About this file

Attachment 9 - QASP/SAC

View the file

Other files

File Type Posted
Amendment_0002.doc DOC document
Amendment_0001.doc DOC document
Exhibit_A_-_CDRLs.xls XLS spreadsheet
Attachment_P2_Workforce_Hour_Matrix.xls XLS spreadsheet
Attachment_2_Wage_Determinations.doc DOC document
Attachment_P1_Workforce_Qualification_Spreadsheet.xls XLS spreadsheet
Attachment_4_Contract_Structure_-_9_Year.pdf PDF
Attachment_P6_CLIN_Breakout_(PRIME)_Spreadsheet.xls XLS spreadsheet
Attachment_P4_Past_Performance_Questionnaire.doc DOC document
Attachment_12_NMCI.doc DOC document
Attachment_8_Reserved.doc DOC document
Attachment_P3_CPARS_Update_Questionnaire.doc DOC document
Attachment_6_Turnkey_Management_Plan_Rev__A.doc DOC document
Attachment_3_Bidding_DD254.pdf PDF
N00421-10-R-1042.doc DOC document
Attachment_10_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attachment_11_List_of_Services_for_Clause_5252.209-9510.xls XLS spreadsheet
Attachment_7_List_of_GFP.xls XLS spreadsheet
Attachment_1_Base_Access_Form.doc DOC document
Attachment_P7_CLIN_Breakout_(SUB)_Spreadsheet.xls XLS spreadsheet
Attachment_7_List_of_GFP.xls XLS spreadsheet
Attachment_2_Wage_Determinations.doc DOC document
Attachment_1_Base_Access_Form.doc DOC document
N00421-10-R-1042_for_FBO.doc DOC document
Attachment_4_Contract_Structure_-_9_Year.pdf PDF
Attachment_6_Turnkey_Management_Plan_Rev__A.doc DOC document
Attachment_12_NMCI.doc DOC document
Attachment_10_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attachment_11_List_of_Services_for_Clause_5252.209-9510.xls XLS spreadsheet
Attachment_9_QASP_and_SAC.doc DOC document
PBSOW18Jul11.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan and Surveillance Activity Checklist for Engineering and Technical Services in Support of Integrated Communications and Information Systems Division

1. Purpose

This contract requirement consists of both Level of Effort (LOE) and non-LOE tasks; therefore, a Quality Assurance Surveillance Plan (QASP) and a Surveillance Activity Checklist (SAC) are required. The LOE tasks for engineering and training are non-performance based; which requires a SAC. Whereas, the non-LOE tasks for production utilizes the QASP.

A Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that systematic quality assurance methods are used in the administration of performance-based service contracts. The intent is to ensure that the contractor performs in accordance with the performance metrics and that the Government receives the quality of service called for in the contract.

A Surveillance Activity Checklist (SAC) is a Government developed and applied document used to make sure the systematic quality assurance assessment methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Government receives the quality of services and products for tasks identified in the SOW.

This contract requirement is for contractor engineering, technical, and logistics support services to deliver fully integrated and tested electronic radio communication systems for shipboard installation for the Integrated Communications and Information Systems Division of the Ship and Shore Based Electronic Systems (S&SBES) Group. Specifically, the contractor shall provide support for design, integration, testing, installation, training, and certification of shipboard communications. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP (Quality Assurance Surveillance Plan)/SAC (Surveillance Activity Checklist). The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP and/or SAC, on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely and effective and are delivering the results specified in the contract.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer (CO) - A person duly appointed with the authority to enter into contracts (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is, AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Leads - The COR designates an individual Government Project Lead to assist in administering of specific efforts under the contract.

5. Responsibilities

The following Government resources shall have responsibility for the implementation of this QASP/SAC:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who ensures that the contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance

Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make contractual commitments or authorize changes to the contract on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer’s Representative– The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Government Project Leads – The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance Contractor Performance Assessment Report System (CPARS) – The market place for engineering, technical, and logistics support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP/SAC.

QASP - The below listed methods of surveillance (Enclosures 1 and 2) shall be used by the COR and the Government Project Leads in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist (Enclosure 3) provided herein.

SAC - The Surveillance Activity Checklist (Enclosure 3) below lists the methods of surveillance that will be used by the COR in the technical administration of the SOW tasks performed by the contractor.

Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor and Government Project Leads for the non-LOE production tasks while enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance of both the LOE engineering and training tasks and non-LOE production tasks and shall be provided to the Contracting Officer on a quarterly basis.

8. Documentation

In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the CORT system. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9. Enclosures

Enclosure (1) – Performance Standards (For non-LOE Production tasks only) Enclosure (2) – Incentives (For non-LOE Production tasks only) Enclosure (3) – Surveillance Activity Checklist (For both the LOE Engineering and Training Tasks and non-LOE Production tasks)

PERFORMANCE-BASED QUALITY STANDARDS

SOW Task Description
Performance Standard and Acceptable Quality Level (AQL)*
Surveillance Method/Measure
Incentives
Provide technical and logistics support services for hardware procurement and tracking support IAW PBSOW Para 4.2 – 4.2.1.7
Procurements to be executed in accordance with the government approved Integrated Master Schedule (IMS). For any procurements not executed per the IMS, notification to the government shall be made 10 working days prior to the IMS due date.

Provide hardware location and status information via reports and ad hoc government inquires within 5 working days.

100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2.
Provide technical and logistics support services for logistics and configuration management IAW support IAW PBSOW Para 4.2.2 – 4.2.2.12
Perform receipt inspections and enter procurement items into inventory system within 10 working days of receipt.

Configuration Documentation updates performed to support scheduled deliveries IAW the IMS.

100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2.
Provide technical support services for the Integration and Assembly of the RCS IAW Para 4.2.3 – 4.2.3.5.10
Complete system integration IAW the government approved IMS. Notify the government of deviations from the IMS and provide detailed information on deviations within 5 working days.
100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2.
Provide the technical support services for Equipment Maintenance IAW Para 4.2.4 – 4.2.4.5
Perform PMS as outlined in system documentation.

Maintain test equipment calibration IAW individual equipment calibration cycles. Notify the government 30 days prior to equipment calibration deadlines.

100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2
Provide the technical support services for Testing the RCS INA Para 4.2.5 – 4.2.5.4
Complete test procedures IAW the government approved IMS. Notify the government of deviations from the IMS and provide detailed information on deviations within 5 working days.
100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2
Provide the logistics and technical support services for Equipment Delivery to Shipbuilder IAW Para 4.2.6 – 4.2.6.6
Prepare the RCS for delivery to the shipbuilder IAW the government approved IMS.
100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2
Provide the technical support services for Installation and Testing support at the Shipbuilder’s IAW Para 4.2.7 – 4.2.7.6
Respond to Shipbuilder installation and testing inquires within 5 working days.
100% Inspection by COR, ACOR, and/or other Government Project Leads
* See enclosure 2
SOW/CDRL Task Description
Standard

AQL

Surveillance Method/Measure

Incentives

Technical Information Report – Equipment Exception Report A002
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – DD Form 1149 A012
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Integrated Logistics Support Plan – RCS ILSP A017
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Logistics Management Information Data Product – Equipment Logistics Data Sheets; Allowance Parts Lists (APL) A018
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Logistics Management Information Data Product - Planning Maintenance Requirement Documentation MRCs and MIPs A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Provisional Technical Documentation A020
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Integrated Logistics Support Plan – ILS Deficiency & Resolution Reports A021
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – AEGIS Acquisition Agent ILS Summary A022
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – NAWCAD Hardware Requirements List A023
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Wall-to-Wall Inventory A024
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Integrated Master Schedule A025
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Logistics Management Information Data Product – Integrated Logistics Support Checklist A026
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – RCS Quarterly Progress Report A027
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – 65 Day RCS Inventory Report (SIIRF Cards) A028
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Configuration Control Document Updates A029
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Test Status Report A031
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Ships Maintenance and Material Management (3-M) Manual – Planned Maintenance System (PMS); Ships Maintenance Action Forms A032
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Master Test Schedule A034
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – RCS Equipment Delivery Plan A035
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Final RCS Inventory Report (SIIRF Cards) A036
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – TPR Review Comments & TCPs A037
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Contractor’s Progress Status and Management – Contractor’s Progress Status and Management A049
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Quarterly Hardware Procurement Report A051
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information – Environmental Equipment Evaluation Report A056
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

Technical Information Report – Baseline Equipment Configuration A057
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite.
100% Inspection by COR/ACOR or other Government Project Leads.

* See enclosure 2.

INCENTIVES

The following incentives shall apply to performance under this contract:

Assessment Period Acceptable Performance Definition

How Measured

Incentives

Base:

None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (6 month) evaluation using the CPARS format covering the previous 6 months.
(+) Meet the acceptable performance definition as a condition for further option exercises. *

(-) Does not meet the acceptable performance definition as a condition for further option exercises. *

Option I:

2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 18) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for further option exercises. *

(-) Does not meet the acceptable performance definition as a condition for further option exercises. *

Option II:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 30) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for further option exercises. *

(-) Does not meet the acceptable performance definition as a condition for further option exercises. *

Option III:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 42) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for further option exercises. *

(-) Does not meet the acceptable performance definition as a condition for further option exercises. *

Option IV:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Midpoint of the assessment period (Month 54) evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.

Annually thereafter until completion
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.

See below.

Annual evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.

* The Government reserves the right to not exercise options unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All PBSOW/CDRL efforts will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contributed to or affected the schedule variance. Also address the significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor-provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. Also assess the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.

Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by contract, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business.

Other Areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PBSOW paragraphs 4.2 through 4.2.7.6. The contractor shall be evaluated using the following ratings:

Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant, tangible or intangible, benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). The few areas for improvement are all minor. There are no recurring problems. Contractor’s management initiates effective corrective action whenever needed. .

Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor takes satisfactory corrective action.

Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.

Marginal: Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not always meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Corrective actions have not been taken or are ineffective.

SURVEILLANCE ACTIVITY CHECKLIST

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality of Product or Service, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas utilizing the CPARS evaluation rating definitions listed in Enclosure (2).

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Provide technical support services for systems engineering, integration engineering, and technical documentation IAW PBSOW Para 4.1 - 4.1.4.2.16
100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input
TBD
Provide technical and logistics support services to procure hardware, track, modify, stage, integrate, test, certify, and deliver ships’ RCS IAW PBSOW Para 4.2.7.6 – 4.2.10.
100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input
TBD
Provide technical services to train, test and evaluate personnel of the pre-commissioning unit who will operate and maintain the RCS on board ship IAW Para 4.3 – 4.3.7.
100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Test Procedure - ATE Stage 2 Test Procedures A001
100% inspection by COR, ACOR, and/or Government Project Leads
TBD

Technical Information Report - Equipment Exceptions Report A002

100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Report – Study/Services – RCS Impact/ Feasibility Studies A003
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Report – Study/Services – RCS Design Change Document (IS/WAS) A004
100% inspection by COR, ACOR, and/or Government Project Leads
TBD

Technical Report – Study/Services -

COTS – Feasibility Studies of Emerging Technology A005

100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Report, Record, of Meeting/ Minutes – Trip Reports/ Meeting Minutes A006
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Service Engineering Report - Quarterly Consolidated Engineering Service Report A007
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Technical Data Packages A008
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Equipment Installation Instruction – Work Instructions A009
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Product Drawings and Associated Lists –Drawings A010
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Technical Information Report – DD Form 1149 A012
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Manual Contract Requirement (TMCR) – RCS Technical Manual A013
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Installation Requirements Document (IRD) Review Comments A014
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – GFI Deficiency Resolution Reports A015
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – RCS SPD and Schedules A through E Review Comments A016
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Integrated Logistics Support Plan – RCS ILSP A017
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Logistics Management Information Data Product – Equipment Logistics Data Sheets; Allowance Parts Lists (APL) A018
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Logistic Management Information Data Product - Planning Maintenance Req Documentation MRCs and MIPS A019
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Provisioning Technical Documentation A020
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Integrated Logistics Support Plan – ILS Deficiency & Resolution Reports A021
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – AEGIS Acquisition Agent ILS Summary A022
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – NAWCAD Hardware Requirements List A023
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Wall-to-Wall Inventory A024
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Integrated Master Schedule A025
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Logistics Management Information Data Product – Integrated Logistics Support Checklist A026
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – RCS Quarterly Progress Report A027
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – 65 Day RCS Inventory Report (SIIRF Cards) A028
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Configuration Control Document Updates A029
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Test Procedures Preparation Directive – Equipment Test Procedures A030
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Test Status Report A031
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Ships Maintenance and Material Management (3-M) Manual – Planned Maintenance System (PMS); Ships Maintenance Action Forms A032
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – RCS Discrepancy Report A033
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Master Test Plan A034
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – RCS Equipment Delivery Plan A035
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Final RCS Inventory Report (SIIRF Cards) A036
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – TPR Review Comments & TCPs A037
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Inspection and Test Plan – Inspection System Plan A038
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
RCS Training Plan – OJT Lesson Plan A039
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Training Guide – Student Guide A040
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Training Conduct Support Document – Lesson Plan A041
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Presentation Material – Formal Status Review Presentation Materials A042
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Training Report A043
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
TDL Close-Out Report A044
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Financial Progress Report A045
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report –Installation Drawing/Tech Document Review A046
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – RCS Delta Drawing List A047
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Training Guide – Instructor Guide A048
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Contractor’s Progress Status & Management A049
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Operations Security (OPSEC) Plan A050
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Quarterly Hardware Procurement Report A051
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Quality System Plan – Quality Management / Assurance Plan A052
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Incurred Cost and Progress Reporting – Invoice Support Report A054
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt
Util. of Small Bus.
Other Areas
Presentation Material A055
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Environmental Equipment Evaluation A056
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Baseline Equipment Configuration A057
100% inspection by COR, ACOR, and/or Government Project Leads
TBD
Technical Information Report – Label Drawing
100% inspection by COR, ACOR, and/or Government Project Leads
TBD

Quarterly Summary of Ratings:

Quality of Product

Schedule

Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal

Number of Unsatisfactory

Cost Control

Business Relations

Number of Exceptional

Management

Utilization of Small Business

Other Areas annual SURVEILLANCE:

The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (2). This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract which cover only the previous 6 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings.
TBD
Schedule
Review of Quarterly Ratings.
TBD
Cost Control
Review of Quarterly Ratings.
TBD
Business Relations
Review of Quarterly Ratings.
TBD
Management
Review of Quarterly Ratings.
TBD
Utilization of Small Business
Review of Quarterly Ratings.
TBD
Other Areas
Review of Quarterly Ratings.
TBD

File details come from the government source that posted it. Updated .