Attachment_P7_CLIN_Breakout_(SUB)_Spreadsheet.xls
XLS spreadsheet 295 KB Posted
- Solicitation number
- N00421-10-R-1042
About this file
Attachment P7 - CLIN Breakout (SUB) Spreadsheet
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| Subcontractor: | |
| 1 | On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated. |
| 2 | On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in. |
| 3 | Only one worksheet should be prepared for the base year period of performance and all option year periods of performance. A summary sheet of all periods of performance should be included at the bottom of this same worksheet. Do not use separate worksheets for option years. |
| 4 | Every worksheet should have items 1 and 2 completed. |
| 5 | The worksheets of the workbook should all be formatted for printing on the appropriate sized paper (either letter or legal sized). It may be formatted for either landscape or portrait. |
| 6 | Within the work sheet any cell colored "blue" contains a formula and should not be edited. |
| 7 | All dollar figures shall be fixed at two decimal places throughout the calculations. Values with additional decimal places shall not be used within any calculations. |
| 8 | The worksheet is arranged so the workforce being proposed for an entire period of performance is shown together, even though it will be separated by individual CLINS in Section B. When the numbers are carried to Section B, they will be the same as shown on the worksheet. |
| 9 | In column A, starting at row 5, the Government Labor Categories from the Government provided Information should have been inserted. In column B, the subcontractor can insert the title of the labor category it will be utilizing. If necessary, insert additional rows--but ensure integrity of formulas. In evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 10 | In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces. |
| 11 | In column E, the subcontractor should identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 12 | In column F, enter the name of the proposed individual for that position. |
| 13 | In column G: |
| (a) Enter the unburdened labor rate for each individual | |
| (b) In Cell G52 on the Engineering tab, G51 on the Training tab, and G47 on the Production tabs, the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) In Cell G53 on the Engineering tab, G52 on the Training tab, and G48 on the Production tabs, the subcontractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. | |
| (d) In Cell G56 on the Engineering tab, G55 on the Training tab, and G51 on the Production tabs, the prime contractor should insert its overhead rate for work performed at the contractor's facility. | |
| (e) In Cell G57 on the Engineering tab, G56 on the Training tab, and G52 on the Production tabs, the subcontractor should insert its overhead rate for work performed at the Client/Government's facility. | |
| (f) In Cell G59 on the Engineering tab, G58 on the Training tab, and G54 on the Production tabs, the subcontractor should insert its G&A rate being applied. | |
| (g) In Cell G64 on the Engineering tab, G62 on the Training tab, and G59 on the Production tabs, the subcontractor should insert the fixed fee rate applied to its cost | |
| 14 | In column H, and then similarly for Columns J, L, N, P, R, T, V, and X: |
| (a) the subcontractor should enter the hours associated with individual labor category for CLIN XX00. Also make sure you plug in the hours for columns J, L, N and so on. | |
| (b) In Cell H52, J52, L52, N52, P52, R52, T52, V52 and X52 on the Engineering tab, H51, J51, L51, N51, P51, R51, T51, V51 and X51 on the Training tab, H47, J47, L47, N47, P47, R47, T47, V47 and X47 on the Production tabs, the subcontractor should insert the base its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) In Cell H53, J53, L53, N53, P53, R53, T53, V53 and X53 on the Engineering tab, H52, J52, L52, N52, P52, R52, T52, V52 and X52 on the Training tab, H48, J48 L48, N48, P48, R48, T48, V48 and X48 on the Production tabs, the prime contractor should insert the base its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (d) In Cell H56, J56, L56, N56, P56, R56, T56, V56 and X56 on the Engineering tab, H55, J55, L55, N55, P55, R55, T55, V55 and X55 on the Training tab, H51, J51, L51, N51, P51, R51, T51, V51 and X51 on the Production tabs, the subcontractor should insert the base its overhead rate is being applied to for work performed at the contractor's facility. | |
| (e) In Cell H57, J57, L57, N57, P57, R57, T57, V57 and X57 on the Engineering tab, H57, J57, L57, N57, P57, R57, T57, V57 and X57 on the Engineering tab, H56, J56, L56, N56, P56, R56, T56, V56 and X56 on the Training tab, H52, J52, L52, N52, P52, R52, T52, V52 and X52 on the Production tabs, the subcontractor should insert the base its overhead rate is being applied to for work performed at the Client/Government's facility. | |
| (f) In Cell H59, J59, L59, N59, P59, R59, T59, V59 and X59 on the Engineering tab, H58, J58, L58, N58, P58, R58, T58, V58 and X58 on the Training tab, and H54, J54, L54, N54, P54, R54, T54, V54 and X54 on the Production tabs, the subcontractor should insert the base its G&A rate is being applied to. | |
| (g) In Cell H404, J404, L404, N404, P404, R404, T404, V404 and X404 on the Engineering tab, H403, J403, L403, N403, P403, R403, T403, V403 and X403 on the Training tab, H399, J399, L399, N399, P399, R399, T399, V399 and X399 on the Production tabs, the subcontractor should insert the subcontractor labor base its fixed fee rate is being applied to. | |
| (h) In Cell H405, J405, L405, N405, P405, R405, T405, V405 and X405 on the Engineering tab, H404, J404, L404, N404, P404, R404, T404, V404 and X404 on the Training tab, H403, J403, L403, N403, P403, R403, T403, V403 and X403 on the Production tabs, the subcontractor should insert the subcontractor labor base its fixed fee rate is being applied to, if any. | |
| 15 | Column AD automatically calculated the total hours for all the CLINS. |
| 16 | Column AE is a summation of the costs. |
| 17 | If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. |
| 18 | When submitting this file, the instructions may be deleted. |
Engineering
| Engineering & NMCI | ||||||||||||||||||||||||||||||
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||||||||||||||||
| Period of Performance: | 10/1/14 - 9/30/23 (inclusive of options) | CLINS | Base -0110 | CLIN | Opt I - 0210 | CLIN | Opt II - 0310 | CLIN | Opt III - 0410 | CLIN | Opt IV - 0510 | CLIN | Opt V - 0610 | CLIN | Opt VI - 0710 | CLIN | Opt VII - 0810 | CLIN | Opt VIII - 0910 | XX10 | CLIN | XX11 | ||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | ||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Labor | Labor | SUM | Total | |||||||||||||||||||
| Cable Splicer | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Computer Programmer III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Configuration Management Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Data Entry Operator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Antenna) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Computer) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Electrical) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Mechancial) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer IV (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer IV (Systems) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering /Electronics Technician | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III (Quality Assurance Specialist) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering/Electronics Technician (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field TechnicAan (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field Technician (Senior) (Installation Supervisor) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst (Junior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Illustrator I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Illustrator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Program Manager (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Anayst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Manager | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Quality Control Inspector/Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Supply Technician (Clerk) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Librarian (Computer Data/Document Coordinator) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Word Processor II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | $ - 0 | |||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | $ - 0 | |||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | |||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Labor and Plus Fee/Profit | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||||||||||||
| Grand Total Engineering | $ - 0 |
&LAttachment_P7_CLIN_Breakout_Spreadsheet &RN00421-10-R-1042 -
ENGINEERING
&LKTR:(insert name)&CSource Selection Information See: FAR 2.101 and 3.104
Training
| TRAINING | ||||||||||||||||||||||||||||||
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||||||||||||||||
| Period of Performance: | 10/1/14 - 9/30-23 (Inclusive of Options) | CLIN | BASE - 0160 | CLIN | OPT I - 0260 | CLIN | OPT II - 0360 | CLIN | OPT III - 0460 | CLIN | OPT IV- 0560 | CLIN | OPT V - 0660 | CLIN | OPT VI - 0760 | CLIN | OPT VII - 0860 | CLIN | OPT VIII - 0960 | CLIN | CLIN | XX11 | ||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | ||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Labor | Labor | SUM | Total | |||||||||||||||||||
| Configuration Management Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Program Manager (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Anayst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Manager | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Quality Control Inspector/Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Instructor/Course Developer | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Librarian (Computer Data/Document Coordinator) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Word Processor II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | |||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Labor and Plus Fee/Profit | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | $ - 0 | ||||||||||||||||
| Capacity Increase for Services | ||||||||||||||||||||||||||||||
| CIC Cost | 10% | $ - 0 | ||||||||||||||||||||||||||||
| CIC Fixed Fee Pool | 10% | $ - 0 | ||||||||||||||||||||||||||||
| CIC Total Cost Plus Fixed Fee | 10% | hours | 0 | $ - 0 | ||||||||||||||||||||||||||
| Grand Total Training | $ - 0 |
&LAttachment_P7_CLIN_Breakout_Spreadsheet &RN00421-10-R-1042 -
TRAINING
&LKTR:(insert name)&CSource Selection Information See: FAR 2.101 and 3.104
Production (Hulls 1-8)
| PRODUCTION | ||||||||||||||||||||||||||||||
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||||||||||||||||
| Period of Performance: | 10/1/14 - 9/30/23 (Inclusive of Options) | CLIN | Base - 0120 (Hull 1) | CLIN | Opt I - 0130 (Hull 2) | CLIN | Opt II - 0220 (Hull 3) | CLIN | Opt III - 0230 (Hull 4) | CLIN | Opt IV - 0240 (Hull 5) | CLIN | Opt V - 0320 (Hull 6) | CLIN | Opt VI -0330 (Hull 7) | CLIN | Opt VII 0340 (Hull 8) | CLIN | XX09 | CLIN | XX10 | CLIN | XX11 | Base - Opt VII (Hulls 1-8) | SUBTOTAL Base - Opt VII (Hulls 1-8) | |||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | ||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Labor | Labor | Subtotal | subtotal | |||||||||||||||||||
| Cable Splicer | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Configuration Management Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Data Entry Operator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Driver | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Electronics Technician Maintenance (Mechanic I) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Electronics Technician Maintenance (Mechanic II) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Antenna) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Electrical) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Mechancial) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III (Quality Assurance Specialist) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering/Electronics Technician (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering/Electronics Technician (Shipyard Representative) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field Technican (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field Technician (Senior) (Installation Supervisor) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst (Junior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Illustrator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican III (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Maintenance Worker | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Program Manager (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Anayst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Manager | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Quality Control Inspector/Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Supply Technician | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Supply Technician (Clerk) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Librarian (Computer Data/Document Coordinator) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Warehouse Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Word Processor II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | |||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||
| Fee / Profit | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Labor and Plus Fee/Profit | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | $ - 0 | |||||||||||||||
| Capacity Increase for Services | ||||||||||||||||||||||||||||||
| CIC Cost | 10% | $ - 0 | ||||||||||||||||||||||||||||
| CIC Fixed Fee Pool | 10% | $ - 0 | ||||||||||||||||||||||||||||
| CIC Total Cost Plus Fixed Fee | 10% | hours | 0 | $ - 0 | ||||||||||||||||||||||||||
| Capacity Increase for ODCs | ||||||||||||||||||||||||||||||
| ODC CIC Cost | 10% | ` | $ - 0 | |||||||||||||||||||||||||||
| Grand Total Production (Hulls 1-8) | $ - 0 |
&LAttachment_P7_CLIN_Breakout_Spreadsheet &RN00421-10-R-1042 - PRODUCTION (Hulls 1-8) &LKTR:(insert name)&CSource Selection Information See: FAR 2.101 and 3.104
Production (Hull 9-13)
| PRODUCTION | ||||||||||||||||||||||||||||||||
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||||||||||||||||||
| Period of Performance: | 10/1/14 - 9/30/23 (Inclusive of Options) | CLIN | Opt VIII - 0420 (Hull 9) | CLIN | Opt IX- 0430 (Hull 10) | CLIN | Opt X - 0440 (Hull 11) | CLIN | Opt XI - 0520 (Hull 12) | CLIN | Opt XII - 0530 (Hull 13) | CLIN | CLIN | CLIN | CLIN | XX09 | CLIN | XX10 | CLIN | XX11 | Opt VIII - Opt XII (Hulls 9-13) | SUBTOTAL Opt VIII - Opt XII (Hulls 9-13) | TOTAL All Production CLINS (Hulls 1-13) | TOTAL All Production CLINs (Hulls 1-13) | ||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | Hrs | |||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Labor | Labor | Subtotal | subtotal | Subtotal | subtotal | |||||||||||||||||||
| Cable Splicer | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Configuration Management Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Data Entry Operator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Driver | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Electronics Technician Maintenance (Mechanic I) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Electronics Technician Maintenance (Mechanic II) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Antenna) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Electrical) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Mechancial) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III (Quality Assurance Specialist) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering/Electronics Technician (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering/Electronics Technician (Shipyard Representative) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field Technican (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field Technician (Senior) (Installation Supervisor) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst (Junior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Illustrator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican III (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Maintenance Worker | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Program Manager (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Anayst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Manager | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Quality Control Inspector/Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Supply Technician | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Supply Technician (Clerk) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Librarian (Computer Data/Document Coordinator) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Warehouse Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| Word Processor II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | |||||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Total Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||
| Fee / Profit | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Total Labor and Profit | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| hrs | ||||||||||||||||||||||||||||||||
| Grand Total Production (Hulls 9-13) | $ - 0 | |||||||||||||||||||||||||||||||
| Capacity Increase for ODCs | ||||||||||||||||||||||||||||||||
| ODC CIC Cost | 10% | ` | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||
| Grand Total Production (Hulls 1-13) | $ - 0 |
&LAttachment_P7_CLIN_Breakout_Spreadsheet &RN00421-10-R-1042 - PRODUCTION (Hulls 9-13) &LKTR:(insert name)&CSource Selection Information See: FAR 2.101 and 3.104
Summary
| SUMMARY | |||
| DO NOT TYPE IN ANY COLORED AREAS | |||
| TOTAL | |||
| Services | hrs | ||
| Engineering Labor | $ - 0 | ||
| Training Labor | $ - 0 | ||
| Production Labor | $ - 0 | ||
| subtotal | 0 | $ - 0 | |
| fringe fulltime | 0.00% | $ - 0 | $ - 0 |
| fringe part time | 0.00% | $ - 0 | $ - 0 |
| subtotal | $ - 0 | ||
| Overhead | Base | ||
| Contractor site | 0.00% | $ - 0 | $ - 0 |
| Client site | 0.00% | $ - 0 | $ - 0 |
| subtotal | $ - 0 | ||
| G&A | 0.00% | $ - 0 | $ - 0 |
| COM | 0.00% | $ - 0 | $ - 0 |
| subtotal | $ - 0 | ||
| Total Labor | $ - 0 | ||
| Fee/Profit Pool | $ - 0 | ||
| Total Labor and Fee/Profit | -0 | $ - 0 | |
| Capacity Increase for Services | |||
| CIC Cost | 10% | ||
| CIC Fixed Fee Pool | 10% | ||
| CIC Total Cost Plus Fixed Fee | 10% | ||
| Capacity Increase for ODCs | |||
| ODC CIC Cost | 10% | ||
| Grand Total Services | $ - 0 |
&LAttachment_P7_CLIN_Breakout_Spreadsheet &RN00421-10-R-1042 -
SUMMARY
&LKTR:(insert name)&RSource Selection Information See: FAR 2.101 and 3.104
File details come from the government source that posted it. Updated .