C7_Att01_Materials_Equipment_In_Place_List.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- KB Dock Piers Ladder Replacement
- Solicitation number
- N0025326Q0009
About this file
This is a Materials and Equipment In-Place List spreadsheet template designed to document installed equipment and materials for federal contracting purposes, specifically for the KB Dock/Keyport Piers Ladder Replacement project under Contract No. N0025326Q0009. The template requires contractors to provide comprehensive asset information including building and room numbers, quantities, unit of measure, replacement costs, supplier details, manufacturer information, model and serial numbers, warranty expiration dates, and installation dates. The spreadsheet includes mandatory fields for documenting both newly installed equipment (Column B) and removed equipment (Column O), with separate line items required for each asset when the unit of issue is "EACH." Costing data must encompass both labor and material costs for removal and installation of assets.
The example provided demonstrates the template's application, showing two breathing air filters and carpet installation as sample entries with detailed supplier contact information, manufacturer specifications, and associated costs. Contractors submitting final documentation will not need to populate the "New Asset Number" column, as the Facility Management System (FMS) will assign asset numbers upon receipt from the government. The template emphasizes accurate documentation of asset details, including size, capacity, and any additional relevant specifications to ensure proper facility asset tracking and inventory management for Naval Undersea Warfare Center Division operations at Keyport and Naval Base Bangor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C7_PPI_Answers_KBDock_Ladders_Complete_List.docx | DOCX document | |
| N0025326Q0009_Amendment_0002.pdf | ||
| C7_Att13_KB_Dock_Keyport_Ladder_Replacement_SoW_Rev2.pdf | ||
| C7_PPI_Answers_KBDock_Ladders.docx | DOCX document | |
| C7_Att13_KB_Dock_Keyport_Ladder_Replacement_SoW Rev1.pdf | ||
| N0025326Q0009_Amendment_0001.pdf | ||
| C7_Att06_Schedule_Of_Values.xlsx | XLSX spreadsheet | |
| C7_Att12_Security_Requirements.docx | DOCX document | |
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att08_Bid_Form.xlsx | XLSX spreadsheet | |
| C7_Att13_Statement_of_Work_Pier_Ladders.pdf | ||
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att10_Safety_Data_Sheet.docx | DOCX document | |
| C7_N0025326Q0009.pdf | ||
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att09_PPI_Form.docx | DOCX document | |
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | KB Dock/Keyport Piers Ladder Replacement | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .