C7_Att08_Bid_Form.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- KB Dock Piers Ladder Replacement
- Solicitation number
- N0025326Q0009
About this file
This file is a bid form template (Excel spreadsheet) for the Pier Ladder Replacement solicitation at Naval Undersea Warfare Center (NUWC) Keyport and Naval Base (NBK) Bangor. The form is designed to capture vendor pricing and proposal information required for response to RFQ N0025326Q0009, issued by the Department of the Navy Naval Sea Systems Command.
The solicitation is a 100% small business set-aside with NAICS code 237990 (size standard $45,000,000). Offerors must provide FOB Destination pricing to NUWC Keyport, WA 98345. All proposals must be submitted via email to dane.a.jacobson3.civ@us.navy.mil and kaci.j.campbell.civ@us.navy.mil in digital format only, with no paper copies accepted. Vendors are required to complete all sections of the bid form and RFQ, along with all representations and certifications, prior to the solicitation closing date; failure to do so may result in rejection as non-responsive. Government-furnished terms and conditions apply per Federal Acquisition Regulations (FAR) and Department of Defense FAR Supplement requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C7_PPI_Answers_KBDock_Ladders_Complete_List.docx | DOCX document | |
| N0025326Q0009_Amendment_0002.pdf | ||
| C7_Att13_KB_Dock_Keyport_Ladder_Replacement_SoW_Rev2.pdf | ||
| C7_PPI_Answers_KBDock_Ladders.docx | DOCX document | |
| C7_Att13_KB_Dock_Keyport_Ladder_Replacement_SoW Rev1.pdf | ||
| N0025326Q0009_Amendment_0001.pdf | ||
| C7_Att06_Schedule_Of_Values.xlsx | XLSX spreadsheet | |
| C7_Att12_Security_Requirements.docx | DOCX document | |
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att13_Statement_of_Work_Pier_Ladders.pdf | ||
| C7_N0025326Q0009.pdf | ||
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att09_PPI_Form.docx | DOCX document | |
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C7_Att01_Materials_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att10_Safety_Data_Sheet.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025326Q0009 | Contractor: | |
| PID Description: | KB Dock/ Keyport Piers Ladder | Date: | |
| Project Location: | Naval Undersea Warfare Center, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| KB Dock/ Keyport Piers Ladder | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |