Technical Exhibit 5 ATR ATMO Operational Workload Information

View the file

Other files

File Type Posted
N00421-11-R-0066-0004.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_20_Feb_2014.xls XLS spreadsheet
Incurred_Cost_CDRL.pdf PDF
N00421-11-R-0066-0003.doc DOC document
N00421-11-R-0066-0003_Attachment_(6)_Incurred_Cost_and_Progress_Reporting_CDRL.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_P2_Workforce_Qualifications_rev1.xlsx XLSX spreadsheet
N00421-11-R-0066-0003_Attachment_2TL_-_Labor_Categories__Hours_Worksheet_18_Oct_2013.xls XLS spreadsheet
08062013_Q A.xlsx XLSX spreadsheet
N00421-11-R-0066-0002.doc DOC document
07182013_Q A.xlsx XLSX spreadsheet
Attachment_P5_PP_Contract_Data.xlsx XLSX spreadsheet
N00421-11-R-0066-0001.doc DOC document
Amendment_0001_Final_Q As.xlsx XLSX spreadsheet
07102013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
Attachment_P2_Workforce_Qualifications.xlsx XLSX spreadsheet
Attachment_P3_Workforce_Hour_Matrix.xlsx XLSX spreadsheet
CDRLs_2829.pdf PDF
CDRLs_131415.pdf PDF
TE4_Acronym_List.doc DOC document
Attachment_2_-_Labor_Categories_ _Hours_Worksheet_2_July_2013.xls XLS spreadsheet
TE2_ATMO_Equipmemt_Distribution_Matrix.xls XLS spreadsheet
TE7_Overtime_Templates.doc DOC document
06042013_Attachment_1_-_Statement_of_Work_(SOW).docx DOCX document
TE3_ATR_Facilities _Systems _and_Equipment_TOC 1 .docx DOCX document
TE8_Material_and_ODC_Purhase_History.doc DOC document
CDRLs_252627.pdf PDF
CDRLs_123.pdf PDF
CDRLs_456.pdf PDF
CDRLs_192021.pdf PDF
Attachment_P5_Summary_of_Relevant_Past_Performance_Contract_Data.xls XLS spreadsheet
CDRLs_303132.pdf PDF
CDRLs_3637.pdf PDF
Attachment_P6_CLIN_Breakout_spreadsheet_V6_____20_June_2011_without_CIC.xls XLS spreadsheet
CDRLs_333435.pdf PDF
CDRLs_161718.pdf PDF
Attachment_3_-_Surveillance_Activity_Checklist.docx DOCX document
Attachment_P1_Relevant_Contract_Table.xlsx XLSX spreadsheet
TE9_System_Engineering_Projects.doc DOC document
CDRLs_789.pdf PDF
TE1_ATMO_Facility_ _Equipment_Descriptions.doc DOC document
TE6_Budget_Tracking_Managment_Sample.xlsx XLSX spreadsheet
Attachment_5_DD254.pdf PDF
Attachment_P4_Past_Performance_Questionnaire.docx DOCX document
N00421-11-R-0066_3_Jul_13.doc DOC document
CDRLs_222324.pdf PDF
TE10_ATR-ATMO_Staffing_Information.xlsx XLSX spreadsheet
CDRLs_101112.pdf PDF
Final_Industry_Q_and_A.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5 (TE5)

ATR & ATMO OPERATIONAL WORKLOAD INFORMATION

1. Atlantic Targets and Marine Operations Division (ATMO) Workload AUTEC deployment is cyclic, and some periods are longer than others. On average, the contractor can plan on three deployments per year, with approximately 30 days per deployment. Deployment to Mayport, FL is also cyclic, based on the number of C2X and JTFX events. On average, the contractor can plan on 5 events, with approximately 30 days per days per event.

ATMO AN/ALQ-167 Pod Support (Option CLIN)

The contractor maintenance support at Oceana, VA shall be capable of performing troubleshooting and fault isolation on F/A-18 aircraft at the organizational/intermediate (O/I) level of maintenance. The O level preventative maintenance is a visual inspection of the pod exterior. It can be performed in roughly 30 minutes. The I level maintenance is a visual inspection of both the pod interior and exterior. It can be performed in roughly 1.5 hrs with two people. There is no destructive or non-destructive testing. Although there may be up to 18 F-5 aircraft, there are only two internal electronic attack systems planned for Key West. Also, although there may be up to 12 F/A-18 aircraft, there are only six ALQ-167 pods planned for Oceana. The F/A-18 aircraft are A+ models. F/A-18 sorties per month are estimated as 20 per pod (6 pods total). F-5 sorties per month are estimated as 10 per system (2 systems total). Assume each sortie is one hour duration (240hrs for the F/A-18 and 120 hrs for the F-5). 2 technicians will require approximately 3 hours aligning the system. Any travel involved with supporting pod work will be performed and reimbursed consistent with the travel guidelines and clauses of the RFP.

2. Atlantic Test Ranges (ATR) Workload ATR is responsible for providing range assets and services in support of Research, Development, Test and Evaluation (RDT&E) for the Naval Aviation Enterprise. Additionally, ATR provides support to other DoD and federal agencies as well as commercial and international partners. The assets and services provided vary from positive airspace control in designated warning and restricted areas, to high-rate data delivery (telemetry) and voice communications, basic and advanced data processing and display, radio frequency management, and Time, Space, Position Information (TSPI) of tracked air vehicles, vessels and other objects, such as ordnance.

The open-air range and ground test facilities developed for RDT&E also have tremendous applications for fleet and warfighter pre-deployment systems grooming and readiness training exercises. ATR coordinates training events in airspace at ATR and at sites around the country. Carrier Strike Groups (CSGs) and Expeditionary Strike Groups (ESGs) are routinely supported – from small, unit-level events to large-scale, joint exercises.

FY11 WORKLOAD

ATR experienced an anticipated increase in workload in FY11, primarily due to the arrival and ramp-up of ACAT-1 programs at NAS Patuxent River and testing of new naval technologies, such as the Electromagnetic Aircraft Launch System (EMALS) at Lakehurst, N.J.; and other remote testing, including Carrier Suitability/Precision Aircraft Landing System (PALS) qualifications and foreign support.

The number of test events supported in FY11 increased by 34 percent from FY10 and 30 percent from the FY06-FY09 average. Range hours supported increased by 102 percent from FY10 and 45 percent from the FY06-FY09 average.

In FY11, ATR’s Offshore Military Unit (MRU) successfully completed Biennial Certification conducted by Fleet Area Control and Surveillance Facility, Virginia Capes (FACSFAC VACAPES) and FAA Air Traffic representatives.

FY11 Scheduled Events/Hours Test Events Completed 2,534

Test Hours Completed 17,562 Completed Test Event Trends

FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
1,377
1,756
2,145
1,700
1,459
1,679
1,924
2,534

FY11 Remote Operations Number of FY11 remote operations:

Man-days spent away from ATR supporting remote operations:

1,802

During fiscal year 2011, ATR supported a variety of test and evaluation missions, training events and special projects in and around the Patuxent River Complex and special use airspace as well as at remote sites around the country and across the world.

FY10 WORKLOAD

A higher volume of flight testing was experienced in 2010 at ATR is due to the long-anticipated “test flight surge.” With the recent arrival of Major Acquisition Category 1 (ACAT-1) programs at Patuxent River, ATR has stepped up to meet the challenge of accommodating these test flights. By May 2010, ATR was routinely conducting up to 13 missions on nine distinct aircraft in a single day; in August, ATR supported simultaneous missions using all nine Project Engineer Stations with three aircraft performing flight testing at the same time.

ATR routinely supports missions that take place away from the Patuxent River complex with both personnel and mobile equipment. The majority of FY10 remote operations were in support of the aircraft program at the contractor’s site in Seattle, Wash.; Operation Red Flag at the Pacific Alaska Range Complex (PARC), Eielson Air Force Base, Alaska; Ship Suitability testing aboard USS Wasp (LDH 1); and Precision Aircraft Landing System (PALS) certification missions aboard various aircraft carriers operating in the Atlantic and Pacific oceans.

FY10 Scheduled Events/Hours

Test Events Scheduled
4,618
Test Hours Scheduled
17,581
Test Events Completed
1,924
Test Hours Completed
8,740

FY10 Completed Test Event Trends

FY04
FY05
FY06
FY07
FY08
FY09
FY10
1,377
1,756
2,145
1,700
1,459
1,679
1,924

FY10 Remote Operations

Number of FY10 remote operations
102
Man-days spent away from ATR supporting remote operations
2,118

FY09 OPERATIONS

Test Events Scheduled
3,739
Test Hours Scheduled
14,136
Test Events Completed
1,679
Test Hours Completed
7,947
Remote Operations Supported
340
Total man-days spent away from ATR

on Remote Operations 1,599

Rev Date: May 9, 2013