Quality Assurance Surveillance Plan and Surveillance Activity Checklist for Engineering and Technical Services in Support of Integrated Communications and Information Systems Division
1. Purpose
This contract requirement consists of both Level of Effort (LOE) and non-LOE tasks; therefore, a Quality Assurance Surveillance Plan (QASP) and a Surveillance Activity Checklist (SAC) are required. The LOE tasks for engineering and training are non-performance based; which requires a SAC. Whereas, the non-LOE tasks for production utilizes the QASP.
A Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that systematic quality assurance methods are used in the administration of performance-based service contracts. The intent is to ensure that the contractor performs in accordance with the performance metrics and that the Government receives the quality of service called for in the contract.
A Surveillance Activity Checklist (SAC) is a Government developed and applied document used to make sure the systematic quality assurance assessment methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Government receives the quality of services and products for tasks identified in the SOW.
This contract requirement is for contractor engineering, technical, and logistics support services to deliver fully integrated and tested electronic radio communication systems for shipboard installation for the Integrated Communications and Information Systems Division of the Ship and Shore Based Electronic Systems (S&SBES) Group. Specifically, the contractor shall provide support for design, integration, testing, installation, training, and certification of shipboard communications. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP (Quality Assurance Surveillance Plan)/SAC (Surveillance Activity Checklist). The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP and/or SAC, on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely and effective and are delivering the results specified in the contract.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer (CO) - A person duly appointed with the authority to enter into contracts (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is, AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Project Leads - The COR designates an individual Government Project Lead to assist in administering of specific efforts under the contract.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP/SAC:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who ensures that the contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance
Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The COR is not empowered to make contractual commitments or authorize changes to the contract on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
Alternate Contracting Officer’s Representative– The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance in the absence of the COR. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
Government Project Leads – The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance Contractor Performance Assessment Report System (CPARS) – The market place for engineering, technical, and logistics support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP/SAC.
QASP - The below listed methods of surveillance (Enclosures 1 and 2) shall be used by the COR and the Government Project Leads in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist (Enclosure 3) provided herein.
SAC - The Surveillance Activity Checklist (Enclosure 3) below lists the methods of surveillance that will be used by the COR in the technical administration of the SOW tasks performed by the contractor.
Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor and Government Project Leads for the non-LOE production tasks while enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance of both the LOE engineering and training tasks and non-LOE production tasks and shall be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file within the CORT system. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) – Performance Standards (For non-LOE Production tasks only) Enclosure (2) – Incentives (For non-LOE Production tasks only) Enclosure (3) – Surveillance Activity Checklist (For both the LOE Engineering and Training Tasks and non-LOE Production tasks)
PERFORMANCE-BASED QUALITY STANDARDS
| SOW Task Description |
| Performance Standard and Acceptable Quality Level (AQL)* |
| Surveillance Method/Measure |
| Incentives |
| Provide technical and logistics support services for hardware procurement and tracking support IAW PBSOW Para 4.2 – 4.2.1.7 |
| Procurements to be executed in accordance with the government approved Integrated Master Schedule (IMS). For any procurements not executed per the IMS, notification to the government shall be made 10 working days prior to the IMS due date. |
Provide hardware location and status information via reports and ad hoc government inquires within 5 working days.
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2. |
| Provide technical and logistics support services for logistics and configuration management IAW support IAW PBSOW Para 4.2.2 – 4.2.2.12 |
| Perform receipt inspections and enter procurement items into inventory system within 10 working days of receipt. |
Configuration Documentation updates performed to support scheduled deliveries IAW the IMS.
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2. |
| Provide technical support services for the Integration and Assembly of the RCS IAW Para 4.2.3 – 4.2.3.5.10 |
| Complete system integration IAW the government approved IMS. Notify the government of deviations from the IMS and provide detailed information on deviations within 5 working days. |
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2. |
| Provide the technical support services for Equipment Maintenance IAW Para 4.2.4 – 4.2.4.5 |
| Perform PMS as outlined in system documentation. |
Maintain test equipment calibration IAW individual equipment calibration cycles. Notify the government 30 days prior to equipment calibration deadlines.
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2 |
| Provide the technical support services for Testing the RCS INA Para 4.2.5 – 4.2.5.4 |
| Complete test procedures IAW the government approved IMS. Notify the government of deviations from the IMS and provide detailed information on deviations within 5 working days. |
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2 |
| Provide the logistics and technical support services for Equipment Delivery to Shipbuilder IAW Para 4.2.6 – 4.2.6.6 |
| Prepare the RCS for delivery to the shipbuilder IAW the government approved IMS. |
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2 |
| Provide the technical support services for Installation and Testing support at the Shipbuilder’s IAW Para 4.2.7 – 4.2.7.6 |
| Respond to Shipbuilder installation and testing inquires within 5 working days. |
| 100% Inspection by COR, ACOR, and/or other Government Project Leads |
| * See enclosure 2 |
| SOW/CDRL Task Description |
| Standard |
AQL
Surveillance Method/Measure
Incentives
| Technical Information Report – Equipment Exception Report A002 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – DD Form 1149 A012 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Integrated Logistics Support Plan – RCS ILSP A017 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Logistics Management Information Data Product – Equipment Logistics Data Sheets; Allowance Parts Lists (APL) A018 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Logistics Management Information Data Product - Planning Maintenance Requirement Documentation MRCs and MIPs A019 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Provisional Technical Documentation A020 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Integrated Logistics Support Plan – ILS Deficiency & Resolution Reports A021 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – AEGIS Acquisition Agent ILS Summary A022 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – NAWCAD Hardware Requirements List A023 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Wall-to-Wall Inventory A024 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Integrated Master Schedule A025 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Logistics Management Information Data Product – Integrated Logistics Support Checklist A026 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – RCS Quarterly Progress Report A027 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – 65 Day RCS Inventory Report (SIIRF Cards) A028 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Configuration Control Document Updates A029 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Test Status Report A031 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Ships Maintenance and Material Management (3-M) Manual – Planned Maintenance System (PMS); Ships Maintenance Action Forms A032 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Master Test Schedule A034 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – RCS Equipment Delivery Plan A035 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Final RCS Inventory Report (SIIRF Cards) A036 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – TPR Review Comments & TCPs A037 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Contractor’s Progress Status and Management – Contractor’s Progress Status and Management A049 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Quarterly Hardware Procurement Report A051 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information – Environmental Equipment Evaluation Report A056 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
| Technical Information Report – Baseline Equipment Configuration A057 |
| Submission is in accordance with the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than 1 report may be inaccurate or require a rewrite. |
| 100% Inspection by COR/ACOR or other Government Project Leads. |
* See enclosure 2.
INCENTIVES
The following incentives shall apply to performance under this contract:
Assessment Period Acceptable Performance Definition
How Measured
Incentives
Base:
None of the measurement areas are rated “Marginal” or below.
See below.
| Midpoint of the assessment period (6 month) evaluation using the CPARS format covering the previous 6 months. |
| (+) Meet the acceptable performance definition as a condition for further option exercises. * |
(-) Does not meet the acceptable performance definition as a condition for further option exercises. *
Option I:
2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below.
See below.
| Midpoint of the assessment period (Month 18) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for further option exercises. * |
(-) Does not meet the acceptable performance definition as a condition for further option exercises. *
| Option II: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 30) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for further option exercises. * |
(-) Does not meet the acceptable performance definition as a condition for further option exercises. *
| Option III: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 42) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for further option exercises. * |
(-) Does not meet the acceptable performance definition as a condition for further option exercises. *
| Option IV: |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Midpoint of the assessment period (Month 54) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating. |
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.
| Annually thereafter until completion |
| 2 or more of the measurement areas rated “Very Good” or “Exceptional.” None of the measurement areas are rated “Marginal” or below. |
See below.
| Annual evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating. |
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory Final CPARS rating.
* The Government reserves the right to not exercise options unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All PBSOW/CDRL efforts will be assessed focusing on the following:
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contributed to or affected the schedule variance. Also address the significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor-provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. Also assess the extent to which the contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required the by contract, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business.
Other Areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PBSOW paragraphs 4.2 through 4.2.7.6. The contractor shall be evaluated using the following ratings:
Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant, tangible or intangible, benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). The few areas for improvement are all minor. There are no recurring problems. Contractor’s management initiates effective corrective action whenever needed. .
Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor takes satisfactory corrective action.
Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.
Marginal: Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not always meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Corrective actions have not been taken or are ineffective.
SURVEILLANCE ACTIVITY CHECKLIST
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality of Product or Service, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas utilizing the CPARS evaluation rating definitions listed in Enclosure (2).
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Provide technical support services for systems engineering, integration engineering, and technical documentation IAW PBSOW Para 4.1 - 4.1.4.2.16 |
| 100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input |
| TBD |
| Provide technical and logistics support services to procure hardware, track, modify, stage, integrate, test, certify, and deliver ships’ RCS IAW PBSOW Para 4.2.7.6 – 4.2.10. |
| 100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input |
| TBD |
| Provide technical services to train, test and evaluate personnel of the pre-commissioning unit who will operate and maintain the RCS on board ship IAW Para 4.3 – 4.3.7. |
| 100% inspection by COR, ACOR, and/or Government Project Leads Quarterly Input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Test Procedure - ATE Stage 2 Test Procedures A001 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
Technical Information Report - Equipment Exceptions Report A002
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Report – Study/Services – RCS Impact/ Feasibility Studies A003 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Report – Study/Services – RCS Design Change Document (IS/WAS) A004 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
Technical Report – Study/Services -
COTS – Feasibility Studies of Emerging Technology A005
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Report, Record, of Meeting/ Minutes – Trip Reports/ Meeting Minutes A006 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Service Engineering Report - Quarterly Consolidated Engineering Service Report A007 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Technical Data Packages A008 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Equipment Installation Instruction – Work Instructions A009 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Product Drawings and Associated Lists –Drawings A010 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Technical Information Report – DD Form 1149 A012 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Manual Contract Requirement (TMCR) – RCS Technical Manual A013 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Installation Requirements Document (IRD) Review Comments A014 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – GFI Deficiency Resolution Reports A015 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – RCS SPD and Schedules A through E Review Comments A016 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Integrated Logistics Support Plan – RCS ILSP A017 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Logistics Management Information Data Product – Equipment Logistics Data Sheets; Allowance Parts Lists (APL) A018 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Logistic Management Information Data Product - Planning Maintenance Req Documentation MRCs and MIPS A019 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Provisioning Technical Documentation A020 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Integrated Logistics Support Plan – ILS Deficiency & Resolution Reports A021 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – AEGIS Acquisition Agent ILS Summary A022 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – NAWCAD Hardware Requirements List A023 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Wall-to-Wall Inventory A024 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Integrated Master Schedule A025 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Logistics Management Information Data Product – Integrated Logistics Support Checklist A026 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – RCS Quarterly Progress Report A027 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – 65 Day RCS Inventory Report (SIIRF Cards) A028 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Configuration Control Document Updates A029 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Test Procedures Preparation Directive – Equipment Test Procedures A030 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Test Status Report A031 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Ships Maintenance and Material Management (3-M) Manual – Planned Maintenance System (PMS); Ships Maintenance Action Forms A032 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – RCS Discrepancy Report A033 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Master Test Plan A034 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – RCS Equipment Delivery Plan A035 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Final RCS Inventory Report (SIIRF Cards) A036 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – TPR Review Comments & TCPs A037 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Inspection and Test Plan – Inspection System Plan A038 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| RCS Training Plan – OJT Lesson Plan A039 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Training Guide – Student Guide A040 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Training Conduct Support Document – Lesson Plan A041 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Presentation Material – Formal Status Review Presentation Materials A042 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Training Report A043 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| TDL Close-Out Report A044 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Financial Progress Report A045 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report –Installation Drawing/Tech Document Review A046 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – RCS Delta Drawing List A047 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Training Guide – Instructor Guide A048 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Contractor’s Progress Status & Management A049 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Operations Security (OPSEC) Plan A050 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Quarterly Hardware Procurement Report A051 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Quality System Plan – Quality Management / Assurance Plan A052 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Incurred Cost and Progress Reporting – Invoice Support Report A054 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt |
| Util. of Small Bus. |
| Other Areas |
| Presentation Material A055 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Environmental Equipment Evaluation A056 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Baseline Equipment Configuration A057 |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
| Technical Information Report – Label Drawing |
| 100% inspection by COR, ACOR, and/or Government Project Leads |
| TBD |
Quarterly Summary of Ratings:
Quality of Product
Schedule
Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Cost Control
Business Relations
Number of Exceptional
Management
Utilization of Small Business
Other Areas annual SURVEILLANCE:
The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure (2). This annual assessment will occur at the midpoint of each year following the award of the contract and cover the previous 12 months, except for the first year of the contract which cover only the previous 6 months.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings. |
| TBD |
| Schedule |
| Review of Quarterly Ratings. |
| TBD |
| Cost Control |
| Review of Quarterly Ratings. |
| TBD |
| Business Relations |
| Review of Quarterly Ratings. |
| TBD |
| Management |
| Review of Quarterly Ratings. |
| TBD |
| Utilization of Small Business |
| Review of Quarterly Ratings. |
| TBD |
| Other Areas |
| Review of Quarterly Ratings. |
| TBD |