL.pdf PDF
N00421-11-R-0066-0003_Attachment_(6)_Incurred_Cost_and_Progress_Reporting_CDRL.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_P2_Workforce_Qualifications_rev1.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_2TL_-_Labor_Categories__Hours_Worksheet_18_Oct_2013.xls XLS spreadsheet
08062013_Q A.xlsx XLSX spreadsheet
N00421-11-R-0066-0002.doc DOC document
07182013_Q A.xlsx XLSX spreadsheet
Attachment_P5_PP_Contract_Data.xlsx XLSX spreadsheet
N00421-11-R-0066-0001.doc DOC document
Amendment_0001_Final_Q As.xlsx XLSX spreadsheet
07102013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
Attachment_P2_Workforce_Qualifications.xlsx XLSX spreadsheet
Attachment_P3_Workforce_Hour_Matrix.xlsx XLSX spreadsheet
CDRLs_2829.pdf PDF
CDRLs_131415.pdf PDF
TE4_Acronym_List.doc DOC document
TE5_ATR__ATMO_Operational_Workload_Information.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_2_July_2013.xls XLS spreadsheet
TE2_ATMO_Equipmemt_Distribution_Matrix.xls XLS spreadsheet
TE7_Overtime_Templates.doc DOC document
06042013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
TE3_ATR_Facilities _Systems _and_Equipment_TOC 1 .docx DOCX document
TE8_Material_and_ODC_Purhase_History.doc DOC document
CDRLs_252627.pdf PDF
CDRLs_123.pdf PDF
CDRLs_456.pdf PDF
CDRLs_192021.pdf PDF
Attachment_P5_Summary_of_Relevant_Past_Performance_Contract_Data.xls XLS spreadsheet
CDRLs_303132.pdf PDF
CDRLs_3637.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet_V6_____20_June_2011_without_CIC.xls XLS spreadsheet
CDRLs_333435.pdf PDF
CDRLs_161718.pdf PDF
Attachment_3_-_Surveillance_Activity_Checklist.docx DOCX document
Attachment_P1_Relevant_Contract_Table.xlsx XLSX spreadsheet
TE9_System_Engineering_Projects.doc DOC document
CDRLs_789.pdf PDF
TE1_ATMO_Facility_ _Equipment_Descriptions.doc DOC document
TE6_Budget_Tracking_Managment_Sample.xlsx XLSX spreadsheet
Attachment_5_DD254.pdf PDF
Attachment_P4_Past_Performance_Questionnaire.docx DOCX document
N00421-11-R-0066_3_Jul_13.doc DOC document
CDRLs_222324.pdf PDF
TE10_ATR-ATMO_Staffing_Information.xlsx XLSX spreadsheet
CDRLs_101112.pdf PDF
Final_Industry_Q_and_A.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

INCURRED COST CDRL

Incurred Cost and Progress Reporting

In order to support invoice reviews conducted as part of proper surveillance, the Contractor shall report incurred cost and progress in accordance with NAVAIR clause 5252.232-9529, “Incurred cost and Progress Reporting for Services,” CDRL A036, and contract Attachment 6.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.251-2
Interagency Fleet Management System (IFMS) Vehicles And Related Services
JAN 1991

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

Attachment 1 – Statement of Work (SOW)

Attachment 2 – Labor Categories & Hours Worksheet

Attachment 3 – Surveillance Activity Checklist

Attachment 4 – Department of Labor (DOL) Wage Determinations #’s: (WDs 05-2017, Rev 16; 05-2104, Rev 14; 05-2153, Rev 16; 05-2072, Rev 15; 05-2544, Rev 14; 05-2115, Rev 12; 05-2119, Rev 13). These WDs can be accessed electronically at www.wdol.gov.

Attachment 5 – DD 254

Attachment 6 – Incurred Cost and Progress Reporting CDRL

Attachment P1 – Relevant Contract Table

Attachment P2 – Workforce Qualifications

Attachment P3 – Workforce Hour Matrix

Attachment P4 – Past Performance Questionnaire

Attachment P5 – Summary of Relevant Past Performance Contract Data

Attachment P6 – CLIN Breakout Spreadsheet

Exhibit A – DD 1423, Contract Data Requirement’s List (CDRLS)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

PART A GENERAL INSTRUCTIONS

4.6 Cost/Price Proposal

4.6.1 Complete and submit Section B with your proposal.

4.6.2 The cost/price proposal shall be submitted as a separate file. All cost and/or pricing information shall be contained in Volume 5 only. Offerors shall submit their cost/price proposal utilizing the CLIN Breakout Spreadsheet (Attachment P6). The Offeror shall submit a fully completed Attachment P6. Ensure all responses are complete, consistent and accurate. Attachment P6 shall be consistent with Section B proposed costs.

4.6.2.1 Regardless of the type of CLINs (e.g., CPFF, CPIF, CPAF or FFP) under the solicitation, Offeror shall fully disclose the build up of cost/price of each CLIN.

4.6.2.2 When completing P6, the Offeror, (e.g., prime vendor) shall not utilize any fully burdened hourly rates when pricing the labor of its employees. Offerors shall bid in accordance with their approved accounting system.

4.6.2.3 If a subcontractor of the Offeror utilizes fully burdened rates in its proposal to the prime, the subcontractor shall provide its own P6 delineating the build up of those rates to the Government. Offerors shall not propose unpriced subcontractors.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .