About this file

Amendment 0001

View the file

Other files

File Type Posted
N00421-11-R-0066-0004.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_20_Feb_2014.xls XLS spreadsheet
Incurred_Cost_CDRL.pdf PDF
N00421-11-R-0066-0003.doc DOC document
N00421-11-R-0066-0003_Attachment_(6)_Incurred_Cost_and_Progress_Reporting_CDRL.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_P2_Workforce_Qualifications_rev1.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_2TL_-_Labor_Categories__Hours_Worksheet_18_Oct_2013.xls XLS spreadsheet
08062013_Q A.xlsx XLSX spreadsheet
N00421-11-R-0066-0002.doc DOC document
07182013_Q A.xlsx XLSX spreadsheet
Attachment_P5_PP_Contract_Data.xlsx XLSX spreadsheet
Amendment_0001_Final_Q As.xlsx XLSX spreadsheet
07102013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
Attachment_P2_Workforce_Qualifications.xlsx XLSX spreadsheet
Attachment_P3_Workforce_Hour_Matrix.xlsx XLSX spreadsheet
CDRLs_2829.pdf PDF
CDRLs_131415.pdf PDF
TE4_Acronym_List.doc DOC document
TE5_ATR__ATMO_Operational_Workload_Information.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_2_July_2013.xls XLS spreadsheet
TE2_ATMO_Equipmemt_Distribution_Matrix.xls XLS spreadsheet
TE7_Overtime_Templates.doc DOC document
06042013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
TE3_ATR_Facilities _Systems _and_Equipment_TOC 1 .docx DOCX document
TE8_Material_and_ODC_Purhase_History.doc DOC document
CDRLs_252627.pdf PDF
CDRLs_123.pdf PDF
CDRLs_456.pdf PDF
CDRLs_192021.pdf PDF
Attachment_P5_Summary_of_Relevant_Past_Performance_Contract_Data.xls XLS spreadsheet
CDRLs_303132.pdf PDF
CDRLs_3637.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet_V6_____20_June_2011_without_CIC.xls XLS spreadsheet
CDRLs_333435.pdf PDF
CDRLs_161718.pdf PDF
Attachment_3_-_Surveillance_Activity_Checklist.docx DOCX document
Attachment_P1_Relevant_Contract_Table.xlsx XLSX spreadsheet
TE9_System_Engineering_Projects.doc DOC document
CDRLs_789.pdf PDF
TE1_ATMO_Facility_ _Equipment_Descriptions.doc DOC document
TE6_Budget_Tracking_Managment_Sample.xlsx XLSX spreadsheet
Attachment_5_DD254.pdf PDF
Attachment_P4_Past_Performance_Questionnaire.docx DOCX document
N00421-11-R-0066_3_Jul_13.doc DOC document
CDRLs_222324.pdf PDF
TE10_ATR-ATMO_Staffing_Information.xlsx XLSX spreadsheet
CDRLs_101112.pdf PDF
Final_Industry_Q_and_A.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

The following have been added by full text:

5252.201-9501 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)(SEP 2012) - ALT I (SEP 2012)(NAVAIR)

(a) The Contracting Officer has designated the following as an authorized Contracting Officer's Representatives (COR):

COR 1: [insert name, mailing address, code, and telephone number] to perform the following functions, duties, and/or responsibilities:[insert functions, duties, and/or responsibilities of the COR]

[insert COR 2, COR 3, etc., as necessary, and complete the fill-ins ]

(b) The Contracting Officer has designated the following as an authorized Alternate Contracting Officer's Representatives (ACOR):

ACOR 1: [insert name, mailing address, code, and telephone number] to perform the functions, duties, and/or responsibilities outlined below in the absence of [Insert name of COR(s) for whom the alternate will perform].

ACOR 1 Functions, Duties, and/or Responsibilities:[Insert functions, duties, and/or responsibilities of the ACOR]

[insert COR 2, COR 3, etc., as necessary, and complete the fill-ins]

(c) The effective period of the COR designation is [insert "the period of performance of this contract" OR "from to ." OR include the dates in table format for each COR/ACOR below.]

To be completed at time of award.

The following have been deleted:

5252.201-9501
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)
OCT 1994

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

Attachment 1 – Statement of Work (SOW)

Attachment 2 – Labor Categories & Hours Worksheet

Attachment 3 – Surveillance Activity Checklist

Attachment 4 – Department of Labor (DOL) Wage Determinations #’s: (WDs 05-2017, Rev 16; 05-2104, Rev 14; 05-2153, Rev 16; 05-2072, Rev 15; 05-2544, Rev 14; 05-2115, Rev 12; 05-2119, Rev 13). These WDs can be accessed electronically at www.wdol.gov.

Attachment 5 – DD 254

Attachment P1 – Relevant Contract Table

Attachment P2 – Workforce Qualifications

Attachment P3 – Workforce Hour Matrix

Attachment P4 – Past Performance Questionnaire

Attachment P5 – Summary of Relevant Past Performance Contract Data

Attachment P6 – CLIN Breakout Spreadsheet

Exhibit A – DD 1423, Contract Data Requirement’s List (CDRLS)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

2.0 VOLUME 2 - TECHNICAL

Note: This volume shall not contain any reference to cost or price aspects of the offer.

The following is a list of Section J Attachments that the Offeror shall utilize to provide information for this volume:

Attachment P2 Workforce Qualifications Attachment P3 Workforce Hour Matrix A Government Cross Reference Matrix (CRM) is provided below to help the Offeror ensure that all requirements are addressed, are easily accessible to the evaluators, and to aid in ensuring accurate format and mapping of the CRM to its proposal. The Offeror is required to provide a CRM for the Technical Volume only. The Offeror’s CRM’s shall cross-reference its proposal volume, page and paragraph to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The CRM provided in the Technical proposal volume is not included in the suggested page count. The Offeror’s Technical CRM may be identical to the one provided below or revised to add columns to indicate the page number on which information may be found or to provide other comments.

Table T.1. Cross Reference Matrix

Section L – Proposal Instructions
SOW
Proposal Reference

2.0 Vol. 2 Technical

2.1 Personnel and Staffing
3.1.8, 3.1.10, 3.2.4, 3.3.1.4, 3.3.7
2.1.1 Personnel Certification/Qualification
3.3.3
2.1.2 Personnel Staffing of Support Vessels and Targets
3.2.2, 3.2.4
2.2 Program Management
3.3.4
2.3 Technical Capabilities
3.1, 3.2
2.3.1 Technology /Systems/Process Upgrade Capability
3.1.26
2.3.2 Operations & Maintenance of ATR
3.1
2.3.3 Material and ODC Purchases
3.3.5
2.3.4Marine Engineering/Naval Architectural Service Capabilities
3.2.4
2.3.5 Target and Vessel Maintenance
3.2.2, 3.2.3, 3.2.4, 3.2.6, 3.2.7, 3.3.2
2.4 Transition Plan
N/A
2.5 Small Business
N/A
2.5.1 Small Business Utilization Strategy
N/A
2.5.2 Small Business Sub-Contracting
N/A

Throughout the Technical Volume the Offeror should identify any capability, approach or feature that is being proposed as exceeding a requirement or provides merit associated with a performance or operational benefit to the Government or being proposed as reducing risk inherent in the program. Specifically, explain the benefits to the Government in technical terms and the degree of impact it will have to performance, operations and/or risk. Appreciably exceeding requirements that are expressed as a minimum or threshold requirement can potentially produce performance or operational benefits. Beyond the point where there is performance or operational benefit, there may be risk reduction benefits. Additionally, a proposal that provides the Government with a capability, service or resource that is not specifically required, but benefits the Government can have merit if it appreciably enhances performance and/or operations to benefit the Government. Offerors are advised that any offer to exceed a requirement or to provide a feature with performance and/or operational benefits may be included in the resulting applicable Contract within the proposed price.

2.1 Personnel and Staffing

The Offeror shall describe their staffing approach for performing all the operations, maintenance and development SOW tasking listed in table T1.Cross Reference Matrix. The staffing approach should include, but not be limited to, identifying which tasks will be performed by the Prime contractor and which tasks will be performed by Subcontractors and describe why this staffing approach would best meet the technical requirements in an effective and efficient manner. In addition, the staffing approach should describe how the offeror would support dynamic operational and maintenance task requirements outside normal working hours and during remote deployments.

End Summary of Changes

File details come from the government source that posted it. Updated .