C7_PPI_Answers_KBDock_Ladders.docx
DOCX document 33 KB Posted
- Attached to
- KB Dock Piers Ladder Replacement
- Solicitation number
- N0025326Q0009
About this file
This file is a Questions and Answers (Q&A) document addressing clarifications on the KB Dock Piers Ladder Replacement solicitation (N0025326Q0009), a Naval Sea Systems Command small business set-aside for pier ladder replacement at NUWC Keyport, WA and NBK Bangor.
Key technical requirements clarified include: all existing ladders may be removed simultaneously; swing gates are not required; ladder upper sections must be 42 inches above the pier deck with OSHA-compliant extensions; all welding must be performed by certified welders with at least 5 years' experience meeting American Welding Society standards and rated for salt water submersion; ladder anchors require an ACI-certified installer; material options include hot-dipped galvanized steel, aluminum with dielectric break insulation, or marine-grade 316 stainless steel with dielectric break shackles to prevent dissimilar metal degradation; concrete or steel weights are acceptable in lieu of concrete foundations. Operational constraints include pier weight limits (Keyport: 20-ton per axle/45-ton gross; KB Dock: 10-ton maximum with no cranes permitted) and drilling restrictions that prohibit any work at or below the waterline, requiring containment methods such as shop vacuums. Existing concrete anchors must not be reused; contractors shall furnish and install new anchors as determined by the certified installer. No detailed anchor connection drawings are currently available; specifications are contained in the Statement of Work sections covering Products and Work Description.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C7_PPI_Answers_KBDock_Ladders_Complete_List.docx | DOCX document | |
| N0025326Q0009_Amendment_0002.pdf | ||
| C7_Att13_KB_Dock_Keyport_Ladder_Replacement_SoW_Rev2.pdf | ||
| C7_Att13_KB_Dock_Keyport_Ladder_Replacement_SoW Rev1.pdf | ||
| N0025326Q0009_Amendment_0001.pdf | ||
| C7_Att06_Schedule_Of_Values.xlsx | XLSX spreadsheet | |
| C7_Att12_Security_Requirements.docx | DOCX document | |
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att08_Bid_Form.xlsx | XLSX spreadsheet | |
| C7_Att13_Statement_of_Work_Pier_Ladders.pdf | ||
| C7_Att01_Materials_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att10_Safety_Data_Sheet.docx | DOCX document | |
| C7_N0025326Q0009.pdf | ||
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att09_PPI_Form.docx | DOCX document | |
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KB Dock Ladders
1. QUESTION: How many ladders can we have removed at a time at each pier?
ANSWER: Because Ladders are completely unusable, they may be removed all at once.
2. QUESTION: Confirm if swing gates will be required on all required ladders
ANSWER: Swing gates are not required.
3. QUESTION: Confirm all ladders have OSHA compliant ladder extension 3’ to provide safe and easy transition to another surface.
ANSWER: The SOW is amended to reflect this addition of Two, for a total of Four Ladder upper sections at KB Dock. These shall be 42 inches above the pier deck.
4. QUESTION: Confirm All welding shall be performed by certified welders in accordance with applicable standards
ANSWER: This is acceptable. If welding is performed it shall be accomplished by a certified welder, with at least 5 years’ experience and applicable American Welding Society (AWS) welding code specifications. Certifications shall cover the material used and applicable to material that will be submerged in salt water.
5. QUESTION: Confirm ladder anchors need to have an installer that is ACI certified on this application.
ANSWER: Confirmed the installer shall have current ACI Certification. See revised SOW, Work Description #9.
6. QUESTION: Confirm 316 marine grade Stainless steel.
ANSWER: This is not required but is acceptable. If Stainless steel is used a dielectric break shackle shall be installed to prevent dissimilar metal degradation. See revised SOW.
7. QUESTION: The existing ladders, at Keyport and KB dock are galvanized steel. Please confirm the replacement ladders are to be Galvanized Steel.
ANSWER: Galvanized steel is acceptable. If Galvanized steel is used it shall be hot dipped Galvanized. If Aluminum ladders are used the shackle shall be insulated with dielectric break to prevent dissimilar metal degradation. SOW will reflect this change.
8. QUESTION: If HDG steel ladders are used, can a 6”x 6” x 22” solid steel weight be used in lieu of concrete?
ANSWER: Steel or concrete is acceptable.
9. QUESTION: At Keyport, can the existing upper ladders be cut at 8’ down to support the install of new 20’ lowers?
ANSWER: This is acceptable. Every effort should be made to ensure metal shavings do not fall in the water.
10. QUESTION: Are there weight restrictions for equipment or cranes on the piers?
ANSWER: Keyport pier weight limit 20-ton per axle, 45-ton gross. KB Dock is 10-ton and cranes are not allowed.
11. QUESTION: Are there any drawings, schematics, photographs, measurements, or additional specifications available showing the required fabrication and installation details for the new ladders?
ANSWER: There are concept drawings detailing the existing ladders at Keyport pier are located in the Statement of work (pg. 16 of 39) – additionally, the Revised SOW states “Fixed pier ladders shall be 42 inches above the pier deck”.
12. QUESTION: The scope requires drilling into the concrete while also stating that concrete dust is not to enter the water. How is the contractor expected to meet this requirement for drilling that occurs at or below the waterline? Is there a specific containment method or procedure required?
ANSWER: There shall be no drilling at or below the water line. This is a means and method common to construction. There are several options. One method would be to use a shop vac while drilling or cutting.
13. QUESTION: Regarding the concrete anchors, are existing anchors currently in place and intended to be reused, or is the contractor responsible for furnishing and installing new anchors?
ANSWER: Existing anchors shall not be reused. The contractor shall furnish and install new anchors.
14. QUESTION: If new anchors are required, are there specifications available for the required size, dimensions, configuration, and installation method?
ANSWER: This will be determined by the certified installer employed by or subcontracted by the offeror. The installer shall have current ACI Certification. See SOW revision, Work Description #9.
15. QUESTION: Is there a drawing or additional detail showing how the anchors and ladder system are to be connected, including any specific attachment hardware, shackles, or anchoring configuration required?
ANSWER: There are no additional drawings available at this time. The details are described in the Statement of work, sections IV. Products: & IX. Work Description.