Instructions
| Instructions | |
| Contractor: | |
| 1 | On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated. |
| 2 | On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in. |
| 3 | Only one worksheet should be prepared for the base year period of performance and all option year periods of performance. A summary sheet of all periods of performance should be included at the bottom of this same worksheet. Do not use separate worksheets for option years. |
| 4 | Every worksheet should have items 1 and 2 completed. |
| 5 | The worksheets of the workbook should all be formatted for printing on the appropriate sized paper (either letter or legal sized). It may be formatted for either landscape or portrait. |
| 6 | Within the work sheet any cell colored "blue" contains a formula and should not be edited. |
| 7 | All dollar figures shall be fixed at two decimal places throughout the calculations. Values with additional decimal places shall not be used within any calculations. |
| 8 | The worksheet is arranged so the workforce being proposed for an entire period of performance is shown together, even though it will be separated by individual CLINS in Section B. When the numbers are carried to Section B, they will be the same as shown on the worksheet. |
| 9 | In column A, starting at row 5, the Government Labor Categories from the Government provided Information should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. In evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. The Offeror does not insert any subcontractor information in this section. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| 10 | In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces. |
| 11 | In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Offeror in this column. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas. |
| 12 | In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 13 | In column F, enter the name of the proposed individual for that position. |
| 14 | In column G: |
| (a) for the prime contractor, enter the unburdened labor rate for each individual | |
| (b) In Cell G52 on the Engineering tab, G51 on the Training tab, and G47 on the Production tabs, the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) In Cell G53 on the Engineering tab, G52 on the Training tab, and G48 on the Production tabs, the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. | |
| (d) In Cell G56 on the Engineering tab, G55 on the Training tab, and G51 on the Production tabs, the prime contractor should insert its overhead rate for work performed at the contractor's facility. | |
| (e) In Cell G57 on the Engineering tab, G56 on the Training tab, and G52 on the Production tabs, the prime contractor should insert its overhead rate for work performed at the Client/Government's facility. | |
| (f) In Cell G59 on the Engineering tab, G58 on the Training tab, and G54 on the Production tabs, the prime contractor should insert its G&A rate being applied. | |
| (g) for each subcontractor enter the fully burden cost including fixed fee associated with individual labor category for CLIN XX00 | |
| (h) In Cell G401 on the Engineering tab, G400 on the Training tab, and G396 on the Production tabs, the prime should insert the subcontractor handling charge, if any. | |
| (i) In Cell G404 on the Engineering tab, G403 on the Training tab, and G399 on the Production tabs, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor. | |
| (j) In Cell G405 on the Engineering tab, G404 on the Training tab, and G400 on the Production tabs,, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. | |
| (k) In Cell G428 on the Engineering tab, G427 on the Training tab, and G427 on the Production tabs, the prime should insert the material handling rate it is applying it to the ODCs, if any. If not applying a material handling, cell should be left blank. | |
| (l) In Cell G429 on the Engineering tab, G428 on the Training tab, and G428 on the Production tabs, the prime should insert the G&A rate it is applying to the ODCs, if any. If not applying a G&A rate, cell should be left blank. | |
| (m) In Cell G428 on the Engineering tab, the prime should insert the material handling rate it is applying it to NMCI, if any. If not applying a material handling, cell should be left blank. | |
| (n) In Cell G440 on the Engineering tab, the prime should insert the G&A rate it is applying to NMCI, if any. If not applying a G&A rate, cell should be left blank. | |
| 15 | In column H, and then similarly for Columns J, L, N, P, R, T, V, X and Z: |
| (a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00. Also make sure you plug in the hours for columns J, L, N and so on. | |
| (b) In Cell H52, J52, L52, N52, P52, R52, T52, V52 and X52 on the Engineering tab, H51, J51, L51, N51, P51, R51, T51, V51 and X51 on the Training tab, H47, J47, L47, N47, P47, R47, T47, V47 and X47 on the Production tabs, the prime contractor should insert the base its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) In Cell H53, J53, L53, N53, P53, R53, T53, V53 and X53 on the Engineering tab, H52, J52, L52, N52, P52, R52, T52, V52 and X52 on the Training tab, H48, J48 L48, N48, P48, R48, T48, V48 and X48 on the Production tabs, the prime contractor should insert the base its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (d) In Cell H56, J56, L56, N56, P56, R56, T56, V56 and X56 on the Engineering tab, H55, J55, L55, N55, P55, R55, T55, V55 and X55 on the Training tab, H51, J51, L51, N51, P51, R51, T51, V51 and X51 on the Production tabs, the prime contractor should insert the base its overhead rate is being applied to for work performed at the contractor's facility. | |
| (e) In Cell H57, J57, L57, N57, P57, R57, T57, V57 and X57 on the Engineering tab, H57, J57, L57, N57, P57, R57, T57, V57 and X57 on the Engineering tab, H56, J56, L56, N56, P56, R56, T56, V56 and X56 on the Training tab, H52, J52, L52, N52, P52, R52, T52, V52 and X52 on the Production tabs, the prime contractor should insert the base its overhead rate is being applied to for work performed at the Client/Government's facility. | |
| (f) In Cell H59, J59, L59, N59, P59, R59, T59, V59 and X59 on the Engineering tab, H58, J58, L58, N58, P58, R58, T58, V58 and X58 on the Training tab, and H54, J54, L54, N54, P54, R54, T54, V54 and X54 on the Production tabs, the prime contractor should insert the base its G&A rate is being applied to. | |
| (g) In Cell H404, J404, L404, N404, P404, R404, T404, V404 and X404 on the Engineering tab, H403, J403, L403, N403, P403, R403, T403, V403 and X403 on the Training tab, H399, J399, L399, N399, P399, R399, T399, V399 and X399 on the Production tabs, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor). | |
| (h) In Cell H405, J405, L405, N405, P405, R405, T405, V405 and X405 on the Engineering tab, H404, J404, L404, N404, P404, R404, T404, V404 and X404 on the Training tab, H403, J403, L403, N403, P403, R403, T403, V403 and X403 on the Production tabs, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any. | |
| (i) Under Other Direct Costs, the prime contractor should insert the Travel, Material and NMCI by CLIN. | |
| 16 | Column AD automatically calculated the total hours for all the CLINS. |
| 17 | Column AE is a summation of the costs. |
| 18 | If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 (which are rows 142 through 393) would be hidden. |
| 19 | When submitting this file, the instructions may be deleted. |
Engineering
| Engineering & NMCI | ||||||||||||||||||||||||||||||
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||||||||||||||||
| Period of Performance: | 10/1/14 - 9/30/23 (inclusive of options) | CLINS | Base -0110 | CLIN | Opt I - 0210 | CLIN | Opt II - 0310 | CLIN | Opt III - 0410 | CLIN | Opt IV - 0510 | CLIN | Opt V - 0610 | CLIN | Opt VI - 0710 | CLIN | Opt VII - 0810 | CLIN | Opt VIII - 0910 | XX10 | CLIN | XX11 | ||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | ||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Labor | Labor | SUM | Total | |||||||||||||||||||
| Cable Splicer | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Computer Programmer III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Configuration Management Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Data Entry Operator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Drafter III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Antenna) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Computer) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Electrical) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer III (Mechancial) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer IV (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineer IV (Systems) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering /Electronics Technician | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering Technician III (Quality Assurance Specialist) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Engineering/Electronics Technician (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field TechnicAan (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Field Technician (Senior) (Installation Supervisor) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Financial Analyst (Junior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Illustrator I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Illustrator II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Logistican II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Program Manager (Senior) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Anayst | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Project Manager | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Quality Control Inspector/Specialist | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Supply Technician (Clerk) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Librarian (Computer Data/Document Coordinator) | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| Word Processor II | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | 3 | $ - 0 | $ - 0 | |||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | 4 | $ - 0 | $ - 0 | |||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | 5 | $ - 0 | $ - 0 | |||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| subtotal | base | $ - 0 | 0 | base | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Overhead | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | Base | |||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| Total Labor | $ - 0 | |||||||||||||||||||||||||||||
| Subcontractors | ||||||||||||||||||||||||||||||
| Sub: 1: | ||||||||||||||||||||||||||||||
| Government Labor Category | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Cable Splicer | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Computer Programmer III | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Configuration Management Analyst | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Data Entry Operator II | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter I | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter II | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter III | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Antenna) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Computer) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Electrical) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Mechancial) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Senior) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Systems) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering /Electronics Technician | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician I | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III (Quality Assurance Specialist) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering/Electronics Technician (Senior) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field TechnicAan (Senior) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field Technician (Senior) (Installation Supervisor) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst (Junior) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator I | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator II | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Logistican II | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Program Manager (Senior) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Anayst | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Manager | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Quality Control Inspector/Specialist | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Supply Technician (Clerk) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Technical Librarian (Computer Data/Document Coordinator) | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| sub total on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 2: | ||||||||||||||||||||||||||||||
| Government Labor Category | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Cable Splicer | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Computer Programmer III | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Configuration Management Analyst | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Data Entry Operator II | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter I | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter II | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter III | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Antenna) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Computer) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Electrical) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Mechancial) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Senior) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Systems) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering /Electronics Technician | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician I | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III (Quality Assurance Specialist) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering/Electronics Technician (Senior) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field TechnicAan (Senior) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field Technician (Senior) (Installation Supervisor) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst (Junior) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator I | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator II | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Logistican II | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Program Manager (Senior) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Anayst | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Manager | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Quality Control Inspector/Specialist | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Supply Technician (Clerk) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Technical Librarian (Computer Data/Document Coordinator) | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| sub total on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 3 | ||||||||||||||||||||||||||||||
| Government Labor Category | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Cable Splicer | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Computer Programmer III | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Configuration Management Analyst | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Data Entry Operator II | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter I | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter II | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter III | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Antenna) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Computer) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Electrical) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Mechancial) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Senior) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Systems) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering /Electronics Technician | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician I | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III (Quality Assurance Specialist) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering/Electronics Technician (Senior) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field TechnicAan (Senior) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field Technician (Senior) (Installation Supervisor) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst (Junior) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator I | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator II | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Logistican II | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Program Manager (Senior) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Anayst | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Manager | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Quality Control Inspector/Specialist | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Supply Technician (Clerk) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Technical Librarian (Computer Data/Document Coordinator) | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 4: | ||||||||||||||||||||||||||||||
| Cable Splicer | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Computer Programmer III | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Configuration Management Analyst | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Data Entry Operator II | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter I | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter II | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter III | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Antenna) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Computer) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Electrical) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Mechancial) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Senior) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Systems) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering /Electronics Technician | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician I | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III (Quality Assurance Specialist) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering/Electronics Technician (Senior) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field TechnicAan (Senior) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field Technician (Senior) (Installation Supervisor) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst (Junior) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator I | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator II | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Logistican II | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Program Manager (Senior) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Anayst | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Manager | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Quality Control Inspector/Specialist | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Supply Technician (Clerk) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Technical Librarian (Computer Data/Document Coordinator) | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| sub total on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 5: | ||||||||||||||||||||||||||||||
| Cable Splicer | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Computer Programmer III | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Configuration Management Analyst | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Data Entry Operator II | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter I | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter II | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter III | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Antenna) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Computer) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Electrical) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Mechancial) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Senior) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Systems) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering /Electronics Technician | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician I | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III (Quality Assurance Specialist) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering/Electronics Technician (Senior) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field TechnicAan (Senior) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field Technician (Senior) (Installation Supervisor) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst (Junior) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator I | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator II | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Logistican II | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Program Manager (Senior) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Anayst | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Manager | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Quality Control Inspector/Specialist | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Supply Technician (Clerk) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Technical Librarian (Computer Data/Document Coordinator) | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| sub total on Sub 5 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 6: | ||||||||||||||||||||||||||||||
| Cable Splicer | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Computer Programmer III | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Configuration Management Analyst | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Data Entry Operator II | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter I | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter II | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Drafter III | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Antenna) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Computer) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Electrical) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer III (Mechancial) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Senior) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineer IV (Systems) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering /Electronics Technician | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician I | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering Technician III (Quality Assurance Specialist) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Engineering/Electronics Technician (Senior) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field TechnicAan (Senior) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Field Technician (Senior) (Installation Supervisor) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Financial Analyst (Junior) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator I | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Illustrator II | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Logistican II | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Program Manager (Senior) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Anayst | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Project Manager | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Quality Control Inspector/Specialist | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Supply Technician (Clerk) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| Technical Librarian (Computer Data/Document Coordinator) | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| 0 | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||
| not comparable | 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .