Attachment 4 - QASP
View the file
Other files for this federal contract opportunity
Show all 50
Air Vehicle Modification and Instrumentation (AVMI) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-11-R-0055 Attachment 4 N00421-11-R-0055 MOPAS2 Attachment 1
Quality Assurance Surveillance Plan (QASP)
Technical Support Services for Air Vehicle Modification and Instrumentation Department
1.
Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the performance based service order. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the order.
The contractor shall provide technical services to support the mission of the Air Vehicle Modification and Instrumentation Facility of the NAVAIR Range Department (5.2) This required support provides services in support of the designing, developing, procuring, building, installing, testing and evaluating, calibrating, modifying, operating and maintaining instrumentation on aircraft and engines for the Navy and other government, commercial and foreign government customers. AVMI is the lead for developing future network-based data acquisition systems and provides technical consultation to NAVAIRSYSCOM, OPNAV, DOD, contractors, field activities and other government agencies. AVMI performs engineering design, technology investigations, and responsive development to support RDT&E and fleet requirements for instrumentation.
In addition AVMI is responsible for performing electrical and mechanical modifications to test vehicles to support test and evaluation. A major aspect of this responsibility is the design, development, procurement, fabrication, installation, test, evaluation, configuration, operation and maintenance of special flight test instrumentation for flight test aircraft, weapons under test and aircraft engines undergoing uninstalled tests.
The resulting vehicle will be a single award contract. The performance-based order contain cost-plus-fixed-fee (CPFF) labor CLINs, and cost-reimbursable CLINs for travel and material. The order will be for a base year with four one year option. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
2.
Authority
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in task orders, to be executed by the Contracting Officer or a duly authorized representative.
3.
Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the order.
The QASP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the order.
4.
Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is Melisha Y. Proctor, AIR-2.5.1.7. The ACO will be designated in the resulting order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting task order. The limitations of authority are contained in a written letter of appointment.
5.
Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance
Contracting Officer Representative– The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
6.
Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS) – The current “Range Contract, N00178-05-D-4030 Task Order M801 is being separated into two (2) separate awards. This requirement is to provide follow-on support for the AVMI tasking.The CPARS ratings will be the determinant in exercising an option or award term. For this procurement the Government will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the order, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
b.
QASP - The below listed methods of surveillance will be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist.
7.
Surveillance
Enclosures (1), (2), and (3) set forth the performance standards, incentives, and surveillance methods for the contractor and COR while enclosure (4) provides the checklist and means for the COR to document the results of the surveillance. Enclosure (4) will be provided to the Contracting Officer on a quarterly basis.
8.
Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the order. The COR shall forward these records to the Contracting Officer at termination or completion of the order.
9.
Enclosures
Enclosure (1) – Air Vehicle Modification and Instrumentation Enclosure (2) - Data Performance Standards
Enclosure (3) - Evaluations Enclosure (3) - Surveillance Activity Checklist
PERFORMANCE-BASED QUALITY STANDARDS
TECHNICAL SUPPORT SERVICES
Air Vehicle Modification and Instrumentation Facility
Air Vehicle Modification and Instrumentation Performance Statements
| Description |
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance Method/Measure |
| Incentives |
| Provide Safe and Reliable prototype aircraft and instrumentation modifications on schedule, on budget, as estimated |
| 100% Safe and reliable integrations. Clearly communicated deviations in schedule, budget, or manpower, due to customer change requests. |
| Government Observation, COR review of (Safety & Quality Assurance) Schedule updates, estimate revisions. Customer feedback monthly |
| See enclosure 3. |
| Provide calibrated and properly functioning strain gages and test fixtures |
| 100% of installations are safe, calibrated and installed properly. |
| Government observation, COR review of supplied documentation and customer feedback, monthly. |
| See enclosure 3. |
| Provide instrumentation engineering expertise required to provide an installed instrumentation system |
| 100% Safe and reliable instrumentation or imaging systems. Clearly communicated deviations in schedule, budget, or manpower, due to customer change requests. |
| Government Observation, COR review of (Safety & Quality Assurance) Schedule updates, estimate revisions. Customer feedback, monthly. |
| See enclosure 3. |
| Provide “On-Time” / On schedule, accurate instrumentation Operational services, w/ RFI “Safe for Flight” airworthy data system |
| 100% “On-Time” / on schedule. “At-the-ready” repair and technical troubleshooting capability in support of flight scheduled events. |
| Government observation |
Flight schedule feedback
Customer feedback, monthly See enclosure 3.
| Provide timely and responsive support for inventory data-calls, reports and responsive support for inventory physical actions. |
| Inventory Tracking documentation is accurate and complete and inventory actions are performed 98% of the time. |
Government observation and submitted document review, monthly
See enclosure 3.
| Maintain AVMI’s inventory and status |
| Have hardware, material and tooling on hand as required to meet 98% of requirements. |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
| Provide documentation and engineering drawing products |
| Meet MSD drawing standards requirements 100% of the time |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
| Provide innovative and rapid response to unique and unconventional prototyping requirements |
| Meet NAVAIR airworthiness, safety and quality standards 100% of the time and complete by assigned due date |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
| Maintain APSD’s inventory and status |
| Have hardware, material and tooling on hand as required to meet 98% of requirements. |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
| Provide rapid cost effective manufacture of aircraft modification hardware |
| Meet NAVAIR airworthiness, safety, and quality standards 100% of the time and complete by assigned due date |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
| Provide rapid cost effective Modification/ reconfiguration of Naval Aircraft |
| Meet NAVAIR airworthiness, safety, and quality standards 100% of the time and complete by assigned due date |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
| Maintain CAD/CAM capability to effect rapid cost effective design of prototype aircraft modifications |
| CAD/CAM system will be available 99% of the time for MSD CAD users |
| Government observation and submitted document review, monthly |
| See enclosure 3. |
DATA PERFORMANCE STANDARDS
| Description |
| Standard |
| AQL |
| Surveillance |
Method/
Measure Incentives
| Funds Expenditure Report |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR. |
See enclosure 3.
| Accident/Incident Report |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR. |
See enclosure 3.
| Contractor Inventory |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR. |
See enclosure 3.
| Contractor Personnel Clearance Request/ Report |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR. |
See enclosure 3.
| Personnel Locator |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR. |
See enclosure 3.
Evaluations
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
Incentives
Base and Option 1:
Not more than 2 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below” Marginal”.
See below.
| CPARS annual evaluations |
| (+) Meet the acceptable performance definition as a condition for exercise of an option.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of an option.*
Option 2 thru 4:
Not more than 2 of the measurement areas rated below “Very Good”. Not more than 1 of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below” Marginal”.
See below.
| CPARS annual evaluations |
| (+) Meet the acceptable performance definition as a condition for exercise of an option.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of an award term.*
*The Government may not exercise any option unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Utilization of Small Business – FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requiremetns for complying with the Small Business Subcontracting Program. Assess whether thecontractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled Veteran Owned Small Business, Historically Black Colleges and Minority Institutions and ANCs and Idiean Tribes that are not Small Disadvantaged Businesses or Small Business) to participate in contract peformance consistent with efficient performance of the contract.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
SURVEILLANCE ACTIVITY CHECKLIST
Monthly Surveillance:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt. |
Sm Bus Other
| Provide Safe and Reliable prototype aircraft and instrumentation modifications on schedule, on budget, as estimated |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Provide calibrated and properly functioning strain gages and test fixtures |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Provide instrumentation engineering expertise required to provide an installed instrumentation system |
| 100% Inspection by COR and customer feedback. |
TBD
| Provide timely and responsive support for inventory data-calls, reports and responsive support for inventory physical actions. |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Maintain AVMI’s inventory and status |
| 100% Inspection by COR and customer feedback. |
TBD
| Provide documentation and engineering drawing products |
| 100% Inspection by COR and customer feedback. |
TBD
| Provide innovative and rapid response to unique and unconventional prototyping requirements |
| 100% Inspection by COR and customer feedback. |
TBD
| Maintain APSD’s inventory and status |
| 100% Inspection by COR and customer feedback. |
TBD
| Provide rapid cost effective manufacture of aircraft modification hardware |
| 100% Inspection by COR and customer feedback. |
TBD
| Provide rapid cost effective Modification/ reconfiguration of Naval Aircraft |
| 100% Inspection by COR and customer feedback. |
TBD
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt. |
Sm Bus Other
| Maintain CAD/CAM capability to effect rapid cost effective design of prototype aircraft modifications |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt. |
Sm Bus Other
| Maintain supply, parts, and tool inventories. |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Maintain calibration certifications for gauges, torque wenches, and micrometers. |
| 100% Inspection by COR |
TBD
| Maintain certification of lifting devices. |
| 100% Inspection by COR and customer feedback. |
TBD
| Maintain and document preventative maintenance schedules on lifting devices. |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Operate and maintain various hand tools and equipment. |
| 100% Inspection by COR and customer feedback. |
TBD
| Perform various painting functions. |
| 100% Inspection by COR and customer feedback. |
TBD
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt. |
Sm Bus Other
| Funds Expenditure Report |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Performance and Cost Report |
| 100% Inspection by COR |
TBD
| Accident/Incident Report |
| 100% Inspection by COR and customer feedback. |
TBD
| Contractor Inventory |
| 100% Inspection by COR and customer feedback. |
TBD
| Contractor Personnel Clearance Request/ Report |
| 100% Inspection by COR and customer feedback. |
| TBD |
| Personnel Locator |
| 100% Inspection by COR and customer feedback. |
TBD
| Contractor Departmental Payroll Report |
| 100% Inspection by COR and customer feedback. |
TBD
Monthly Summary of Ratings:
Quality
Schedule
Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Cost Control
Business Relations
Management
Other Areas
Number of Unsatisfactory
Annual Surveillance:
The TOM will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure 3 and the monthly summary of ratings.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Monthly Ratings. |
| TBD |
| Schedule |
| Review of Monthly Ratings. |
| TBD |
| Cost Control |
| Review of Monthly Ratings |
| TBD |
| Business Relations |
| Review of Monthly Ratings |
| TBD |
| Management |
| Review of Monthly Ratings |
| TBD |
Utilization of Small Business
| Review of Monthly Ratings |
| TBD |
Other Areas
| Review of Monthly Ratings |
| TBD |