View the file

Other files

File Type Posted
Amendment_0002.doc DOC document
Exhibit_A_-_CDRLs.xls XLS spreadsheet
Attachment_9_QASP_and_SAC.doc DOC document
Attachment_P2_Workforce_Hour_Matrix.xls XLS spreadsheet
Attachment_2_Wage_Determinations.doc DOC document
Attachment_P1_Workforce_Qualification_Spreadsheet.xls XLS spreadsheet
Attachment_4_Contract_Structure_-_9_Year.pdf PDF
Attachment_P6_CLIN_Breakout_(PRIME)_Spreadsheet.xls XLS spreadsheet
Attachment_P4_Past_Performance_Questionnaire.doc DOC document
Attachment_12_NMCI.doc DOC document
Attachment_8_Reserved.doc DOC document
Attachment_P3_CPARS_Update_Questionnaire.doc DOC document
Attachment_6_Turnkey_Management_Plan_Rev__A.doc DOC document
Attachment_3_Bidding_DD254.pdf PDF
N00421-10-R-1042.doc DOC document
Attachment_10_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attachment_11_List_of_Services_for_Clause_5252.209-9510.xls XLS spreadsheet
Attachment_7_List_of_GFP.xls XLS spreadsheet
Attachment_1_Base_Access_Form.doc DOC document
Attachment_P7_CLIN_Breakout_(SUB)_Spreadsheet.xls XLS spreadsheet
Attachment_7_List_of_GFP.xls XLS spreadsheet
Attachment_2_Wage_Determinations.doc DOC document
Attachment_1_Base_Access_Form.doc DOC document
N00421-10-R-1042_for_FBO.doc DOC document
Attachment_4_Contract_Structure_-_9_Year.pdf PDF
Attachment_6_Turnkey_Management_Plan_Rev__A.doc DOC document
Attachment_12_NMCI.doc DOC document
Attachment_10_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attachment_11_List_of_Services_for_Clause_5252.209-9510.xls XLS spreadsheet
Attachment_9_QASP_and_SAC.doc DOC document
PBSOW18Jul11.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Jan-2014 12:00 AM to 07-Jan-2014 02:00 PM.

The following have been added by full text:

QUESTIONS & ANSWERS - ROUND 1

1. Question: Section L, paragraph 3.0 (table) provides a recommended page limit for the Sample Task of 10 Pages. In the Section L description of the volumes, under Technical Volume 2, paragraph 2.2.2 Sample Task, subparagraph 2.2.1 states that the written response to the sample task should be no more than 6 pages. Would the Government please confirm that 10 pages are recommended for the Sample Task?

Answer: The recommended page limit for the Sample Task is 10 pages. Under Technical Volume 2, paragraph 2.2.2 Sample Task, subparagprah 2.2.1, the sentence referencing a page limitation for the sample task has been removed for clarity. Please see Amendment 1.

2. Question: Section B Page 50 does not label Engineer IV (Systems) and Engineer Technician III (QA Specialist) as Key. Section C page 79 states that they are Key Labor Categories. Would the Government please confirm the categories should be considered key and if true, provide a Key to non-Key breakdown for Engineer IV (Systems)?

Answer: Engineer IV (Systems) and Engineer Technician III (Quality Assurance Specialist) are key labor categories. A key to non-key breakdown has been provided for Engineer IV (Systems). Please see Amendment 1.

3. Question: Section L 2.0 (pg. 152), 4.5 (pg. 168), and Attachment P6 item 5 note that foldout pages must not exceed 11 X 17 inches and state that Attachments P6 and P7 may require letter or legal sized paper. For formatting, printing, and the Government's ease of review, will the Government allow 11 X 17 inch paper be acceptable for attachments P6 and P7?

Answer: Yes, the Government will allow 11 X 17 inch paper for Attachments P6 and P7. Please see Amendment 1.

4. Question: SF-33 BLOCK-9 states the proposal response is due at 12:00am, 1/7/2013. Would the Government please confirm that the proposal is due at 12:00pm (noon), 1/7/2013?

Answer: The deadline for proposal submission will be 2:00pm on 7 January 2014. Please see Amendment 1.

5. Question: In Section L, page 152, section 2.0 states that graphs shall be no smaller than 10 pt. font. Is it acceptable to have graphics with text beneficial but not necessary to graphic's overall objective scaled to less than 10 pt. font?

Answer: Yes, it is acceptable.

6. Question: Section L 3.1, pg. 161 references Attachment P4 as the Past Performance Matrix but Attachment P4 contains the Past Performance Questionnaire. Would the Government please clarify if the Past Performance Matrix on page 162 is to be utilized or if there will be one provided via a separate attachment?

Answer: Section L, 3.1 incorrectly references the Past Performance Matrix as Attachment P4. The format for the Past Performance Matrix is within Section L, 3.1 and no separate attachment will be provided. Attachment P4 is the Past Performance Questionnaire. Please see Amendment 1.

7. Question: Section L, pg. 174 section 6.0 states that "If there are no exceptions, deviations or waivers, the Offeror shall provide a one-page Volume 6 in the Executive Summary stating so." Should this reference Volume 5 vice Volume 6?

Answer: Yes, this should reference Volume 5. Please see Amendment 1.

8. Question: Does the 10 page suggested limit on the Executive Summary apply only to Section (i) "concise abstract"?

Answer: The 10 page recommended page limitation applies to all of Volume 1.0.

9. Question: Block 9 of the Solicitation indicates that proposals are due at 12:00 a.m. on 7 January 2014. Can the Government please confirm if this time is accurate?

Answer: Please see the answer to Question #4.

10. Question: Section A, Number 3, states that Data CLINs are Not Separately Priced. However, the Data CLINs in Section B have a space for “Net Amt”. Can the Government please confirm that the Data CLINs are in fact Not Separately Priced?

Answer: The Data CLINs are Not Separately Priced as indicated in Section A, Number 3. The “Net Amt” within Section B is a system generated error and cannot be fixed at this time. The Government is working with the SPS Help Desk for a resolution.

11. Question: Clause 52.219-1 states the small business size standard is $35.5M. However, Clause 252.204-7007 ALT A states the size standard is $27M. Can the Government please confirm which is accurate?

Answer: The size standard is $35.5M for NAICS code 541330. Clause 252.204-7007 ALT A has been updated with the most recent version. Please see Amendment 1.

12. Question: Section L, page 152 states that graphs must be no smaller than 10 pt font and that graphic resolution should be consistent with the purpose of the data presented. Is the assumption correct that tables may also be 10 pt font and graphics must be readable?

Answer: Please see the answer to Question #5.

13. Question: Section C, page 85, qualifications for Project Manager labor category has a section (c) stating "All other Project Manager candidates must meet the following experience requirements" but seems out of place. Would the Government please clarify if there are separate requirements for Key Project Managers and Non-Key Project Managers?

Answer: The statement "All other Project Manager candidates must meet the following experience requirements" has been removed. Please see Amendment 1.

14. Question: Section C, page 77, 13.2 states "Any person having had a security clearance revoked for any reason shall be ineligible to perform under this contract." In cases where a clearance was revoked but DSS has since reissued a clearance, would a person be eligible to perform under this contract?

Answer: If a security clearance has been reissued, it is no longer considered to be revoked and the person is eligible to perform under this contract.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

The following clause, 5252.211-9503, LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) - ALT I (JUN 2013), is only applicable to the Engineering and Training portions of this requirement.

5252.211-9503

LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) - ALT I (JUN 2013)

(a) The level of effort estimated to be ordered during the term of this contract is 529,730 man-hours of direct labor including authorized subcontract labor, if any. The estimated composition of the total man-hours of direct labor by classification is as follows:

Engineering Labor Categories
CLIN HRS –

Base through Option IV

CLIN HRS –

Option V

CLIN HRS –

Options VI & VII

CLIN HRS –

Option VIII

TOTAL MAN HOURS

Cable Splicer
2000
800
500
200
12000
Computer Programmer III
2000
800
500
200
12000
Configuration Management Analyst*
1920
768
480
192
11520
Data Entry Operator II
2000
800
500
200
12000
Drafter I
1000
400
250
100
6000
Drafter II
2000
800
500
200
12000
Drafter III
2000
800
500
200
12000
Engineer III (Antenna)
2000
800
500
200
12000
Engineer III (Computer)*
1920
768
480
192
11520
Engineer III (Electrical) (Key)*
1920
768
480
192
11520
Engineer III (Electrical) (Non-Key)
5080
2032
1270
508
30480
Engineer III
6850
2740
1713
685
41101
Engineer III (Mechanical) (Key)*
1920
768
480
192
11520
Engineer III (Mechanical) (Non-Key)
3000
1200
750
300
18000
Engineer IV (Senior)*
1920
768
480
192
11520
Engineer IV (Systems) (Key)*
1920
768
480
192
11520
Engineer IV (Systems) (Non-Key)
2080
832
520
208
12480
Engineering/Electronics Technician
2600
1040
650
260
15600
Engineering/Electronics Technician (Senior)
2000
800
500
200
12000
Engineering Technician I
2000
800
500
200
12000
Engineering Technician III
2000
800
500
200
12000
Engineering Technician III (Quality Assurance Specialist)*
1000
400
250
100
6000
Field Technician (Senior)
8000
3200
2000
800
48000
Field Technician Senior (Installation Supervisor)
500
200
125
50
3000
Financial Analyst (Junior)
1000
400
250
100
6000
Financial Analyst
2000
800
500
200
12000
Illustrator I
500
200
125
50
3000
Illustrator II
1500
600
375
150
9000
Logistician II
500
200
125
50
3000
Program Manager (Senior)*
1920
768
480
192
11520
Project Analyst
4000
1600
1000
400
24000
Project Manager*
3840
1536
960
384
23040
Quality Control Inspector/Specialist
1000
400
250
100
6000
Supply Technician (Clerk)
500
200
125
50
3000
Technical Librarian (Computer/Data Document Coordinator)
2000
800
500
200
12000
Technical Writer I
3000
1200
750
300
18000
Word Processor II
4000
1600
1000
400
24000
Total Hours Per Option Year
85,390
34,156
21,348
8,539
512,341
Training Labor Categories
CLIN HRS (Base Year through Option VIII
TOTAL MAN HOURS
Configuration Management Analyst
50
450
Drafter II
50
450
Engineer III
100
900
Project Analyst
100
900
Project Manager
100
900
Project Manager Senior
50
450
Quality Control Inspector/Specialist
50
450
Technical Instructor/Course Developer
400
3600
Technical Librarian (Computer Data/Document Coordinator)
100
900
Technical Writer I
220
1980
Word Processor II
250
2250
Total Hours Per Option Year
1470
13,230

* denotes Key Personnel labor categories

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.

(c) It is agreed that while the contractor's performance during the period set forth in paragraph (a) above is based upon an anticipated level of effort consisting of man-hours of direct labor (as may be described or defined elsewhere herein), such level of effort may fluctuate, either upward or downward, by no more than ten (10%) percent of the total anticipated man-hours. This fixed fee is agreed to be paid for man-hours expended from ninety (90%) percent to one hundred ten (110%) percent of the total anticipated man-hours. The fixed fee shall not vary with the cost of the actual effort supplied within this range. In the event that less than ninety (90%) percent of the anticipated level of effort is actually expended by the expiration date of the contract, the Government shall have the option of:

(1) requiring the contractor to continue to perform until the level of effort expended equals ninety (90%) percent of the anticipated level of effort; or

(2) effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than ninety (90%) percent of the anticipated level of effort.

(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SOW

Items 0110, 0210, 0310, 0410, 0510, 0610, 0710, 0810 and 0910 – The contractor shall provide the services in accordance with Section C, Statement of Work (SOW) paragraph 4.1.

Items 0120, 0130, 0220, 0230, 0240, 0320, 0330, 0340, 0420, 0430, 0440, 0520, 0530– The contractor shall provide the services in accordance with the Section C, SOW paragraph 4.2.

Items 0160, 0260, 0360, 0460, 0560, 0660, 0760, 0860, and 0960 – The contractor shall provide the services in accordance with Section C, SOW paragraph 4.3.

Items 0111, 0121, 0131, 0161, 0211, 0221, 0231, 0241, 0261, 0311, 0321, 0331, 0341, 0361, 0411, 0421, 0431, 0441, 0461, 0511, 0521, 0531, 0561, 0611, 0661, 0711, 0761, 0811, 0861, 0911 and 0961 - The contractor shall provide material and travel in accordance with Section C, SOW paragraphs 10.0 and 11.0.

Items 0171, 0271, 0371, 0471, 0571, 0671, 0771, 0871, and 0971– The contractor shall provide NMCI in accordance with Section C, SOW paragraph 6.4.

Items 0122, 0132, 0182, 0222, 0232, 0242, 0282, 0322, 0332, 0342, 0382, 0422, 0432, 0442, 0482, 0522, 0532, and 0582– The data to be furnished hereunder shall be in accordance with Section J, Exhibit A, DD Form 1423, Contract Data Requirements List (CDRL).

STATEMENT OF WORK

FOR ENGINEERING AND TECHNICAL SERVICES TO SUPPORT

THE Integrated Communications and Information Systems

RADIO COMMUNICATIONS FOR U.S. NAVY SHIPS

1.0 BACKGROUND The development and acquisition of U.S. Naval vessels are under the control and direction of Naval Sea Systems Command (NAVSEA). The design, procurement, integration, testing, and training of Command, Control, Communications, Computers, and Intelligence (C4I) electronic systems that meet the requirements of the Navy operating forces are the responsibility of the Program Executive Office for C4I (PEO C4I). In support of the Program Executive Office for Ships (PEO Ships), NAVSEA, and PEO C4I, the Naval Air Warfare Center Aircraft Division (NAWCAD) is tasked to design, procure, integrate, test, train, deliver and support C4I electronic Radio Communication Systems (RCSs) for ships of the U.S. Navy including, but not limited to, AEGIS destroyers and cruisers, amphibious assault ships, aircraft carriers, sea-lift ships, and other surface combatant and comparable ships. NAWCAD is tasked to perform research and development, engineering, technical and logistics support services to deliver fully integrated and tested C4I electronic radio communication systems for shipboard installation. The contractor will provide support to NAWCAD to complete this tasking.

2.0 SCOPE This contract procures support for the Integrated Communications and Information Systems (ICIS) Division (Code 4.5.10) of NAWCAD in the research, development, design, integration, testing, installation, training, and certification of shipboard C4I electronic communication systems; the research, development, design, integration, testing, installation, training, and certification of like systems at shore sites associated with the deployment of fleet support to surface ships; and the research, development, design, integration, testing, installation, training, and certification of mobile and airborne C4I electronic communication systems designed to interface with the C4I electronic architecture of surface ships.

Depending on the shipboard C4I electronic communication systems requirements the contractor will research, develop, test, evaluate, and prepare the fully integrated C4I electronic RCS for shipment to a designated shipbuilder and support the subsequent installation on board the ship. The contractor shall provide support to the shipbuilder until Ship’s Custody Transfer (SCT). Post-installation and On-the-Job Training (OJT) for the ship’s crew after SCT are also provided under the terms of this contract.

Initial work will support the RCS for one AEGIS destroyer or comparable ship. Options are included for services to support an additional 12 Navy surface combatants or comparable ships. The services detailed in the Requirements Section (4.0) can be applied to any Navy surface combatant or comparable ships and associated shipboard communication system.

3.0 APPLICABLE DOCUMENTS Acronyms used throughout the Statement of Work (SOW) are provided as Attachment (5) under Section J – Exhibits and Attachments. The contractor is required to interface extensively with the shipbuilder. With certain exceptions, the contractor for this effort shall conform to the same standards and specifications as the shipbuilder. The Government will provide all necessary reference documents not generally available to the Contractor as required. Throughout the life of the contract, if any instruction or document is replaced or superseded, the replacement or superseding instruction or document shall be applicable to the requirements defined in this SOW.

3.1 Revision Level And Date: Unless otherwise noted, the revision level and date for each document, specification or standard cited within this solicitation/contract (including any specifications or standards cited in any drawing, handbook, or referenced specification or standard cited within this solicitation) shall be that listed on the Department of Defense ASSIST Database (http://assist.daps.dla.mil/quicksearch/ ) in effect on the date of contract award.

ANSI/ASQ ISO 9001:2008 American National Standards Institute/American Society for Quality

ANSI/TIA-568 Structured Cabling Standards and Practices

ASME Y14.100-2004 Engineering Drawing Practices (See Note*) DoD Directive 5000.3 Test and Evaluation DoD Integrated Master Plan and Integrated Master Schedule Preparation and User Guide

DoD 5220.22-M National Industrial Security Program Operating Manual

DoD-D-1000 Military Specification Drawing, Engineering and Associated Lists

Electronic Industries Alliance (EIA) 632 Standard- Processes for Engineering a System

MIL-STD-100E Engineering Drawing Practices

NAVAIRINST 3960.4B Project Test Plan Policy And Guide For Testing Air Vehicles, Air Vehicle Weapons, And Air Vehicle Installed Systems

NAVAIRINST 5216.8C NAVAIR Supplement to the Department of the Navy Correspondence Manual

NAVAL SYSTEMS ENGINEERING GUIDE, October 2004

NAVSEA 0900-LP-095-2010 Ship Construction Tests and Trials Manual

NAVSEA 0900-LP-095-6010 Planning Guide Total Ship Test Program for Ship Production

NAVSEA T 9050-AA-DIR-010/AEGIS AEGIS Ship Test Procedure Preparation Directive

NAWCADINST 2400.1B Radio Frequency Management

NAWCADINST 5510.1A NAVAIRWARCENACDIV Information, Personnel and Industrial Security Program Manual

NAWCADINST 7320.1A NAVAIRWARCENACDIV Property Management Process for Minor Property and Class 5 and Class 4 Plant Property

OPNAVINST 3432.1A Operations Security Plan

OPNAVINST 5000.49A Integrated Logistics Support (ILS) in the Acquisition Process

SECNAVINST 5216.5D Department of the Navy Correspondence Manual

SECNAVINST 5239.3 NAVAIR Information Assurance Workforce Improvement Program

Systems Engineering Technical Review Process

* Note: This standard establishes the essential requirements and reference documents applicable to the preparation and revision of engineering drawings and associated lists. In general terms of addressing the subject area of engineering drawing practices, this standard shall be used in close conjunction with ASME Y14.24-1999, ASME Y14.34-2008, and ASME Y14.35M-1997.

3.2 Government Provided Drawings: The Government will provide the following drawings, the revision level and effective date in effect on the date of contract award or at exercise of option. Documentation will be provided based upon the ship class of the requirement.

· General Arrangements, Top Side Configuration

· Guided Missile Destroyer, DDG 51 Class, Radio Communications Inter-Space Block Diagram

· Guided Missile Destroyer, DDG 51 Class, Communication Center and Transmitter Room Space Arrangement of Equipment Envelopes

· Guided Missile Destroyer, Radio Communications Intra-Space Cable Block Diagram

· Guided Missile Destroyer, Communications Center and Transmitter Room Arrangement of Equipment

4.0 REQUIREMENTS

4.1 Engineering Services:

Engineering CLINs:

Labor
0110
0210
0310
0410
0510
0610
0710
0810
0910
ODC
0111
0211
0311
0411
0511
0611
0711
0811
0911
Data
0182
0282
0382
0482
0582
0682
0782
0882
0982

Engineering Funding Types: SCN The contractor shall provide support services to the Government in the following: engineering research and development, technical documentation review and development, system evaluation, and technical services to research, evaluate, and develop design change documentation and proposals for system upgrades to the ship class RCS. All drawings and technical documentation from the previous RCS will be provided by NAWCAD.

(Note: Drawings shall meet the requirements of DoD-D-1000, MIL-STD-100E, ASME Y14.24M, ASME Y14.34M, and ASME Y14.35M as applicable. Engineering drawings shall be in AutoCAD, CV CADD, CATIA, and/or ASCII format and shall be Initial Graphics Exchange Specification (IGES) compatible.)

Elements of this tasking include but are not limited to the following:

4.1.1 Systems Engineering: The contractor shall provide engineering and technical support services to develop and upgrade the ship class RCS design including but not limited to:

4.1.1.1 Review the design documentation for the previous RCS. This documentation contains all of the technical documentation to fully define the RCS, including; Cable Block Diagrams, Cable Running and Routing Sheets, Space Arrangement Drawings, Equipment Technical Manuals, equipment Outline and Installation Drawings.

4.1.1.2 Within the Turnkey Process, the Navy has reserved Not-to-Exceed (NTE) Equipment Envelopes on the ship (ref. the Turnkey Management Plan, Attachment 6). Equipment Envelopes are the physical and functional specifications of equipment which cannot be exceeded. These include, but are not limited to:

· Size of equipment (height, width, and depth)

· Weight

· Amount of power consumed and heat produced

· Maintenance and operation access

Equipment Envelopes details will be provided by NAWCAD to the contractor. The contractor shall provide support services under this tasking including but not limited to:

4.1.1.2.1 Review individual system and equipment changes from the previous RCS.

4.1.1.2.2 Research and evaluate equipment parametric data and compare to the established NTE envelopes.

4.1.1.2.3 Determine if new sub-systems or equipment will remain within the NTE envelopes parameters.

4.1.1.2.4 Assist in developing impact assessments for sub-systems or equipment that do not remain within the NTE envelopes.

4.1.1.3 Review and provide comments on the phased Government Furnished Information (GFI) delivery schedule. Determine the impact of new equipment and systems on the phased GFI and submit review comments. (CDRL E001)

4.1.1.4 Research an automated test equipment (ATE) Stage 2 test capability for RCS equipment and investigate new technology to improve testing of the RCS and associated equipment. Assist in developing ATE Stage 2 test procedures. Stage 2 testing defined in NAVSEA T9050-AA-DIR-010/AEGIS, Rev. G. or current version, as Installation and Inspection Tests. (CDRL E002)

4.1.1.5 Investigate new technology to improve testing of the RCS and associated equipment.

4.1.1.6 Research, and recommend revisions, to systems, sub-systems, or equipment deficiencies that affect the RCS. Provide technical reports detailing these deficiencies and recommended resolutions. (CDRL E003)

4.1.1.7 Research feasibility of proposed design changes to the RCS. Determine extent of impacts for these proposed changes, including impacts to NTE design parameters.

4.1.1.8 Prepare operational impact analyses of proposed design changes. Analysis should include, but is not limited to, radio circuit quantities, types and setups, operator positioning, and equipment ergonomics.

4.1.1.9 Conduct research on ships specifications to validate proposed changes will meet specifications.

4.1.1.10 Provide reports and recommendations based on the results of paragraph 4.1.1.9 and impact assessments. (CDRL E004)

4.1.1.11 Perform the systems engineering necessary to implement directed changes to the RCS. Research the requirement; evaluate the availability of sufficient data to complete design; participate in government led technical reviews; conduct NTE budget study to ensure parametric values are not exceeded; develop system design packages, reports, and recommendations as a result of these studies and evaluations. (CDRL E005)

4.1.1.12 Conduct research and assess potential applications of emerging technologies to the RCS. Identify and evaluate the suitability of commercial-off-the-shelf (COTS)/non-developmental-item (NDI) equipment to satisfy RCS functional requirements.

4.1.1.13 Evaluate deficiencies, including environmental considerations of COTS/NDI equipment candidates and propose resolutions. (CDRL E006)

4.1.1.14 Conduct performance testing of COTS/NDI equipment to evaluate its compliance with performance specifications and to assess its interoperability within the RCS. (CDRL E007)

4.1.1.15 Attend conferences and meetings to exchange programmatic information related to the RCS. Provide meeting/conference minutes and respond to action items. (CDRL E008)

4.1.1.16 Prepare a Quarterly Consolidated Engineering Services Report detailing engineering tasking accomplishments during the period. (CDRL E009)

4.1.1.17 Assist in developing baseline equipment configuration documents to track RCS baseline configuration history. Typical data included in documents would be equipment nomenclatures and variants, software and firmware versions, and physical layouts. (CDRL E010)

4.1.1.18 Review baseline equipment configuration documents to ensure RCS baseline configuration history accuracy.

4.1.1.19 Maintain baseline equipment configuration documents to track RCS baseline configuration history.

4.1.1.20 Assist in developing technical data inputs defining RCS changes that will be utilized for the submission of RCS design changes to PEO Ships or, as appropriate, other PEOs. (CDRL E011)

4.1.1.21 Research available software used for automated testing (i.e., Automated Cable Tester, Computer Controlled Equipment Testing (CCET), Stage 2 ATE, etc.).

4.1.1.22 Assist in developing new or revising available software used for automated testing (i.e. Automated Cable Tester, Computer Controlled Equipment Testing (CCET), Stage 2 ATE, etc.).

4.1.1.23 Test software used for automated testing (i.e. Automated Cable Tester, Computer Controlled Equipment Testing (CCET), Stage 2 ATE, etc.).

4.1.1.24 Conduct 2-dimensional and 3-dimensional software modeling of the RCS. Modeling will include the RCS compartment as well as individual equipment located within the RCS.

4.1.1.25 Utilize the models generated in paragraph 4.1.1.24 to analyze the RCS for space optimization and ergonomics.

4.1.1.26 Research existing software applications to automate system design (e.g. cable routing optimization, antenna coupling, antenna range prediction).

4.1.1.27 Revise software applications identified in paragraph 4.1.1.26 to optimize utilization in system design.

4.1.1.28 Prepare technical briefs and presentations to support program reviews conducted by the Government. These reviews typically occur every 2 months and cover the current status of all aspects of the Engineering effort.

4.1.2 RCS Technical Data and Documentation: The contractor shall provide technical and support services for the development, validation, and correction of technical data and documentation required to define the RCS. This data and documentation will be utilized by the shipbuilders to prepare the ship for installation of the RCS. The contractor shall provide support services in the following tasks including but not limited to:

4.1.2.1 Prepare 3-D room arrangement drawings depicting the RCS equipment and equipment cabinets, and annotate to reflect parametric values such as size, weight, center-of-gravity, and cooling requirements. (CDRL E012)

4.1.2.2 Research detailed electrical/mechanical Installation Requirement Drawings (IRDs) defining equipment and equipment cabinets within the RCS.

4.1.2.3 Assist in developing detailed electrical/mechanical Installation Requirement Drawings (IRDs) defining equipment and equipment cabinets within the RCS. (CDRL E012)

4.1.2.4 Review Installation Requirement Drawings (IRDs) for Program of Record (PoR) systems within the RCS to determine impacts to overall RCS design. (CDRL E013)

4.1.2.5 Assist in developing Outline and Installation Drawings for free-standing equipment or cabinets for which no IRDs are available. (CDRL E012)

4.1.2.6 Assist in developing and maintaining the drawings to be delivered to the shipbuilder to prepare the ship and install the system within the Radio compartment on the ship. These drawings shall be provided to the shipbuilders based on the Phased GFI delivery schedule. (CDRL E012) This delivery schedule shall be provided when approved. A Preliminary and Final version of each drawing shall be developed and delivered. A list of deltas between the Preliminary and Final version of each drawing shall be maintained. (CDRL E013). A typical list of drawings required to define the RCS includes but is not limited to:

· Preliminary/Final Outline and Mounting of Method Mounted Equipment Drawings

· Preliminary/Final Cabinet Foundation Outline and Mounting Drawings

· Preliminary/Final 60/400 Hz One-Line Power Diagrams

· Preliminary/Final System Main Cable Routing Sheets

· Preliminary/Final IAF Backplane Drawings

· Preliminary/Final Intra-Compartment/Inter-Cabinet Cable Block Diagrams

· Preliminary/Final Intra-Compartment/Inter-Cabinet Cable Running Sheets

· Preliminary/Final Intra-Compartment/Intra-Cabinet Cable Block Diagrams

· Preliminary/Final Intra-Compartment/Intra-Cabinet Cable Running Sheets

· Preliminary/Final Space Arrangement Drawings

4.1.2.7 Assist in developing and maintaining the RCS contractual drawings to depict the design of the RCS that reaches outside the Radio compartment on the ship. Evaluate and update these drawings by incorporating approved design changes directed via the Configuration Control Baseline Implementation Letter (CCBL). The CCBL implementation will occur twice a year. (CDRL E012) A typical list of these drawings includes but is not limited to:

· Inter-Compartment Cable Block Diagram

· Topside Antenna and Equipment Arrangements Drawings

4.1.2.8 Assist in developing and maintaining a government accessible database of all RCS technical data and GFI, including drawings, technical manuals, test procedures and other technical documentation for use by program participants. Data and documentation will be stored in electronic format.

4.1.2.9 Assist in developing a list of all RCS equipment that does not have a standard Navy technical manual.

4.1.2.10 Use the list developed in 4.1.2.9 to research, develop, and/or revise technical manuals for all equipment used in the RCS that have not been documented as Navy standard. Manuals shall be prepared in accordance with current applicable Government specifications. (CDRL E015)

4.1.2.11 Research and respond to RCS related GFI deficiencies and inquiries from the shipbuilders. (CDRL E016)

4.1.2.12 Review and provide comments on ship class Schedules A through E:

Schedule A - Government Furnished Equipment

Schedule B - Government Furnished Technical Services

Schedule C - Government Furnished Information

Schedule D - Government Furnished Support Material

Schedule E - Government Furnished Installation Checkout (INCO) Spares

(CDRL E017)

4.1.2.13 Provide programming, software maintenance and hardware maintenance services for the RCS engineering databases. A typical list of databases includes but is not limited to:

· GFI Delivery Databases

· As-Built Cable Running Sheet Database

· Equipment Identification Number (EIN) Database

· AEGIS Equipment Configuration List (AECL) Database

· Invoice and Inventory Receipt Form Database

· Discrepancy Report Database

· Engineering Change Proposal (ECP) Database

· Drawing (e.g., design, fabrication, layout, method mounting, installation, etc.) Database

· Engineering Change Order (ECO) Database

· Inventory database

4.1.2.14 Assist in developing and maintaining a government accessible electronic based document control system for the controlled issue, routing, approval, recall and change of program documentation.

4.1.3 SSES Technical Data and Documentation: As part of the RCS resides in the Ships Signal Exploitation System (SSES) compartment, the contractor shall provide technical and support services for the development, validation, and correction of technical data and documentation required to define the SSES compartment. This data and documentation will be utilized by the shipbuilder to prepare the SSES compartment. The contractor shall provide support services in the following tasks including but not limited to:

4.1.3.1 Prepare 3-D room arrangement drawings depicting the SSES equipment and equipment cabinets, and annotate to reflect parametric values such as size, weight, center-of-gravity, and cooling requirements. (CDRL E012)

4.1.3.2 Research detailed electrical/mechanical IRDs defining equipment and equipment cabinets within the SSES.

4.1.3.3 Assist in developing detailed electrical/mechanical IRDs defining equipment and equipment cabinets within the SSES. (CDRL E012)

4.1.3.4 Review IRDs for Program of Record (PoR) systems within the SSES to determine impacts to overall RCS design. (CDRL E014)

4.1.3.5 Assist in developing Outline and Installation Drawings for free-standing equipment or cabinets in the SSES for which no IRDs are available. (CDRL E012)

4.1.3.6 Assist in developing and maintaining the drawings to be delivered to the shipbuilder to prepare the ship and install the system within the SSES. These drawings shall be provided to the shipbuilders based on the Phased GFI delivery schedule. (CDRL E012) This delivery schedule shall be provided when approved. A Preliminary and Final version of each drawing shall be developed and delivered. A list of deltas between the Preliminary and Final version of each drawing shall be maintained. (CDRL E014). A typical list of drawings required to define the RCS includes but is not limited to:

· Preliminary/Final Outline and Mounting of Method Mounted Equipment Drawings

· Preliminary/Final Cabinet Foundation Outline and Mounting Drawings

· Preliminary/Final 60/400 Hz One-Line Power Diagrams

· Preliminary/Final System Main Cable Routing Sheets

· Preliminary/Final IAF Backplane Drawings

· Preliminary/Final Intra-Compartment/Inter-Cabinet Cable Block Diagrams

· Preliminary/Final Intra-Compartment/Inter-Cabinet Cable Running Sheets

· Preliminary/Final Intra-Compartment/Intra-Cabinet Cable Block Diagrams

· Preliminary/Final Intra-Compartment/Intra-Cabinet Cable Running Sheets

· Preliminary/Final Space Arrangement Drawings

4.1.3.7 Assist in developing and maintaining the SSES contractual drawings to depict the design of the system that reaches outside the SSES compartment on the ship. Evaluate and update these drawings by incorporating approved design changes directed via the Configuration Control Baseline Implementation Letter (CCBL). The CCBL implementation will occur twice a year. (CDRL E012) These drawings include, but are not limited to:

· Inter-Compartment Cable Block Diagram

· Antenna and Equipment Arrangements Drawings

4.1.3.8 Maintain a government accessible database of all SSES technical data and GFI, including drawings, technical manuals, test procedures and other technical documentation for use by program participants. Data and documentation will be stored in electronic format.

4.1.3.9 Research and respond to SSES related GFI deficiencies and inquiries from the shipbuilders. (CDRL E016)

4.1.3.10 Review and provide comments on ship class Schedules A through E:

Schedule A - Government Furnished Equipment

Schedule B - Government Furnished Technical Services

Schedule C - Government Furnished Information

Schedule D - Government Furnished Support Material

Schedule E - Government Furnished Installation Checkout (INCO) Spares

(CDRL E017)

4.1.3.11 Provide programming, software maintenance, and hardware maintenance services for the SSES engineering databases. A typical list of databases includes but is not limited to:

· GFI Delivery Databases

· As-Built Cable Running Sheet Database

· Equipment Identification Number (EIN) Database

· AEGIS Equipment Configuration List (AECL) Database

· Invoice and Inventory Receipt Form Database

· Discrepancy Report Database

· Engineering Change Proposal (ECP) Database

· Drawing (e.g., design, fabrication, layout, method mounting, installation, etc.) Database

· Engineering Change Order (ECO) Database

· Inventory database

4.1.3.12 Assist in developing and maintaining a government accessible electronic based document control system for the controlled issue, routing, approval, recall and change of program documentation.

4.1.4 Integration Engineering: The contractor shall provide the following integration engineering support services to the Government including but not limited to:

4.1.4.1 Assist in developing or revising Stage 2, 3, 4, and 7 test procedures to reflect the applicable ship’s RCS (CDRL E018). Stage testing is defined in NAVSEA T9050-AA-DIR-010/AEGIS, Rev. G. or current version, as:

· Stage 1 - Material Receipt Inspection

· Stage 2 - Installation and Inspection Tests

· Stage 3 - Equipment Tests

· Stage 4 - Intrasystem Tests

· Stage 7 - Builder's and Acceptance Trials Tests

4.1.4.1.1 Stage Test Procedures will be developed or revised based on equipment Technical Manuals, Preventative Maintenance Schedules and IRDs. These documents will be provided with equipment.

4.1.4.1.2 Research and assist in developing test parameters for new equipment and sub-systems.

4.1.4.1.3 Identify test equipment required to complete Stage Testing.

4.1.4.1.4 During testing of the RCS, prepare Test Problem Reports (TPRs) for any Test Procedure deficiencies and provide recommended solutions to resolve TPR problems; revise Stage 2, 3, 4, and 7 test procedures as necessary. (CDRL E019)

4.1.4.2 The contractor shall provide engineering and technical services for integration design and installation of equipment and components into the RCS. Engineering support shall include but not limited to the following:

4.1.4.2.1 Resolve problems arising during RCS installation such as equipment mounting, mechanical interferences, and physical discrepancies.

4.1.4.2.2 Prepare engineering change requests as required to revise the RCS design documentation.

4.1.4.2.3 Provide an RCS Discrepancy Report detailing all technical information relative to discrepancies associated with the integration of any equipment, group, or system. (CDRL E003)

4.1.4.2.4 Recommend modifications to RCS hardware to correct design deficiencies discovered during RCS installation, test, operation, or maintenance.

4.1.4.2.5 Assist in developing and maintaining a Discrepant Material Report database for tracking corrective action for RCS hardware installation and integration problems. Required database elements include but are not limited to:

· Detailed information regarding the discrepancy

· Recommended course of action

· Final course of action.

4.1.4.2.6 Review the previous system’s RCS as-built drawings. As-Built drawings reflect the design of the RCS and consist of, but are not limited to, cable running sheets, cable block diagram and space arrangement drawings.

4.1.4.2.7 Assist in developing RCS as-built drawings reflecting the current system design and revise as required.

4.1.4.2.8 Assist in developing Work Instructions detailing the procedures to install RCS equipment in electronic equipment cabinets. (CDRL E020)

4.1.4.2.9 Validate and revise, or develop label drawings detailing equipment nomenclatures and/or part numbers and their location within the RCS. (CDRL E021)

4.1.4.2.10 Research mechanical interfaces, isolation systems, positive restraint systems, and hardware to ensure equipment integration will meet the shipboard environment.

4.1.4.2.11 Assist in developing mechanical interfaces, isolation systems, positive restraint systems, and hardware to ensure equipment integration will meet the shipboard environment.

4.1.4.2.12 Test mechanical interfaces, isolation systems, positive restraint systems, and hardware to ensure equipment integration will meet the shipboard environment. Testing includes, but is not limited to:

· MIL-STD-167 Vibration

· MIL-S-901 Shock

4.1.4.2.13 Assist in developing mechanical systems required to securely and safely transport the RCS equipment to the shipbuilder facilities. Systems shall include, but are not limited to, aluminum cabinet foundations, crates, protective equipment covers, and restraint devices to secure equipment in box trailers.

4.1.4.2.14 Research fixtures needed to replicate the connector panel layout on the back of each RCS cabinet, commonly referred to as Installation Aid Fixtures (IAFs). These IAFs are provided to the shipbuilder in advance of the equipment to expedite cable running and cable connectorization.

4.1.4.2.15 Assist in developing IAFs to match the current system configuration.

4.1.4.2.16 Evaluate IAFs and make recommendations for improvements if necessary.

4.2 Production

Production CLINs:

Labor
0120
0130
0220
0230
0240
0320
0330
0340
ODC
0121
0131
0221
0231
0241
0321
0331
0341
Data
0122
0132
0222
0232
0242
0322
0332
0342
Labor
0420
0430
0440
0520
0530
ODC
0421
0431
0441
0521
0531
Data
0422
0432
0442
0522
0532

Production Funding Types: SCN

4.2.1 Logistics: The contractor shall provide technical and logistics support services to identify equipment requirements, procurement of material, track acquisition status and equipment disposition. Material shall be provided in accordance with clause H-3 Restriction on the Direct Charging of Material NAVAIR 5252.242-9515 (Variation). The contractor shall provide the following support services including but not limited to:

4.2.1.1 Review Ships Project Directives (SPD) for accuracy and completeness. Provide comments and recommendations as required. Reviews typically occur quarterly. (CDRL P001)

4.2.1.2 Review documentation developed during the engineering process to identify the quantity, lead time, and schedule requirements for hardware, material, and spares required to support system Production. A list of typical documents to be reviewed includes but is not limited to:

· Cable Run Sheet

· Cable Block Diagrams

· Cabinet Integration Work Instructions

· Part Fabrication drawings

· Hardware Requirements List

4.2.1.2.1 Assist in developing overall list of hardware, material, and spares to be procured (CDRL P024).

4.2.1.2.2 Research availability and sources of required hardware, material, and spares.

4.2.1.3 Procurement of all hardware, material, and spares identified in paragraph 4.2.1.2.1.

4.2.1.4 Prepare Quarterly Hardware Procurement Status Report listing the hardware, material, and spares procured for each system. The report shall include: item nomenclature or designator, actual cost per item, quantity per system, total actual cost, and estimated delivery dates (CDRL P002).

4.2.1.4.1 Report all procurement actions associated with equipment status, including the latest projected delivery dates of equipment and material to destination. These reports shall identify various equipment categories, lead times, cognizant activities, NSN and non-NSN equipment, acquisition status, and overdue equipment. (CDRL P002)

4.2.1.5 Track material acquisition status from procurement initiation through delivery.

4.2.1.5.1 The contractor shall provide a government accessible electronic inventory system that shall track key information such as;

· Quantities

· Vendor Information

· Procurement and Receiving dates

· System assignments

· Cost

· Location

4.2.1.6 Track, receive, and deliver COMSEC equipment, IAW Naval Communications Security Material System EKMS-1B to the shipyards to meet government provided delivery schedule. Design includes, but is not limited to, 100 pieces of COMSEC equipment.

4.2.1.7 Perform semi-annual review of the spare parts report provided by the shipbuilder. Based on the RCS at the shipbuilder facility, determine if specific spare parts are no longer required or additional spare parts are required.

4.2.2 Logistics and Configuration Management: The contractor shall provide support services to logistics and configuration management. The contractor shall maintain a logistics and configuration control process at the integration level to identify changes to cabinet installation, design, and interoperability (e.g., cables, connectors, backshells, and interconnections) to ensure control of system integration. The contractor shall provide the following support services including but not limited to:

4.2.2.1 Perform Stage 1 receipt inspection on all materials, equipment, technical data, and support items received; affix inventory, accountability, and configuration management labels (barcodes) to all equipment in accordance with approved drawings.

Stage testing is defined in NAVSEA T9050-AA-DIR-010/AEGIS, Rev. G., as:

· Stage 1 - Material Receipt Inspection

· Stage 2 - Installation and Inspection Tests

· Stage 3 - Equipment Tests

· Stage 4 - Intrasystem Tests

· Stage 7 - Builder's and Acceptance Trials Tests

4.2.2.2 Assist in developing and maintaining an electronic tracking process to document the actions performed in 4.2.2.1.

4.2.2.3 Prepare configuration documentation for each RCS. The configuration document shall contain key information including but not limited to:

· Equipment nomenclatures, variants, and model numbers.

· Location of equipment within the RCS

· Software and Firmware versions

(CDRL P003)

4.2.2.4 Conduct physical configuration audits of each RCS, generate an RCS Inventory Report and forward the results to the Government sixty five days prior to each delivery of RCS equipment. (CDRL P004)

4.2.2.5 Update existing RCS configuration control documents based on system changes. (CDRL P005)

4.2.2.6. Procure integration materials (i.e., nuts, bolts, washers, cabling, connectors, backshells, ground straps, etc.) available through the Federal supply system; provide, through commercial sources, those integration materials approved in accordance with clause H-3 Restriction on the Direct Charging of Material NAVAIR 5252.242-9515 (variation) that are not available through the Federal supply system to support RCS equipment integration, assembly and installation.

4.2.2.7 Provide warehousing services for all hardware and materials. Service shall include but are not limited to:

· Assist in developing an efficient layout of the warehouse

· Adhering to industry safety standards

· Clear marking of areas and shelves

· Accepting incoming shipments

· Preparing outgoing shipments

4.2.2.8 Perform semi-annual inventory of hardware and material to support annual Defense Contract Management Command (DCMC) audits. (CDRL P006)

4.2.2.9 Assist in developing and maintaining logistics planning and documentation support for Non-Program of Record (Non-PoR) hardware procured by NAWCAD. Non-PoR hardware is hardware or hardware systems that do not have standard Navy logistics support. An RCS consists of, but is not limited to, five Non-Program of Record pieces of hardware. The contractor shall:

4.2.2.9.1 Research, develop, and maintain equipment ILS planning and management documentation including RCS Integrated Logistics Support Plans (ILSPs) (CDRL P023), Equipment Logistics Data Sheets (CDRL P007), and Allowance Parts Lists (APLs) (CDRL P007).

4.2.2.9.2 Assist in developing an ILS checklist for all system hardware to ensure standard Navy ILS documentation is available. (CDRL P008) If ILS documentation isn’t available notify the responsible activity of the deficiency.

4.2.2.9.3 Assist in developing Planned Maintenance System (PMS) packages including Maintenance Requirements Cards (MRCs) and Maintenance Index Pages (MIPs) for all NAWCAD Non-PoR procured equipment. (CDRL P009)

4.2.2.9.4 Coordinate logistics support for NAWCAD Non-PoR procured equipment with the Navy Inventory Control Point (NAVICP) and the Naval Sea Logistics Center (NAVSEALOGCEN) as well as provide support in managing material support dates (MSDs).

4.2.2.9.5 Provide Provisioning Technical Documentation (PTD) to NAVICP and NAVSEALOGCEN in Interactive Computer-Aided Provisioning System (ICAPS) format. (CDRL P010)

4.2.2.10 Review RCS ILS deficiency reports issued during Final Contract Trials (FCT) and the Board of Inspection and Survey (INSURV).

4.2.2.11 Prepare recommended responses for Government review to RCS ILS deficiency reports issued during Final Contract Trials (FCT) and the Board of Inspection and Survey (INSURV). (P011)

4.2.2.12 Assist in developing the AEGIS Acquisition Agent (AAA) ILS Summary quarterly. (CDRL P012)

4.2.3 Assembly, Test and Verification: The contractor shall provide technical support services to track, modify, stage, integrate, test, certify, and deliver RCS. In doing so, the contractor shall provide the following support services including but not limited to:

4.2.3.1 Identify required testing facility changes necessary to support the system as designed during the engineering process.

4.2.3.2 Assist in developing the Integrated Master Schedule (IMS) for the RCS production effort in accordance with DoD Integrated Master Plan and Integrated Master Schedule Preparation and User Guide, to include integration, testing, and delivery; plan and schedule major milestones. (CDRL P013)

4.2.3.3 Measure actual progress versus planned progress based on the (IMS), including cost and schedule performance, and report monthly to NAWCAD. Reports shall identify shortfalls and include plans for mitigation. (CDRL P014)

4.2.3.4 Submit a Quarterly Production Progress Report for each RCS which includes a synopsis of work accomplished within each task area during the preceding quarter, an explanation of problems encountered and proposed resolutions to the identified problems. (CDRL P015)

4.2.3.5 RCS Test Bed Installation: In accordance with installation documents developed during the engineering process, the contractor shall:

4.2.3.5.1 Prepare the NAWCAD designated test bed for the latest RCS configuration. Activities required include, but are not limited to: labeling and placement drawing updates, necessary changes and/or repairs to supporting infrastructure, movement of cable hangers, and removal of unnecessary items from previous system configuration, power panel changes to support power requirements.

4.2.3.5.2 Fabricate inter-compartment, intra-compartment/inter-cabinet, and intra-cabinet cables IAW ANSI/TIA-568 series (Structured Cabling Standards and Practices), to support RCS integration and testing. An RCS’s cabling consists of, but is not limited to, 3500 cables. Cable types consist of RF coaxial, multi-pin, power and fiber.

4.2.3.5.3 Install RCS cabling in the test bed to support RCS operation. Cabling is installed in numbered cable hangers located both under-deck and overhead. Cables will be routed through the numbered hangers in accordance with Cable Routing Sheets developed during the engineering process. Cables shall be installed in a neat and consistent manner.

4.2.3.5.4 Install mounting kits, hardware and cabling into cabinets in accordance with cabinet installation work instructions developed during the engineering process. Complete any modifications required to the cabinets to prepare for installation.