N00421-20-R-0142 CAS PMRF Helicopter Services PBWS Draft.pdf

PDF 318 KB Posted

Attached to
Contracted Air Services (CAS)Contracted Air Services (CAS) Hawaiian Operating Area Helicopter Services
Solicitation number
N0042121R0077
Issued by

About this file

This notice constitutes a request for information regarding contracted air services to support operations at the Pacific Missile Range Facility in Hawaii. The Naval Air Systems Command seeks to award an indefinite-delivery, indefinite-quantity contract for commercial helicopter services, including medium and heavy lift capabilities. Interested offerors must have the ability to provide target recovery, visual surveillance, transport of personnel and equipment, and special mission support. The anticipated contract would have a 4-year, 364-day ordering period with approximately 200 flight hours per year for medium lift helicopters and 175 hours for heavy lift. Responses to this request for information are due no later than May 7, 2020 and should address the offeror's qualifications and technical approach, as well as any concerns regarding the draft performance work statement. The notice also seeks industry feedback on appropriate contract line items and small business participation requirements.

View the file

Other files

File Type Posted
Attachment 1 Performance Work Statement (PWS)_Amend0001.pdf PDF
N0042121R0077_QandA_111821.pdf PDF
L-7 Vol 4 Price_Att_V2.xlsx XLSX spreadsheet
L-2 Vol2 T-1 CRM_V2.xlsx XLSX spreadsheet
N0042121R007700002_Conformed.pdf PDF
N0042121R0077_QandA_110421.pdf PDF
N0042121R007700002_Amendment.pdf PDF
N0042121R00770001_Amendment.pdf PDF
Attachment 1 Performance Work Statement (PWS).pdf PDF
N0042121R00770001_Conformed.pdf PDF
N0042121R0077_QandA_102721.pdf PDF
Industry Day Attendee List sam.gov.pdf PDF
L-7 Vol 4 Price_Att.xlsx XLSX spreadsheet
L-6 Airworthiness Checklist V2 Final.pdf PDF
L-1 Vol 1 ES Tables_Final.xlsx XLSX spreadsheet
L-4 Vol 3 PP1 PP Cont Data_Final.xlsx XLSX spreadsheet
L-3 Vol 3 PPQ_Final.rtf RTF text file
L-2 Vol2 T-1 CRM_Final.xlsx XLSX spreadsheet
Attachment 3 Quality Assurance Surveillance Plan.pdf PDF
Exhibit A CDRL A001-A013.pdf PDF
N0042121R0077_101321.pdf PDF
Attachment 2 DD254.pdf PDF
Attachment 1 Performance Work Statement (PWS).pdf PDF
Government Flight Representative (GFR) and Continued Airworthiness.pdf PDF
2021.05.18 PMA-226CAS_PMRF.HelicopterIndustryDayV5.pdf PDF
AirworthinessBrief N0042121R0077 Industry Day.pdf PDF
N0042121R0077 Q and A.pdf PDF
N0042121R0077 PWS.pdf PDF
N0042121R0077 Draft Sections.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED WORK STATEMENT (PBWS)

Distribution Statement A: Approved for Public Release Distribution Unlimited

1.0 BACKGROUND

Pacific Missile Range Facility (PMRF), Kauai, Hawaii (HI) has a requirement for commercial air support services in support of the PMRF range. Due to the Navy’s H-3 helicopters being removed from inventory, commercial assets replaced Military helicopters. Tasking for the commercial assets will include, but is not limited to, target recovery, visual surveillance, range clearing, transport of military/government personnel to/from ships or shore facilities, movement of hazardous material (ordinance), and when required, firefighting support. The contractor will provide flight crews with the skills required for the required tasking. In addition, during the standard missions the contractor will provide support to various Navy Fleet training requirements and modify the aircraft utilizing Federal Aviation Administration (FAA) Supplemental Type Certificate (STC) or Designated Engineering Representative/Designated Airworthiness Representative (DER/DAR) Airworthiness certification.

2.0 SCOPE

The contractor shall provide a wide variety of airborne capabilities, using privately owned and operated aircraft, to include, but not limited to, training assistance, supply, and support for shipboard and aircraft groups and personnel operating in the Hawaiian Operating Area (OPAREA). The contractor shall operate aircraft primarily from Barking Sands, Kauai, HI. However, from time to time aircraft basing may change due to emerging U.S. Navy requirements as they pertain to the OPAREA. The contractor shall be required to support deployments, which, however rare, can be expected to range from a few days to six weeks or more. Services furnished under this contract may include, but are not limited to, support of the U.S. Navy, other Department of Defense (DoD) departments, agencies and services, non-DoD Government agencies, and Foreign Military Sales (FMS) customers. This will be a “dry” contract. Except as provided elsewhere herein, the contractor shall not be expected to purchase fuel.

This contract requires a broad range of aircraft capabilities to meet mission requirements. The contractor will be required to provide commercial air support services inclusive of helicopters capable of lifting targets, such as the MK 30 Mod 1 Mobile Anti-submarine Warfare (ASW) Target, MK 46 torpedo and the MK 50 torpedo. These support services include, but are not limited to:

a. Target recoveries.

b. Visual surveillance and clearing range sections for mine drops, naval gunfire and other missions.

c. Search for marine mammals prior to an exercise or test.

d. Transport of personnel to/from in support of shipboard exercises.

e. Transport of government/military personnel to land-based facilities.

f. Transport of C-4 and similar explosives and associated equipment in the Hawaiian OPAREA.

g. Launch targets such as the MK 30 Mobile ASW target.

h. Firefighting utilizing the Bambi bucket (Government Furnished Equipment (GFE)).

i. Installation and use of the Extended Range Video System (ERVS).

j. FMS will be supported when tasked by PMRF range scheduler.

k. Research, Development, Test & Evaluation (RDT&E) missions will be supported, if required.

l. Provide technical expertise supporting test plan development.

m. Provide test plan analysis at the completion of test periods.

n. Support FMS/DoD customers with test planning and analysis, when required.

3.0 APPLICABLE DOCUMENTS

The Contractor shall utilize and adhere to the following documents and updates or revisions thereto, in satisfying the performance requirements of this Performance Based Work Statement (PBWS):

a. DoD 5220.22-M National Industrial Security Program Operation Manual (NISPOM), www.dss.mil

b. DoD 5500.7-R Joint Ethics Regulation (JER), www.defenselink.mil

c. SECNAVINST 3770.1C Use of Department of the Navy Aviation Facilities by other than United States

DoD Aircraft http://neds.daps.dla.mil

d. Air Force Instruction (AFI) 10-1002 Agreement for Civil Aircraft Use of Air Force Airfields https://www.e-publishing.af.mil/publishing.af.mil

e. AFI 10-1001 Civil Aircraft Landing Permits, https://www.e-publishing.af.mil/

f. Naval Operations Instructions (OPNAVINST) 3710.7

g. OPNAVINST 3100.8 Naval Air Training and Operating Procedures Standardization (NATOPS) General

Flight and Operating Instructions Deck Landing Operations by Civilian Helicopters with Civilian Pilots, https://www.secnav.navy.mil/doni/Directives/Forms/AllItems.aspx

h. NWP 6-02.1 Multiservice Air-Air, Air-Surface, Surface-Air Brevity Codes (United States Air Force (USAF) publication Air Force Joint Pamphlet (AFJPAM) 10-228) https://apps.dtic.mil

i. FXP-2 Fleet Exercise Publications - 2

j. FXP-3 Fleet Exercise Publications - 3

k. ATP -1B Allied Tactical Publication

l. Pacific Missile Range Facility Instruction (PMRFINST) 3710.11 series Air Operations Manual Pacific

Missile Range Facility Barking Sands

m. Naval Air (NAVAIR) 00-80T-122 Helicopter Operating Procedures for Air Capable Ships NATOPS

Manual, mynatec.navair.navy.mil

n. NAVAIR 00-80T-105 Carrier Variant CV NATOPS mynatec.navair.navy.mil

o. NAVAIR 00-80T-106 Landing Helicopter Assault (LHA)/ Landing Helicopter Dock (LHD)/ Landing

Platform Dock (LPD) NATOPS mynatec.navair.navy.mil

p. Naval Supply Systems Command (NAVSUP) PUB 505 Preparing Hazardous Material for Military Air

Shipments, http://adss.dau.mil

q. NAVAIR 00-80T-103 Aircraft Refueling for Naval Installations, mynatec.navair.navy.mil

r. NAVAIR 00-80T-113 Aircraft Signals, mynatec.navair.navy.mil

s. NAVSUP PUB 722 Consolidated Hazardous Materials Reutilization and Inventory Management Program

(CHRIMP) Manual, https://www.navsup.navy.mil/

t. Defense Contract Management Agency (DCMA)-MAN 8210-2

u. DCMA-INST 8210-1C Aircraft Operations Contractor’s Flight and Ground Operations, https://dcma.mil/policy

v. OPNAVINST 8000.16 series, Naval Ordnance Maintenance Management Program (NOMMP) https://www.secnav.navy.mil/doni/Directives/Forms/AllItems.aspx

4.0 REQUIREMENTS

4.1 Aircraft Readiness

This line item includes costs that the contractor will incur regardless of number of missions such as pilots, mechanics, managers, support personnel, Hull insurance, liability insurance, recurrent training, weather services, depreciation of the aircrafts, leasing etc. This price will include fixed cost burdened by the contractor.

The following costs shall not be included in the price of this line item:

A. Costs incurred by the contractor which are associated with the variable pricing for specific missions (Contract Line Item Numbers (CLINs) TBD) e.g. Parts – airframe, avionics, engine consumables, engine restoration costs, landing/parking fees, inspection fees, dynamic components, life time limited parts, tools, passports, visas, shipment or trans-shipment of aircraft, supplies, etc.

B. Costs for flights such as, but not limited to, maintenance test flights, the ferrying/transporting of personnel, aircraft or equipment to and from maintenance facilities, or to train aircrew, are to be included in the variable unit price and are not allowable as a direct (fixed) cost under Aircraft Readiness. Fuel costs shall not be charged to this CLIN.

C. Travel and Per Diem costs associated with deployment costs will be cost reimbursable under the Travel/Per Diem line item and be reimbursed in accordance with the Joint Travel Regulation (JTR).

D. Aircraft Modification costs associated with the installation of GFE equipment that is required by the fleet or PMRF to support a mission. Such costs shall be included under the Aircraft Modification line item TBD (Cost Plus Fixed-Fee (CPFF) / Operations & Maintenance, Navy (O&M,N)).

4.2 Medium Lift Capability Helicopter (Firm Fixed Price (FFP) /O&M,N) CLIN TBD.

4.2.1 Basic Mission

The contractor shall utilize a medium lift capability helicopter to provide Target recoveries and Visual Surveillance/Range Clearance/Sea State.

4.2.2 Target Recoveries

The contractor shall recover various weapon systems, such as, but not limited to MK 46 Torpedo, MK 50 Torpedo, MK 54 Torpedo, BQM 74 Drone using target recovery pole or GFE (target recovery basket). The contractor shall be capable of performing these recoveries in sea states up to prescribed equipment recovery limitations as defined in user manuals. A typical profile includes, but is not limited to: Proceed to recovery point, up to 75 nautical miles (NM) from base at 1,000 feet mean sea level (MSL) and perform search and recovery (up to 45 minutes on station Hovering Out of Ground Effect (HOGE)). When recovery is complete, proceed to drop off area. Return to base.

4.2.3 Visual Surveillance/Range Clearance/Sea State

The Contractor shall utilize the medium lift capability helicopter to visually clear sections of the range for mine drops, naval gunfire, and other missions. The contractor shall utilize the medium lift capability helicopter to perform an area search around a specified latitude/longitude for vessel as well as mammals. The contractor shall utilize the medium lift capability helicopter to visually clear the range of all unauthorized surface and air contacts.

Contact with air and surface units is required by using Very High Frequency (VHF) radio (Marine Band channel 16 or VHF/Ultra High Frequency (UHF) (emergency frequencies). The contractor shall use the aircraft to assess sea state conditions prior to weapons and/or targets being used on the range. A typical mission shall include, but is not limited to the following: transit up to 100 nm offshore, remain on station for 1 hour, and transit back to base.

4.2.4 Transport Missions

The contractor shall provide ship and shore transport missions, which may include the following:

A. Transport C-4, similar explosives, and associated equipment and handling devices/systems to and from various locations in the OPAREA.

B. Transport passengers/equipment to give aerial tours of PMRF facilities and outlying areas. Some outlying areas have unprepared landing surfaces comprised of grass and dirt. The helicopter will be required to carry up to six passengers plus crew and shall have Individual Communication System (ICS) capability for all passengers.

C. Transport parts and passengers to U.S. Navy certified ships, foreign Navy ships, the Mobile At Sea Sensors (MATSS) barge, and other mobile platforms. Ships may also request passenger transport for medical emergencies, emergency leave, and logistics. The transit distance may be as much as 110 nm from base.

Pilots must maintain a deck landing qualification status. The Navy will provide training and aircrew certification of Contracted Air Services (CAS) Helicopters for these deck landings in support of paragraphs

4.2 and 4.3. The contractor shall transport high-ranking officials for area tours of PMRF facilities and out-lying areas, when required.

D. Transport up to five Explosive Ordnance Disposal (EOD) personnel with C-4 explosives. The helicopter will embark EOD personnel onto the target (ship) via hoist and extract them when they have set explosive charges on the target. The helicopter will then transit back to the base.

4.2.5 Extended Range Video System (ERVS)

Periodically, PMRF missions will require the use of ERVS to link video back to the base. ERVS consists of a 28V DC powered portable camera video system with an externally mounted antenna which is approximately 3”Hx5”L (blade type antenna). There are two ERVS systems for installation on heavy and medium lift aircraft. The ERVS systems will be provided to the Contractor as GFE. The Contractor shall install the ERVS systems on the aircraft in accordance with (IAW) NAVAIR specifications. The ERVS camera weighs approximately 45 pounds and will be operated by a Government provided single camera operator. A typical mission includes, but is not limited to: transit a maximum of 100 nm from base, continuous video recording of the surface target during daylight hours up to the mission length, and transit back to base.

4.2.6 Medium Lift Performance Requirements

The contractor shall provide a medium lift capability helicopter meeting the following performance requirements:

Table 4.2.6

4.2.7 Medium Lift Simultaneous Presentation Requirements

The Contractor shall provide medium lift aircraft for a simultaneous presentation as identified in the matrix below.

Table 4.2.7

MEDIUM LIFT - SIMULTANEOUS PRESENTATION REQUIREMENTS

CLINs Minimum Number of Aircraft Required for Simultaneous

Presentation

Permanent Operating Site

TBD and TBD 1 Barking Sands, Kuwaii, HI

4.3 Heavy Lift Capability Helicopter (FFP/O&M,N) CLINs TBD

4.3.1 Basic Mission

The Contractor shall provide Target Launches/Recoveries, Firefighting, and Transport Missions (both ship and shore).

MEDIUM LIFT - PERFORMANCE REQUIREMENTS

Speed/Altitude: 100 Knots Clean configuration Service Ceiling: 10,000 feet mean sea level (MSL), Ability to hover @ 1,000 feet at Maximum Take Off

Weight (MTOW).

Time On Station: Minimum 1.0 hour loiter at up to 100 Nautical Mile (NM) from base.

Configuration/ Special Equipment:

Equipped and configured in accordance with paragraph 7.0

Substitution of Aircraft: With advanced Scheduling Officer (SO) approval, Heavy Lift aircraft may be substituted for Medium Lift missions; however, payment will be at the Medium Lift rate.

Hoisting Capability: 600 pounds (lbs.) up/300 lbs. down External Lifting Capacity:

Minimum of 1000 lbs.

Internal Capacity: Minimum 6 passenger capability plus crew; Medical Evacuation (MEDEVAC) litter capability (1 litter) (with ICS capability for all)

Range: 110 NM

4.3.2 Target Recoveries

The Contractor shall recover various weapon systems such as, but not limited to, MK 30 ASW Target, (launch and recovery), MK 48 Torpedo, BQM 34 Drone using target recovery pole or GFE, target recovery basket. These recoveries must be able to be performed in sea states up to the prescribed equipment recovery limitations. A typical profile includes but is not limited to: Proceed to recovery point, up to 75 NM from base at 1,000 feet MSL and perform search and recovery (up to 45 minutes on station HOGE). When recovery is complete, proceed to drop off area. Return to base.

4.3.3 Firefighting

The Contractor shall provide firefighting at Barking Sands (PMRF), a Bambi Bucket (provided as GFE) equipped helicopter is required during Testing/Evaluation (T/E) missile events. The helicopter may be the first firefighting asset on scene in the event of a fire at the missile launch pad, or in the event of an anomaly, a fire in the surrounding on/off base area. A firefighting mission may include, but is not limited to, transit to a water source with a Bambi-bucket, fill to its 324-gallon capacity (2820 pounds), transport it back to the fire source and deliver/drop water from a safe altitude and repeat as necessary.

4.3.4 Launch Targets

The Contractor shall launch MK 30 (ASW Target) (or other Navy targets) using GFE.

4.3.5 Transport Missions

The Contractor shall perform transport missions may include any of the following: Transport C-4 and similar explosives and associated equipment and handling devices/systems to and from various locations in the OPAREA.

Transport passengers/equipment to give aerial tours of PMRF facilities and outlying areas. Some outlying areas have unprepared landing surfaces comprised of grass and dirt. The helicopter will be required to carry up to eight passengers plus crew with ICS capability for all passengers. Transport parts and passengers to U.S. Navy certified ships, foreign Navy ships, the MATSS barge, and other mobile platforms. Ships may also request passenger transport for medical emergencies, emergency leave, and logistics. The transit distance may be as much as 125 nm from base. Pilots must maintain a deck landing qualification status. The Navy will provide training and aircrew certification of CAS Helicopters for these deck landings. The possibility exists to transport high-ranking officials for area tours of PMRF facilities and out-lying areas.

4.3.6 Heavy Lift Performance Requirements

The contractor shall provide a heavy lift capability helicopter meeting the following performance requirements:

Table 4.3.6

HEAVY LIFT - PERFORMANCE REQUIREMENTS

Speed/Altitude 100 knots clean configuration Service Ceiling: 10,000 feet MSL Ability to hover @ 1,000 feet @ MTOW.

Range: 220 NM Time On Station: Minimum 2.0 hour loiter at up to 100 NM from base.

Configuration/ Special Equipment:

Equipped and configured in accordance with paragraph C-7.

Hoisting Capability 600 lbs. up/300 lbs. down External Lifting Capacity

Minimum of 3,500 lbs.

Internal Capacity 2,000 lbs. capacity (including a minimum of 8 passengers); re-configurable for internal loads

4.3.7 Heavy Lift Simultaneous Presentation Requirements

The Contractor shall provide heavy lift aircraft for a simultaneous presentation as identified in the matrix below.

Table 4.3.7

HEAVY LIFT - SIMULTANEOUS PRESENTATION REQUIREMENTS

CLINs Minimum Number of Aircraft required for simultaneous presentation

Permanent Operating Site

TBD and TBD 1 Barking Sands, Kauai, HI

4.3.8 Target Recovery Mission with Pole

See description of services in the description of either Medium or Heavy Lift aircraft target recoveries.

4.3.9 Target Recovery Mission with Basket

See description of services in the description of either Medium or Heavy Lift aircraft target recoveries.

4.3.10 Firefighting Mission

See description of services in the description of Heavy Lift aircraft.

4.3.11 Launch Mission

See description of services in the description of Heavy Lift aircraft.

4.3.12 Transport Missions

See description of services in the description of medium and heavy lift.

4.4 Travel /Per Diem (COST/O&M,N)

A. Travel. Travel will be required in support of Program Management Reviews (PMRs).

B. Travel Claims. Travel claims (invoice voucher) shall be submitted to the Contracting Officer’s

Representative (COR) within 15 days of the completion of travel.

4.5 Material/Shipping (COST/O&M,N)

A. Material included under this line item shall not be included in the material priced under the Air Readiness line item or in the flight minute unit price, and is necessary to perform the services specified in Section C. Expendable material costs for items such as office supplies and tools of the trade shall be absorbed by the contractor in its overhead rate. The only allowable charges, for which a handling rate at the percentage identified under CLIN TBD will be applicable, are material and shipping costs incurred by the contractor at the direction of the COR. The contractor shall be reimbursed for Material/Shipping costs, authorized by the COR in writing, based on actual payment for material/shipping procured directly for the contract. The material handling rate shall not be applicable to this CLIN for other charges such as airport use charges; landing fees; and the cost of fuel when Government provided fuel is not available. The handling rate percentage shall not include profit or any other markups and upon commencement of the contract, the handling rate percentage shall be considered a final "fixed" rate percentage for all contract periods. The contractor's invoices shall include receipts or other evidence substantiating actual costs incurred for authorized material/shipping.

Any additional material will be identified under a separate delivery/task order and shall be negotiated separately. Travel Claims. Travel claims (invoice voucher) shall be submitted to the COR within 15 days of the completion of travel.

B. With prior COR approval, costs for obtaining or modifying STC not listed elsewhere in the contract are allowable costs under this line item. The Government will receive unlimited right as defined by Defense Federal Acquisition Regulation (DFAR) 252.227-7013 for any STC or STC modification developed and reimbursed under this contract.

C. Property procured under this line item shall become property of the Government subject to the Government property clause in this contract.

4.6 Aircraft Modifications (CPFF/O&M,N)

A. The unit price shall include the one time installation cost for the 28V Direct Current (DC) powered portable camera video system onto each aircraft being used under this contract. The portable camera video systems will be provided by the Government for installation on the aircraft.

B. The contractor shall perform installation of GFE or Contractor Furnished Equipment (CFE) equipment required by the fleet or PMRF to support a mission. Costs will include engineering, installation labor and parts, cost of obtaining a STC, DER, or Original Equipment Manufacturer (OEM) airworthiness certification.

C. The contractor shall perform aircraft modifications, which includes, but is not limited to, internal modifications such as special provisioning/antennas or equipment. Final modifications are approved by signed FAA Form 8110-3 and FAA Form 337. The price for these services shall be negotiated. (Exhibit A, CDRL TBD)

5.0 OPERATION OF AIRCRAFT

A. NAVAIR Government Flight Representative (GFR) and/or Ground Government Flight Representative (GGFR) and/or their designated representative will perform, at minimum, a semi-annual inspection of aircraft operations, flight crew certification/currency and qualifications and aircraft maintenance procedures IAW DCMA 8210.1C, Change 1 and will validate contract, flight, and ground procedure compliance. The first inspection will be conducted within 6 months of the contract award. These inspections will be under the general guidelines of the procedures contained in the Defense Contract Management Agency (DCMA) Tri-Service Instruction 8210.1 series entitled “Contractor's Flight and Ground Operations” in effect on the date of contract award. This will be applicable to the primary contractor and any sub-contractors. (Exhibit A, CDRL TBD)

Note: When the requirements of this Performance-Based Statement of Work (PBWS) exceed the minimum requirements of any portion of 14 Code of Federal Regulation (CFR) referenced herein, this PBSOW takes precedence. The contractor shall install and maintain all avionics systems in accordance with the manufacturer’s specification as delineated in 14 CFR § 43.

B. Definitions contained in 14 CFR §1 apply to all situations and conditions related to flight operations, aircraft maintenance, and flight crew certifications and qualifications, except as noted or defined otherwise herein.

C. For the entire duration of this contract, all aircraft shall have an active FAA airworthiness certificate applicable to the type of tasks that will be performed under this contract. In particular, for aircraft operations to which 14 CFR §135 and §133 apply; aircraft shall have an FAA Standard Category airworthiness certificate.

D. The contractor shall maintain the number of aircraft seats within the contractor’s commercial-derivative aircraft in accordance with 14 CFR §135. Former military aircraft must be maintained under an FAA approved maintenance plan.

E. Installation and infrastructure modifications and flight approvals to carry any external stores must be FAA certified. The contractor shall provide applicable DER and DAR approval.

F. All aircraft shall be operated in accordance with all applicable Government aeronautical regulations, including United States Navy (USN), USAF, and local military flying directives, including foreign government requirements. The contractor shall comply with all DoD requirements for operation of civil aircraft in support of military operations. Submit DD Form 2400 - Civil Aircraft Certificate of Insurance, DD Form 2401-Civil Aircraft Landing Permit, and DD Form 2402-Civil Aircraft Hold Harmless Agreement (recipient TBD at contract award). These agreements and any other that may be specified must be kept current during the entire period of operations under the contract.

G. During Civil Aircraft Operations (CAO), government or contractor personnel providing direct support to a mission may fly aboard the aircraft in furtherance of their official duties. During Public Aircraft Operations (PAO), only the minimum required crewmembers may be onboard the aircraft unless GFR approval has been received for the additional crewmember. Passengers are not permitted on PAO flights.

6.0 EQUIPMENT REQUIREMENTS

A. All aircraft shall meet each of the requirements and the additional standards listed below in addition to equipment requirements in Office of the Chief of Naval Operations Instruction

(OPNAVINST) 3100.8 DECK LANDING OPERATIONS BY CIVILIAN HELICOPTERS

WITH CIVILIAN PILOTS ON U.S. NAVY VESSELS.

(1) Aircraft shall be equipped with communications and navigation capability as required. The contractor shall comply with FAA standards.

(2) Complete set of wiring and schematic diagrams covering all equipment installed onboard the aircraft shall be maintained by the contractor IAW publications identified in Paragraph 3 References. The contractor shall make all diagrams available at the home base and at permanent operating sites and available for Government inspection and use at any time.

(3) All GFE installed (e.g.,, internal wiring, and umbilical wiring to external stores) on the aircraft are the contractor’s responsibility and require FAA documented approvals. FAA Documentation must be provided to the COR by the contractor. Post installation maintenance and upgrades of these GFE items are also the responsibility of the contractor.

B. Additional Standards

(1) The contractor shall safeguard mission specific materials to include classified mission brief sheets at all times IAW DoD 5220.22-M and any applicable local instructions.

(2) The contractor shall provide and have on board, a complete and current set of aeronautical charts, and approach plates covering the entire operating area.

(3) The contractor shall provide aircraft equipped with approved life preservers for over water flights in accordance with 14 CFR § 135.167. Additionally, the contractor shall provide all aircraft equipped with emergency aircraft flotation gear (pop-out) or standard flotation gear (fixed floats).

(4) The contractor shall provide aircraft (whether single or dual piloted for the DoD) equipped with the following navigation and communication equipment:

a) Directional gyro.

b) Artificial horizon.

c) Rate of turn indicator.

d) Vertical speed indicator.

e) Instrument Flight Rules (IFR) capable Global Positioning System (GPS),

f) An Emergency Locator Transmitter (ELT).

g) At least one UHF radio.

h) One VHF radio with aviation marine band capability.

i) Tactical Air Navigation (TACAN)

j) All aircraft shall be 14 CFR IFR equipped and maintenance current for the type of aircraft being operated.

C. The contractor’s aircraft, aircrew, and operations shall comply with all requirements for the state or jurisdiction of registry of the aircraft and the state where operations take place in order to perform all services required under this contract. This is in addition to any additional requirements imposed by the Air Mobility Command (AMC) for utility and transport operations. Where the requirements of the PBWS exceed the requirements of the state or jurisdiction of registry, the state where operations take place, or the AMC requirements, the requirements of the PBWS take precedence. Required crewmembers shall wear protective clothing and equipment to reduce the chance of injury or death in survivable accidents. This clothing and equipment should include protective helmets, flame- and heat-resistant flight suits, and protective footwear.

7.0 PERSONNEL

A. Personnel Qualifications

(1) The contractor's Pilot In Command (PIC) has the final authority to determine whether an aircraft is safe for flight, whether to launch or terminate a mission, and to deny boarding to anyone. PICs in Medium and Heavy Lift aircraft shall have previous military helicopter aircraft pilot qualifications, such as, but not limited to, shipboard landings, launch/recovery of targets and weapons, or a minimum of one year’s experience in flying helicopters to provide military training similar to this effort.

(2) The contractor shall ensure that all crewmembers are familiar with mission responsibilities, contract requirements, course rules for aircraft operations at airfields throughout the Hawaiian Islands, and applicable instructions for the launch and recovery of weapons and targets.

(3) Prior to the commencement of all missions the contractor’s pilots and aircrew shall be trained and qualified in accordance with FAA and AMC criteria.

(4) The contractor shall ensure that all aircrew are qualified for all mission operations IAW publications identified in Paragraph 3.0 Applicable Documents.

(5) Individual maintenance personnel shall possess specialized technical expertise required to support the contractor's fleet and contractor’s Ground Support Equipment (GSE). All maintenance personnel shall be trained to accomplish tasks such as aircraft towing, refueling/defueling, recovery, special equipment installation and maintenance procedures, using contractor-developed checklists. Where applicable, these individuals shall be FAA Part 65 Government-certified before performing such operations and possess appropriate licenses when applicable.

(6) The contractor shall ensure that all personnel performing Ship landing operations have appropriate training and any necessary qualifications for their respective roles.

(7) The PIC shall possess an FAA Airline Transport Pilot (ATP) or Commercial Pilot Certificate with a Rotorcraft-Helicopter Rating and Instrument Helicopter Rating. The PIC shall meet the minimum flight hour and experience requirements outlined in 14 CFR § 135 and 14 CFR § 133 as applicable for the type of operation being conducted. The PIC shall possess the applicable helicopter Type Rating, if such FAA helicopter type rating exists for the helicopter operated. The PIC shall maintain 14 CFR §135 flight instrument currency. If using Night Vision Goggles (NVGs), the pilot(s) shall be, at minimum, 14 CFR § 61.57 NVG current. The pilot, and contractor, shall comply with 14 CFR §133 and FAA AC133-1B Rotorcraft External-Load Operations, unless necessary to meet mission requirements, have been declared a PAO, and equivalent procedures are included in the contractors Flight Operation Procedures & Ground Operation Procedures manuals (FOPs/GOPs) and such procedures are approved by the GFR.

B. Personnel Duties

(1) The contractor shall provide real-time, person-to-person scheduling support 24 hours a day, seven days a week at the permanent operations site, Barking Sands, HI and at deployment sites when aircraft are deployed. The contractor shall designate a point of contact (company dispatcher, duty officer) for rapid response after duty hours. The Contractor shall provide representatives who shall have the authority to schedule and assign contractor aircraft and crews in response to Government requirements. The Contractor Representatives shall interface between the Government and the contractor and shall:

a) Maintain close liaison with SO in matters regarding contractor’s aircraft.

b) This Mishap/Incident Response Procedure (M/IRP) manual provides a standardization guide for initial reporting required in the event of an aviation Mishap/Incident, non-aviation mishap or event requiring special reporting involving aircraft or personnel under the cognizance of NAVAIR, PMA-226 Specialized and Proven Aircraft Program Office. The Mishap/Incident Response Procedure (M/IRP) covers mishap reporting procedures and is applicable during periods of supporting tasking directed by PMA-226 CAS and when operating from military bases for transit or permanent basing. The senior contractor’s representative at the mishap/incident site shall contact the, PMA-226 Specialized and Proven Aircraft Program Office points of contact listed below immediately, they in turn will contact the appropriate offices.

c) Any person who has knowledge of a mishap or incident involving injury to personnel, damage to Government property or aircraft operating under NAVAIR/NAWCAD CAS contracts shall immediately report the facts to the , PMA-226 Specialized and Proven Aircraft Program Office.

d) The senior contractor’s representative at the mishap/incident site will contact the PMA-226 office Points of Contact listed below immediately. The Contractor shall not leave messages and shall continue to call until contact is made with a PMA-226 Specialized and Proven Aircraft Program Office Representative. PMA- 226 Incident Reporting Phone Numbers:

i. Brian Alexander (252-723-1205)

ii. Rhonda Link (910-389-4433)

e) PMA-226 Specialized and Proven Aircraft Program Office will contact the appropriate offices and if required to dispatch a representative.

f) The aircraft contractor site manager will have a copy of the Base Safety Officer, Operations Officer and Emergency Response units Mishap/Incident procedures.

g) Any accidents/damage to the aircraft, which occur during operation of the aircraft and are the result of pilot error or pilot error is determined to be a contributing factor, shall be the responsibility of the contractor. All costs to repair or replace aircraft parts and all additional ferry costs or travel costs that occur as a result of the accident shall be borne by the contractor. Responsibility for any damage to aircraft that results from other than pilot error will be determined on a case-by-case basis.

h) Report all aircraft accidents and incidents immediately, by the most expeditious means, to the Command Duty Officer (CDO) and Procurement Contracting Officer (PCO). Any investigations shall be conducted in accordance with all applicable FAA, National Traffic Safety Board (NTSB) or Naval Safety Center directives.

i) Provide contractor flight crews with comprehensive mission information. This shall include all mission particulars in the initial scheduling information provided by the unit receiving services, in addition to voice call information provided by the scheduling office.

j) Provide a daily flight schedule to the Air Operations office for publication.

k) Become familiar with applicable publications for the missions being performed; and, in turn, ensure that contractor flight crews are familiar with these missions and other required regional operational instructions; and

l) Provide coordination between contractor representatives at various Government scheduling activities for the best utilization of contractor assets.

(2) All contractor personnel shall comply with local policy and regulations while aboard any military installation or U.S./foreign installation. Contractor employees shall be readily identifiable as contract employees through appropriate attire and badges while performing services under this contract.

(3) All contractor personnel who deal with any classified material shall have the requisite security clearance(s). All contractor aircrews and any other personnel who, in the conduct of their normal work would be aboard the aircraft during a classified mission, including technicians, shall have SECRET security clearances. For utility or transport missions, which are classified to prevent routine or common knowledge of the location of high-ranking individuals, aircrew without security clearances may be aboard the aircraft provided that they are not involved in direct mission planning such as to allow advance knowledge of the passengers intended movements and the rank or name.

(4) The contractor is responsible for ensuring that its aircraft, aircrew, and operations comply with all requirements for the state of registry of the aircraft and the state where operations take place in order to perform all services required under this contract. This is in addition to any additional requirements imposed by the AMC for utility and transport operations. Where the requirements of the PBWS exceed the requirements of the state of registry, the state where operations take place, or the AMC requirements, the requirements of the PWS take precedence.

(5) The contractor shall provide a lookout capability to perform internal communications and assist all functions required by the missions, and all passenger and external load flights, to and from navy vessels IAW OPNAVINST 3100.8.

(6) The basic crew duty period shall not exceed 12 consecutive hours Crew time begins at arrival for briefing and ends 12 hours later. If missions extend past the 12 hour day additional crews may be authorized by the COR via a written request or a phone call with a written request following the phone call. Pilots in single-piloted helicopters are limited to a maximum of 6 flying hours in a 12-hour crew duty period.

8.0 MISSION PLANNING AND OPERATIONS

A. Under the Commander, Naval Air Systems Command, PMA-226 Specialized and Proven Aircraft Program Office is the overall CAS Integrated Product Team Lead (IPTL). Depending on the mission and the customer, PMA-226 will designate scheduling offices to execute administrative tasks such as mission scheduling and coordination, travel order issuance and liquidation, and invoice certification.

B. Mission planning and scheduling occurs at three levels:

(1) Long-range planning covering the next six months is conducted at semi-annual program reviews.

(2) The contractor shall meet with the SO once a month to discuss long-term requirements and potential aircraft scheduled maintenance adjustments.

(3) The SO publishes a weekly schedule providing the missions to be supported, date, approximate time, scheduled airspace, and number of missions required. The weekly schedule is updated as required in conjunction with the Barking Sands/Fleet scheduling procedures at the designated scheduling office. The contractor shall be responsible for attending the weekly and monthly scheduled conferences at PMRF. No special operational weekly scheduling arrangements shall be made to meet contractor maintenance requirements. The on- site SO shall brief the on-site Contractor’s Representative regarding details of each mission.

C. Once a weekly schedule is published, the Government shall give the contractor 12 hours advance notice before assigning any additional tasking for primary aircraft. 12-Hour notice may not be provided for emergent tasking.

D. The Government may or may not order flight services on any given day.

E. Flight operations schedule. Flight operations may be scheduled for any time, 24 hours a day, seven days a week. The typical schedule for conducting flight operations is Monday through Friday, dawn to dusk, (approximate times are from 0600 to 2000, PMRF Barking Sands local time). The Government shall give 12 hours advance notice (not to include emergent tasking) of a requirement for flying outside the typical operating time. The weekly schedule issued by the SO will identify when operations are required outside of the typical period or are of longer duration than 14 hours per day. Night sustainment flights (if required) shall be coordinated through the weekly scheduling conference. Flight briefs shall be attended by all aircrew at the Range Operations building at the designated time. Aircrew are responsible for the handling and destruction of all mission-briefing guides, regardless of classification. Briefing sheets are classified at a minimum For Official Use Only (FOUO).

F. Various agencies (Aegis, Missile Defense Agency, etc.) conduct T/E testing at this range. CAS support for these T/E missions could include any of the following (bambi bucket operations (as delineated in the PBWS), passenger transportation to/from ships, or even area familiarization flights for high-ranking officials). Each of these testing events requires several weeks of advance planning to execute. This includes dry runs, dress rehearsals and game day events, with the possibility of backup day events if the event needs to be re-scheduled. Often times, these events will carry through the weekend, and require CAS support. Additionally, there exists the possibility that Fleet training events may require weekend flying. Finally, Rim of the Pacific (RIMPAC) operations will require weekend flying.

G. All flight operations must be authorized through the Government’s on-site SO as defined via a task order.

The Government shall NOT pay for any flight or any other action that the on-site SO did not schedule prior to the flight or action. The on-site SO at Barking Sands, HI shall coordinate the Government’s requirements and schedule all missions.

H. Surge Aircraft. The Government will give the contractor a minimum of 30 days advance notice before scheduling surge aircraft and will normally provide tasking under short-term, temporary assignments.

Once activated under temporary assignment, surge aircraft are considered primary aircraft for the duration of the task assignment, and fall under the scheduling criteria for primary aircraft. During temporary assignments, the contractor shall ensure these aircraft require no scheduled maintenance that will impact operational scheduling. However, during extended deployments (more than two weeks) the Government shall take into consideration operational and scheduled maintenance conflicts where feasible. If the Government requires additional tasking within this 30-day window, the contractor shall be fully accountable under the provisions of the contract for fulfillment of these missions.

I. In the event that Government needs a simultaneous presentation greater than that required under the contract, the Government can request the contractor to provide surge aircraft. The contractor shall be responsible for mission execution.

J. Contractor shall comply with FAA AC 00-1.1B PAO. Passengers and non-required crewmembers are not permitted on flights that are declared PAO. Any personnel on a PAO flight, in excess of the required crewmembers, must receive GFR approval.

9.0 BASING AIRCRAFT

A. The Government has designated a permanent operating site for the Medium Lift and Heavy Lift primary aircraft at PMRF Barking Sands, Kauai, HI. The Government will provide hanger facilities at no cost to the contractor.

B. The Contractor shall comply with Secretary of the Navy (SECNAV) Instruction 3770.1C, Use of

Department of the Navy Aviation Facilities by Other than United States DoD Aircraft.

C. Surge aircraft may be permanently based at locations of the contractor’s choosing. If the contractor selects a facility that does not have a Government fuels contract, the contractor shall be reimbursed for fuel only up to the published Defense Energy Supply Center (DESC) Rates at the time of purchase and not to exceed the actual hours flown in direct support of this contract. Current Government contract fuel rate can be obtained from the COR.

D. Items provided as GFE at the permanent operating site are listed in an Attachment in Section J upon contract award.

E. At the permanent operating site the contractor shall provide all equipment required to support operation and maintenance of the aircraft. In addition, the contractor shall maintain an Internet electronic mail account to receive and coordinate mission information, tasking, and general administrative matters.

10.0 DEPLOYMENTS

A. The contractor shall be able to deploy its aircraft, personnel, and required support equipment to perform at any airfield capable of supporting its aircraft within the Hawaiian Islands. The only additional cost allowable for deployed operations are travel and per diem for personnel. If aircraft or aircrew substitutions are accomplished at the contractor's request during a scheduled deployment, transit to and from the deployment base to accomplish the substitution must be entirely at contractor expense unless otherwise approved by the PCO prior to the substitution.

B. At least 10 days prior to any deployment, the SO shall schedule a pre-deployment planning meeting with the contractor to ensure coordination of requirements, services and accommodations.

C. For purposes of computing deployment duration, the date aircraft depart from the permanent operating site or contractor's home base is the first day of the deployment and the date aircraft return is the last day. If due to the contractor’s own fault the deployment is extended, no payment for additional costs incurred during this extension of the deployment shall be made.

D. The Government shall reimburse the contractor for per diem and travel expenses of maintenance personnel only in accordance with the following matrix. (This matrix does not limit the number of un-reimbursed maintenance personnel the contractor may deploy).

Table 10.0 (D)

Days TDY / Maintenance Personnel No of A/C 1 Day 2 Days 3 Days 4 Days 5 or more days

1 1 1 1 1 1 2 2 2 2 2 3

E. The contractor shall plan, schedule, ship, and deploy its personnel and equipment, including all GFE equipment for which the contractor is responsible for in support of the deployment missions.

F. The contractor shall provide a senior representative at all deployment sites. The contractor's senior representative at the deployment site shall:

(1) Ensure attendance of pilots at required procedure and mission briefings.

(2) Ensure contractor aircraft launch in sufficient time to arrive at designated stations on time.

(3) Coordinate all maintenance, servicing, logistics, crew transportation, contractor personnel briefings, security clearances/vehicle registrations, and equipment/facility custodial functions in support of contractor operations.

(4) Configure/reconfigure contractor aircraft as directed by the SO.

(5) Coordinate submission of required debriefing materials following each mission.

(6) Provide a daily synopsis of flight hours and sorties completed.

G. Release by the Government. When all flights for a particular deployment have been completed, the SO will notify the contractor representative that the deployment is complete. Following this notification, the contractor representative shall complete and implement arrangements to return the aircraft, personnel and equipment to the permanent operating site or the contractor’s home base. The contractor is "released" when all aircraft arrive at the permanent operating site or the contractor’s home base.

11.0 INSURANCE REQUIREMENTS

The contractor shall obtain the types and amounts of insurance listed in Section H, under NAVAIR clause 5252.228- 9501.

12.0 PHYSICAL SECURITY

IAW DoD 5220.22-M (NISPOM) and Local Instructions, the contractor shall be responsible for the physical security aspects of the work performed under this contract, including the security of all aircraft, associated vehicles, and equipment. Additionally, the contractor shall be responsible for GFE while in the contractor’s possession and shall make provisions for secure storage. Such storage at each permanent operating site shall be located in one or more secure structures with a total storage area of approximately 200 square feet and physically located within close proximity of the aircraft. Lesser square footage may be required at other locations unless Government facilities are provided. The government shall provide security support, control entry to facility, and issue ID cards and vehicle passes in accordance with Commander, Navy Region Hawaii (COMNAVREGHI) regulations. The government shall provide investigation services for criminal or security related incidents and copies of any reports generated.

The contractor shall provide any additional security requirements deemed necessary within their organization.

13.0 OPERATIONAL SECURITY (OPSEC)

The contractor shall develop/submit an OPSEC plan IAW Section J, List of Attachments, Exhibit A, DD Form

1423, (CDRL TBD).

14.0 INFORMATION SECURITY

IAW DoD 5220.22-M (NISPOM) and Local Instructions

A. The work performed under contract as delineated in the attached DD Form 254 (Section TBD, Attachment TBD) shall involve contractor access to SECRET material at a Government or another contractor’s facility and handling classified material up to SECRET at the contractor’s facility.

B. The Government will provide the contractor access to official message service and Secret Internet

Protocol Router Network (SIPRNet), where available, at the permanent operating site, to receive and send classified schedule and/or operational messages to operating units.

C. The contractor shall attend all security briefings.

15.0 AUTOMATIC DATA PROCESSING (ADP) SECURITY AND TEMPEST REQUIREMENTS

Connection to any existing systems, and/or any standalone systems wishing to operate at PMRF or interface with PMRF’s network infrastructure must be DoD Information Technology System Certification and Accreditation Process (DITSCAP) compliant and provide proof of approved DITSCAP documentation. This includes copies of the, Memorandum of Agreement (MOA), Memorandum of Understanding (MOU), Systems Security Authorization Agreement (SSAA), Interim Authority to Operate (IATO), Authority to Operate (ATO), Interim Authority to Connect (IATC), and Authority to Connect (ATC) prior to implementation at PMRF.

16.0 SECURITY WARNING

Performance under this contract may involve access to information affecting the national defense of the United States within the meaning of the Espionage Laws, 18 USC § 793-94. The transmission or the revelation of the classified contents or of the classified matter to which access may be had in any manner to an unauthorized person is prohibited by law.

17.0 INTELLIGENCE INFORMATION SECURITY

A. The Government will provide intelligence information to the contractor to the extent necessary for the contractor to perform the requirements of the contract. Intelligence information necessary to perform the requirements of this contract shall be provided by the SO to the contractor. The information does not become the property of the contractor and may be withdrawn at any time. Upon expiration of the contract, all intelligence information released and any information using data from the intelligence information shall be returned to the releasing activity for final disposition.

B. The contractor shall not release the intelligence information to any activity or person of the contractor’s organization not directly engaged in providing services under contract or to another contractor (including…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .