This document is a comprehensive Questions and Answers (Q&A) compilation addressing 276 inquiries from prospective offerors regarding solicitation N0017826R2500 for warehousing, logistics, and material handling support services at Naval Surface Warfare Center Dahlgren Division (NSWCDD), Dam Neck Activity, Virginia Beach, Virginia.
The requirement is a 100 percent Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for a firm-fixed-price (FFP) commercial services contract conducted under FAR Part 12 and FAR Subpart 13.5 using Lowest Price Technically Acceptable (LPTA) evaluation methodology. The base period is 24 May 2027 through 23 May 2028, with four 12-month option periods. The quotation deadline was extended to 01 December 2026 at 12:00 PM Eastern Time, with anticipated award by 19 February 2027. The contractor must provide and operate a 100,000-square-foot off-site warehouse facility located within 30 miles (normal driving distance) of NSWCDD Dam Neck (1922 Regulus Avenue, Virginia Beach, VA 23461), excluding the Eastern Shore. The facility must become fully operational within 90 days of the period of performance start date and accommodate approximately 5,500 line items and 240,500 units of government inventory. Required staffing includes one Program Manager (633.6 hours annually, approximately 0.33 FTE), one Warehouse Manager (key personnel), one Material Coordinator, one Material Expediter, eight Warehouse Specialists, two Truck Drivers Medium (plus one surge driver in option years), totaling approximately 25,594 base-year hours and 27,514 hours with surge in option years. The contractor must furnish all racking, material handling equipment, vehicles, facility operating costs, and related logistics support; the Government will provide 13 NMCI laptops with docking stations and limited GFP equipment. All costs for facility lease, MHE, vehicles, utilities, insurance, drayage, and overhead must be fully burdened into the proposed hourly labor rates under the established labor CLINs with no separate pricing line items. The facility must maintain environmental controls of 0°C to 45°C (32°F to 113°F) with maximum 95 percent non-condensing humidity throughout the entire active storage and operational footprint, include one dock-level and one floor-level loading door (minimum 10 feet wide by 12 feet high, though 14 feet by 14 feet preferred), support a 400-pounds-per-square-foot live load capacity, and include an operational fire suppression system meeting local building codes and OSHA standards. The Government does not intend to store any hazardous materials at the contractor facility. All personnel directly supporting the contract must possess an active SECRET Facility Security Clearance (FCL) at contract award; the Government will not sponsor initial clearances. Service Contract Labor Standards (SCLS) applies, with Department of Labor Wage Determination 2015-4341 incorporated, and FAR Clauses 52.222-41, 52.222-42, and 52.222-43 required. The contract includes limitations on subcontracting (FAR 52.219-14) restricting subcontracted labor costs to 50 percent of total labor costs unless subcontractors are similarly situated SDVOSBs. Contractor facility payments begin on the formal contract start date; unrecovered lease costs if options are not exercised remain the contractor's responsibility. Technical quotations must be submitted in two streamlined volumes addressing facility verification with specific street address and evidence of availability, staffing and equipment capability limited to key personnel qualifications, government property management system compliance, and security clearance verification. Supporting documentation must include facility specifications, floor plans, operational capacity certifications, and proof of compliance with SOW requirements. The Government will conduct evaluation on a Pass/Fail basis against mandatory SOW minimum requirements with no formal evaluation factors section in Section M.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Good afternoon. In reviewing the bid documents for the subject solicitation, I was unable to locate a wage determination guide (WDOL) for the geographic area surrounding the proposed Place of Performance.
Please advise if a guide will be made available for bidder's use in computing its cost estimates.
Yes. In accordance with FAR Subpart 22.10, the Service Contract Labor Standards statute applies to this requirement. Department of Labor Wage Determination No. 2015-4341 has been added as Attachment J.7 via Amendment 0001.
2. We are performing in dependent research on the Combined Synopsis/Solicitation (N0017826R2500). We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number and what the total contract value was?
Historically, similar on-site property management, material handling, and logistics support services were performed under Naval Sea Logistics Center (NSLC) Task Order N6426721F3002 (under parent contract N0017819D7705) by ASR International Corporation. However, pursuant to the NAVSEA realignment directive, this requirement is newly established as a standalone NSWCDD DNA contract that significantly expands the scope to include a mandatory contractor-provided and contractor-managed 100,000 sq ft off-site warehousing facility.
3. SOW Section 3.2.1 requires the warehouse facility to be located within 30 miles of NSWCDD DNA, 1922 Regulus Ave., Virginia Beach, VA 23461. How will the Government determine compliance with the 30-mile requirement: straight-line radius, normal driving distance, or another Government-established measurement method?
Normal driving distance. As established in the SOW, the facility must be located within a 30-mile normal driving distance from NSWCDD DNA (1922 Regulus Ave., Virginia Beach, VA 23461), strictly excluding the Eastern Shore of Virginia to avoid recurrent travel delays across the Chesapeake Bay Bridge-Tunnel.
4. Does the offeror need to have the proposed warehouse facility under lease, ownership, or other binding control at the time of quotation submission or contract award, or is it acceptable to identify a proposed facility and execute the lease following award, provided the facility is fully operational within the required 90 days after contract issuance?
Warehouse facility needs to be in place within the required 90 days after the period of performance issuance. The offer does not have to have the proposed warehouse facility under lease, ownership, or other binding control at the time of quotation submission or contract award; however, the proposal shall provide enough supporting evidence (see response to question 5) to substantiate the proposed facility meets all mandatory minimum requirements set forth in the SOW Section 3.2.
5. What documentation does the Government expect offerors to provide with their quotations to demonstrate compliance with the warehouse requirement? For example, will a letter of intent, property availability letter, proposed lease, facility specification sheet, floor plan, or similar documentation be required?
The solicitation does not mandate a specific document format or require an executed commercial lease at the time of quotation submission, as the contractor is afforded up to ninety (90) calendar days into the period of performance to achieve full operational readiness in accordance with the Statement of Work
(SOW).
However, to be evaluated as Technically Acceptable on a Pass/Fail basis, the quotation must contain sufficient technical documentation to substantiate the proposed facility meets all mandatory minimum requirements set forth in the SOW. Acceptable documentation includes, but is not limited to:
Physical street address of the proposed facility verifying compliance with the 30-mile normal driving distance radius (excluding the Eastern Shore).
Evidence of site availability within 90 days of Period of Performance start (e.g., deed, executed lease, binding letter of intent, or property availability/commitment letter from the property owner/broker).
Detailed facility specification sheet / marketing brochure confirming a minimum of 100,000 square feet, clear ceiling height, column spacing, and 400 lbs./SF floor load capacity.
Scaled or dimensioned floor plan layouts illustrating dock doors, drive-in doors, bulk storage layout, and designated rack space.
Certification or descriptive literature confirming an operational fire suppression system (wet or dry) meeting local building codes (e.g., International Building Code / International Fire Code) and Occupational Safety and Health Administration (OSHA) standards.
6. SOW Section 3.2.2 states that approximately half of the 100,000 square feet shall be bulk storage and half rack space. Does the Government require approximately 50,000 square feet of installed racking to be in place, or does “rack space” refer to floor area designated and capable of supporting warehouse racking?
The term "rack space" refers to the floor area designated for and capable of supporting warehouse racking systems. The Government does not mandate that 50,000 square feet of physical racking be fully installed on Day 1. The contractor is responsible for configuring the floor layout to optimize selective pallet racking, bulk laydown, and aisle widths to accommodate the Government’s inventory footprint (~5,500 SKUs / 240,500 units) and operational throughput.
Racking does not need to be in place when the facility is “opened,” but vertical storage will be necessary to accommodate the material planned for the facility over time. The government currently manages approximately 20K sq ft of material that is small-to-medium sized and stored on shelving or racking.
7. If warehouse racking is required, will the Government provide any existing racks as Government-Furnished Property, or is the Contractor responsible for procuring and installing all required racking? If Contractor-furnished, please provide any minimum rack configuration, height, capacity, aisle-width, or other specifications.
The Government will not provide racking as Government-Furnished Property (GFP). All racking is Contractor-Furnished Equipment (CFE). The contractor is responsible for procuring, installing, and certifying all heavy-duty industrial pallet racking and shelving. Racking configurations must comply with applicable OSHA, NFPA, and local building codes, support the required 400 lbs./SF floor loading, accommodate standard 40" x 48" pallets, and provide adequate aisle widths for the contractor’s material handling equipment.
Upon the start of the period of performance the contractor will have access to the material in its current storage locations. The facility is not required to be up and running until 90-days after the period of performance start, and the government will collaborate on a plan to transition material to the contractor’s facility, potentially allowing additional time for construction of racking/shelving the contractor deems appropriate to handle the material.
8. SOW Section 3.2.2 requires a minimum floor-load capacity of 400 pounds per square foot. Must the entire warehouse floor meet the 400 lbs./SF rating, or only the portions designated for bulk and rack storage?
What documentation will the Government require to demonstrate compliance with this requirement?
The government is not asking for proof of compliance with/to industry standards for light-to-medium warehouses.
9. SOW Section 3.2.5 requires both dock-level and grade-level loading with minimum door dimensions of 14 feet by 14 feet. Does the 14-foot by 14-foot minimum apply to both dock-level and grade-level doors? Is there a minimum number of dock-level or grade-level doors required?
Requirement is for at minimum, one dock-level and one floor-level door. The government will consider doors smaller than 14 ft. x 14 ft., but not less than 10 ft. wide by 12 ft. high as technically acceptable.
10. SOW Section 3.2.7 requires a fire suppression system capable of supporting storage of hazardous materials.
Can the Government provide the anticipated types, hazard classes, approximate quantities, and maximum quantities of HAZMAT expected to be stored at the Contractor facility so offerors can properly evaluate fire-code, permitting, insurance, and facility requirements?
The government does not intend to store any HAZMAT at the contractor facility.
11. Are any specialized HAZMAT storage features anticipated beyond a compliant wet or dry fire-suppression system, such as segregated storage areas, secondary containment, ventilation, spill-control systems, flammable-storage rooms, or environmental permits?
The government does not intend to store any HAZMAT inventory at the contractor facility.
12. SOW Section 3.2.3 requires warehouse temperatures of 0-45 degrees Celsius and maximum humidity of 95% non-condensing. Does this environmental requirement apply to the entire 100,000-square-foot warehouse, or only to particular storage areas? Is continuous temperature and humidity monitoring required?
The environmental requirement (0°C to 45°C / 32°F to 113°F and maximum 95% non-condensing humidity) applies to the entire 100,000-square-foot active storage and operational footprint to prevent freezing, condensation, or heat damage to sensitive electronic components and fleet assemblies. Continuous or calibrated electronic environmental monitoring and data logging are required to support audit readiness and asset preservation standards.
13. SOW Section 5.1 states that the Contractor shall possess and maintain a SECRET Facility Clearance.
Please confirm whether an active SECRET Facility Clearance must be held at the time of quotation submission, at the time of award, or prior to commencement of classified work.
An active SECRET Facility Security Clearance is not required at the time of quotation submission because access to classified information is not required for quote preparation (as reflected in Attachment J.2 DD254_Bidding). However, the successful offeror must possess an active SECRET Facility Clearance issued at the time of contract award in order to be eligible for award and commence performance.
14. If an otherwise successful SDVOSB offeror does not currently possess the required SECRET Facility Clearance, will the Government sponsor the successful offeror for the required FCL, or must the FCL already exist as a condition of award?
No, the Government will not sponsor an offeror for an initial Facility Security Clearance (FCL) under this procurement. Due to the operational start date of February 21, 2027, the apparent awardee must already possess an active, verified SECRET FCL at the time of contract award. Offerors that do not possess the required FCL at time of award will be determined non-responsible.
15. SOW Section 5.1 states that all personnel directly supporting the contract must possess a current or interim SECRET clearance at the time of award. Please clarify which labor categories are considered to be “directly supporting” the contract. Does this requirement apply to all warehouse personnel, truck drivers, material coordinators, the Warehouse Manager, and Program Manager?
All personnel listed in Attachment J.3 is “directly supporting” the contract. Any other contractor personnel supporting corporate support (ex. business owner, financial manager) that is not serving as once of the labor categories is not required to hold a SECRET clearance. In their quotation, offerors must provide verification of current personnel clearances or a detailed explanation demonstrating how all proposed personnel will have the necessary active or interim clearances in place by contract award.
16. The SOW states that no safeguarding of classified material is authorized at the Contractor facility. Please confirm that the Contractor-provided warehouse is therefore not required to be approved as a classified storage/open-storage facility.
The contractor will not be required, nor shall at any time, store any classified material. If at any time the contractor identifies classified material in their possession at the contractor-provided warehouse, the contractor must inform the Government immediately to coordinate removal of such material.
17. The solicitation includes a heading for “Section M – Evaluation Factors for Award,” but no evaluation factors appear beneath that section. Please provide the complete evaluation factors and standards that will be used to determine technical acceptability under the Lowest Price Technically Acceptable evaluation methodology.
The inclusion of the heading "Section M – Evaluation Factors for Award" was an administrative artifact from preliminary template drafting and is hereby removed via Amendment 0001. Formal Uniform Contract Format (UCF) Section M evaluation factors do not apply to this procurement.
As stated in the solicitation notice and SF 1449 instructions, this acquisition is conducted under FAR Part 12 and FAR Subpart 13.5 (Simplified Procedures for Certain Commercial Items) utilizing the Lowest Price Technically Acceptable (LPTA) evaluation methodology.
18. Please identify the required quotation volumes and submission contents, including any required technical approach, staffing plan, resumes, facility information, past performance, transition plan, or other technical documentation.
This acquisition is conducted under FAR Part 12 (Acquisition of Commercial Products and Commercial Services) and FAR Subpart 13.5 (Simplified Procedures for Certain Commercial Items) utilizing the Lowest Price Technically Acceptable (LPTA) evaluation methodology. Formal multi-volume proposals, past performance volumes, and complex Section L/M procedures under FAR Part 15 are not applicable to this procurement.
Offerors are instructed to organize their quotation into two (2) streamlined volumes as follows:
Volume I – Technical Acceptability (Pass/Fail):
Facility Verification: Proposed facility street address (verifying location within 30 miles of Virginia Beach, VA 23461); evidence of site availability within 90 days of Period of Performance start (e.g., deed, executed lease, binding letter of intent, or property availability/commitment letter from the property owner/broker), and facility specifications in accordance with SOW criteria
Evidence of site availability
Staffing & Equipment Capability: The technical evaluation of staffing capability is limited strictly to the qualification and experience verification of the proposed key personnel. No additional staffing narratives, personnel pipeline strategies, or general labor capability descriptions are required or will be evaluated for the non-key labor categories.
Government Property: Required property management system information and any proposed rent-free property use IAW NAVSEA provision L-245-H002.
Security Clearance Verification: Verification of a current SECRET Facility Security Clearance (FCL) (including CAGE code) and personnel clearances, OR a detailed explanation demonstrating that the offeror will have the necessary facility clearance and cleared personnel in place by contract award.
Volume II – Price & Administrative:
Completed SF 1449 / CLIN pricing schedule for base and all option periods.
Signed/acknowledged SF 30 for all solicitation amendments, if applicable.
Supporting commercial pricing data (published catalog prices, commercial pricelists, or recent historical pricing) IAW FAR 13.106-3.
19. Are there page limitations, font requirements, file-size restrictions, or prescribed formatting requirements for the technical and price quotations?
Other than organizing submissions as outlined in Question 17, the Government does not impose formal page limits, strict font restrictions, or rigid formatting guidelines under these simplified procedures;
however, offerors are encouraged to be clear, concise, and structured.
All submissions must be submitted electronically in Adobe PDF or Microsoft Office (Word/Excel) format via email. Individual email attachments should not exceed 20 MB due to DoD email gateway constraints.
20. Please clarify how the Government will evaluate the proposed warehouse facility for technical acceptability and whether the facility must be specifically identified by address in the quotation.
Yes, the physical street address of the proposed facility must be specifically identified in the quotation. The Government will evaluate the proposed facility on a Pass/Fail basis to verify the facility is located within the mandatory 30-mile driving radius of Virginia Beach, VA 23461 and the submitted facility specifications, floor plans, or descriptive literature substantiate that the building meets the mandatory physical parameters set forth in the SOW
21. If an offeror proposes a facility that requires minor tenant improvements to fully meet the SOW requirements, will the Government consider that facility technically acceptable provided the offeror demonstrates that all improvements will be completed and the facility will be fully operational within the 90-day mobilization period?
In accordance with the Statement of Work (Attachment J.1 SOW), the contractor is afforded up to ninety
(90) calendar days following the start of the period of performance to achieve full operational facility readiness. A proposed facility that requires minor tenant improvements will be considered Technically Acceptable, provided the offeror includes in Volume I (Technical) a realistic schedule demonstrating how all required modifications will be completed to achieve full operational capability within that 90-day window.
22. Does the Government require the contractor warehouse to be a single-tenant building, or may the proposed facility include one additional co-tenant provided OFFEROR's leased premises are definitively and permanently separated, with no shared warehouse storage, internal material flow, personnel access, inventory, or controlled Government-property space?
A proposed multi-tenant facility will be considered “technically acceptable,” provided warehouse storage spaces are completely segregated.
23. If one co-tenant is permitted, may OFFEROR and the other tenant share exterior truck courts, parking, fire lanes, utilities, or other common exterior building infrastructure provided OFFEROR's warehouse, loading operations, personnel access, and Government-property areas remain separately controlled?
Yes.
24. If OFFEROR proposes distribution center which provides approximately 114,357 SF immediately available, 3,635 SF office, 28-ft clear height, 24 dock doors, one 13-ft x 15-ft drive-in door, ESFR fire suppression, a 132-ft truck court, and 28 dedicated trailer stalls. Would the Government consider this overall configuration technically acceptable if all other SOW requirements are satisfied?
Yes. Based on the described configuration (114,357 SF exceeding the 100,000 SF minimum, 28-ft clear ceiling height, 24 dock positions, 13-ft x 15-ft drive-in door, ESFR fire suppression, dedicated office space, and trailer parking), this facility satisfies and exceeds the mandatory physical parameters of SOW Section
3.2 and would be evaluated as Technically Acceptable on a Pass/Fail basis, provided location and other SOW criteria are met.
25. Is the stated 14-ft x 14-ft loading-door dimension an absolute mandatory minimum, or may the Government accept OFFEROR's proposed 13-ft x 15-ft grade-level drive-in opening based on its overall operational capability and greater vertical clearance?
A 13-foot wide by 15-foot high grade-level drive-in door is acceptable. The Government determines that a 13-ft x 15-ft opening provides equivalent operational utility and superior vertical clearance for standard over-the-road freight trucks, box trucks, and cargo transports, satisfying the operational intent of SOW Section 3.2.5.
26. If the existing 13-ft x 15-ft grade-level opening is not acceptable, would the Government consider the facility technically acceptable if OFFEROR obtains a landlord commitment to enlarge the applicable opening to 14-ft x 14-ft or greater before Government operational acceptance?
As stated in Question 24, the 13-ft x 15-ft drive-in door is acceptable as configured. Furthermore, as confirmed in Question 20 and Question 27, landlord commitments to execute minor modifications within 90 days of the period of performance start date are acceptable.
27. Must every dock-level loading door meet the 14-ft x 14-ft dimension, or may the requirement be satisfied by providing at least one compliant dock-level opening and one compliant grade-level opening, with the remaining standard dock doors used for routine palletized freight?
No, every dock-level door is NOT required to be 14-ft x 14-ft. The 14-ft x 14-ft (or approved 13-ft x 15-ft) dimension applies only to the grade-level drive-in door. Standard commercial dock-high doors (typically 8'x10' or 9'x10' with dock levelers and seals) are fully acceptable for routine loading/unloading of commercial trailers.
28. Must all physical facility requirements and landlord improvements be complete at quotation submission or contract award, or may final modifications be completed during the authorized mobilization period before operational acceptance and inventory transfer? What evidence of facility control and planned modifications should be included with the quotation?
All physical facility requirements and landlord improvements do not need to be complete at quotation submission or at contract award. Final modifications may be completed during the authorized ninety (90) calendar day mobilization period post-award, prior to final Government facility inspection and operational acceptance.
A proposed facility that requires minor tenant improvements may be considered Technically Acceptable, provided the offeror includes in Volume I (Technical) a realistic schedule demonstrating how all required modifications will be completed to achieve full operational capability within 90 days of the period of performance start date.
29. Is the approximately 90-day warehouse launch/mobilization period an absolute maximum, or may NAVSEA/NSWCDD authorize additional transition time when required for landlord modifications, security processing, equipment installation, employee onboarding, or Government inventory transfer?
The 90-day launch/mobilization period is the required baseline standard for achieving full operational capability to ensure seamless continuity of operations for Dam Neck. All personnel, whether assigned to the Contractor’s warehouse or Government warehouse shall be fully staffed at the start of the period of performance. During the 90-day launch/mobilization period, Contractor staff aligned to the Contractor warehouse shall provide support at Government facilitates as required (to include inventorying, packing, planning for material transfer, etc.) to prepare for transition to the Contractor warehouse.
While the Government reserves the administrative authority to adjust contract schedules post-award if unforeseen Government-directed delays occur, offerors must propose and plan to achieve full facility readiness and operational capability within ninety (90) calendar days of the period of performance start date. Quotations that take exception to or condition their price upon an extended mobilization period will be deemed non-compliant and rejected.
30. If additional mobilization time may be approved, would the Government consider a 120-day or 150-day transition period supported by a detailed milestone schedule? May OFFEROR use phased operational acceptance for facility/security readiness, MHE and systems installation, cleared workforce activation, initial inventory transfer, and final full operational capability?
No, the Government will not consider or approve an initial 120-day or 150-day transition period. All quotations will be evaluated on a Pass/Fail basis against the mandatory 90-calendar-day mobilization requirement set forth in the SOW.
31. Must every newly hired contract employee possess final Secret eligibility/access before beginning any contract work, or may otherwise qualified personnel perform authorized unclassified duties while Government security processing is pending? Is an interim Secret determination acceptable where permitted?
An active SECRET Facility Security Clearance (FCL) is not required at the time of quotation submission, as access to classified information is not required for quote preparation (in accordance with Attachment J.2 DD254_Bidding).
However, an active SECRET FCL is required as a condition of contract award. There is no post-award grace period to obtain an initial facility clearance, as facility security transfer must proceed during the 90-day mobilization window. An interim SECRET Facility Clearance is acceptable at the time of award, provided it is officially granted and active.
32. If Government security-clearance adjudication exceeds the contractor's control, may NAVSEA authorize an extended onboarding period for affected new hires without treating the delay as contractor nonperformance? If so, what additional period should offerors plan for?
Offerors are responsible for proposing a staffing and recruiting plan that ensures a qualified, security-eligible workforce is available to support contract performance within the required timelines. Offerors should not plan or price for an extended onboarding period in their quotations, but rather propose staffing strategies to meet the performance start date.
33. Please confirm the Government's minimum required FTE quantity for each labor category - Program Manager, Warehouse Manager, Material Expediter, Warehouse Specialist, Medium Truck Driver, and Material Coordinator - and confirm whether the Warehouse Manager is the Government-designated key onsite operational position.
Offerors are instructed to price their quotations based on the labor categories and quantities established in Section B (SF 1449 / CLIN Pricing Schedule) and the operational duties detailed in the Statement of Work (Attachment J.1 SOW). The labor quantities reflected in Section B represent the Government’s required baseline staffing to support operational requirements. To be evaluated as Technically Acceptable on a Pass/Fail basis, quotations must demonstrate a staffing capability that meets or fulfills these required baseline labor categories and functions.
The Warehouse Manager labor category is the Government-designated key onsite operational position in accordance with Attachment J.3 (Labor Category Qualifications).
34. Does the Government prescribe a minimum number and type of contractor-furnished forklifts, reach trucks, powered pallet jacks, or other MHE, or may OFFEROR determine the fleet necessary to achieve the required performance? OFFEROR is planning two 8,000-lb-capacity forklifts, one reach truck, one powered pallet jack, and two manual pallet jacks. Is operational redundancy required for the 8,000-lb capability?
The Offeror may determine the fleet necessary to achieve the required performance.
35. Does the Government prescribe a minimum number of contractor-furnished enclosed delivery trucks, or may OFFEROR determine fleet size based on workload and response requirements? Would two enclosed delivery trucks for routine operations, supplemented by leased/rental vehicles for approved surge, be acceptable?
Minimum of one enclosed delivery truck is required to protect property during inclement weather transport.
The Offeror may determine fleet size beyond the required based on their assessment of workload.
36. Please identify the minimum required physical-security configuration for the commercial warehouse.
Specifically, does the Government require or prefer electronic cipher/badge access, a single-person turnstile or anti-tailgating control, CCTV/intrusion monitoring, a secure internal cage, and/or 24/7 manned security?
If continuous manned guarding is not mandatory, may OFFEROR satisfy after-hours security through electronic access control, CCTV, alarms, monitoring, and controlled internal storage?
In accordance with the Industry Day Q&A, 24/7 continuous manned on-site guarding is NOT mandatory.
The contractor's warehouse must safeguard Government property from loss, theft, damage, or destruction.
Offerors may satisfy security requirements through commercial best practices, including: (1) an intrusion detection system (IDS) with 24/7 central station monitoring; (2) electronic access control (keycard/cipher badge) on all exterior entryways; (3) CCTV coverage of perimeter doors, loading docks, and interior aisles;
(4) exterior security lighting; and (5) a locked, heavy-gauge wire partition security cage for high-value, sensitive, or pilferable OM&S and PP&E.
37. Please provide available planning information regarding expected item quantities, pallet positions, dimensions, weights, oversized items, receiving/delivery volume, and whether those characteristics are expected to remain generally consistent throughout the contract. Does the Government prescribe a warehouse layout or workflow, or may OFFEROR implement a contractor-designed directed receiving, inspection, Navy ERP receipt, location assignment, put-away, scan-controlled movement, cycle-count, retrieval, QC, outbound staging, delivery, proof-of-delivery, return/restoration, and discrepancy-control process? Please also confirm whether relocation of incumbent inventory into the new contractor warehouse is contractor scope and, if so, whether it occurs within the mobilization period.
In accordance with the Industry Day Q&A, “No current count for pallet spaces. The current warehouse count is approximately 5,500 line items and 240,500 units (includes sizes small to freight). The 100,000 square foot requirement stated in the SOW will accommodate current and future inventory requirements.”
The Offeror may implement a warehouse layout or workflow. Incumbent inventory relocation into the contractor warehouse is contractor scope and expected immediately following the 90-day mobilization period which is the required baseline standard for achieving full operational capability to ensure seamless continuity of operations for Dam Neck.
38. SF 1449, Block 8, states that offers are due on 23 October 2026 at 12:00 PM, while the SAM.gov notice indicates 29 October 2026 at 12:00 PM ET. Please clarify which date and time govern.
The Government has determined that clarifications, administrative reconciliations, and the formal incorporation additional clauses represent material updates to the solicitation that warrant additional proposal preparation time. Therefore, the Government is formally extending the quotation submission closing date from 13 November 2026 to 01 December 2026 at 12:00 PM Eastern Time.
All quotations must be received electronically via SAM.gov no later than the revised closing date and time.
The anticipated award date of 19 February 2027 remains unchanged, while the contract base period of performance has been updated to 24 May 2027 – 23 May 2026, with four (4) additional option years.
39. Please confirm the required proposal submission email address and advise whether any file format, file size, or page limitations apply.
Quotations must be submitted electronically via email to Contract Specialist Curtis Taylor at curtis.d.taylor2.civ@us.navy.mil with a copy to Contracting Officer Ausra Zemaitiene at ausra.zemaitiene.civ@us.navy.mil. All transmissions must reference Solicitation Number N0017826R2500 in the subject line.
File Format: Files must be transmitted in Adobe PDF or Microsoft Office (Word/Excel) format.
File Size: Individual email transmissions should not exceed 20 MB due to DoD email security gateway constraints.
Page Limitations: Under these simplified procedures (FAR Subpart 13.5), the Government does not impose formal page limits, font restrictions, or margin rules. Offerors are instructed to organize submissions cleanly into Volume I (Technical) and Volume II (Price) as set forth in Section 5.A of the solicitation notice.
The Government has determined that clarifications, administrative reconciliations, and the formal incorporation additional clauses represent material updates to the solicitation that warrant additional proposal preparation time. Therefore, the Government is formally extending the quotation submission closing date from 13 November 2026 to 01 December 2026 at 12:00 PM Eastern Time.
40. Section M appears to be blank. The SAM.gov synopsis indicates that award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Please confirm the basis for award and identify the technical information that must be included in the quotation to support the Government's technical acceptability determination.
The inclusion of the heading "Section M – Evaluation Factors for Award" was an administrative artifact from preliminary template drafting and is hereby removed via Amendment 0001. Formal Uniform Contract Format (UCF) Section M evaluation factors do not apply to this procurement.
As stated in the solicitation notice and SF 1449 instructions, this acquisition is conducted under FAR Part 12 and FAR Subpart 13.5 (Simplified Procedures for Certain Commercial Items) utilizing the Lowest Price Technically Acceptable (LPTA) evaluation methodology.
Volume I
Facility Verification: Proposed facility street address (verifying location within 30 miles of Virginia Beach, VA 23461); evidence of site availability within 90 days of Period of Performance start (e.g., deed, executed lease, binding letter of intent, or property availability/commitment letter from the property owner/broker), and facility specifications in accordance with SOW criteria
Evidence of site availability
Staffing & Equipment Capability: The technical evaluation of staffing capability is limited strictly to the qualification and experience verification of the proposed key personnel. No additional staffing narratives, personnel pipeline strategies, or general labor capability descriptions are required or will be evaluated for the non-key labor categories.
Government Property: Required property management system information and any proposed rent-free property use IAW NAVSEA provision L-245-H002.
Security Clearance Verification: Verification of a current SECRET Facility Security Clearance (FCL) (including CAGE code) and personnel clearances, OR a detailed explanation demonstrating that the offeror will have the necessary facility clearance and cleared personnel in place by contract award.
41. Please confirm which resumes must be submitted with the quotation. Attachment J.3 identifies the Warehouse Manager as Key Personnel.
In accordance with Attachment J.3 (Labor Category Qualifications), the Warehouse Manager is designated as Key Personnel. Offerors are instructed to submit a resume for the proposed Warehouse Manager demonstrating compliance with the minimum experience, educational, and operational qualifications set forth in Attachment J.3.
Individual resumes are not required for the remaining labor categories at quotation submission; however, quotations must contain a staffing approach or narrative substantiating the offeror's capability to recruit and provide qualified personnel satisfying all baseline qualifications in Attachment J.3 prior to performance start.
42. Will the Government sponsor a contractor for a SECRET Facility Clearance (FCL)? If so, will sponsorship occur prior to award or upon award?
No. The Government will not sponsor an offeror for an initial Facility Security Clearance (FCL) under this procurement.
43. SOW Section 5.1 states that an FCL is required before performing work involving classified information.
Please clarify whether the FCL is required at proposal submission, at contract award, or prior to the commencement of classified work. Additionally, is a post-award grace period available to obtain the clearance, and would an interim facility clearance be acceptable?
An active SECRET Facility Security Clearance (FCL) is not required at the time of quotation submission, as access to classified information is not required for quote preparation (in accordance with Attachment J.2 DD254_Bidding).
However, an active SECRET FCL is required as a condition of contract award. There is no post-award grace period to obtain an initial facility clearance, as facility security transfer must proceed during the 90-day mobilization window. An interim SECRET Facility Clearance is acceptable at the time of award, provided it is officially granted and active.
44. SOW Section 5.1 and DD Form 254, Block 1b, suggest that no classified material will be safeguarded at the contractor's facility. Please confirm that the contractor's warehouse facility itself is not required to possess a facility clearance. Additionally, please confirm the intended entries for Blocks 10 and 11 of the DD Form 254.
In accordance with the SOW 5.1, “No safeguarding of classified material is authorized at the contractor facility.”
45. SOW Section 3.2 references "facility(s)" and requires "100,000 square feet of total floor space." May this requirement be satisfied through multiple facilities, provided each is located within 30 miles of Dam Neck?
No. As confirmed during Industry Day, the 100,000 square feet is a hard requirement for a single, consolidated warehouse facility. Proposing multiple separate buildings is not acceptable, as it fragments inventory, increases administrative oversight, and defeats the Government's objective of consolidating operations into one centralized location.
46. Please provide the anticipated storage volume, estimated pallet positions, and the quantity of material expected to be transferred at the start of contract performance.
In accordance with the Industry Day Q&A, “The current warehouse count is approximately 5,500 line items and 240,500 units (includes sizes small to freight). The 100,000 square foot requirement stated in the SOW will accommodate current and future inventory requirements.” The transfer of material is not expected until after the 90-day mobilization period which is the required baseline standard for achieving full operational capability to ensure seamless continuity of operations for Dam Neck.
47. FAR Clauses 52.222-41 and 52.222-42, along with an applicable Wage Determination, do not appear to be included in the solicitation. Will a Wage Determination be provided?
Yes, the Service Contract Labor Standards (SCLS) statute applies to the non-exempt service occupations supporting this commercial requirement. The Government is formally incorporating via Amendment 0001, the following:
Wage Determination No. 2015-4341
FAR Clause 52.222-41
FAR Clause 52.222-42
FAR Clause 52.222-43
Offerors are instructed to utilize the wage rates and fringe benefits established in Attachment J.7 when calculating pricing for non-exempt labor categories in their quotations.
48. SF 1449, Block 27a, references FAR Clauses 52.212-3 and 52.212-5 as attached; however, neither clause appears in the solicitation. Please confirm whether these clauses are applicable.
No, FAR Clauses 52.212-3 and 52.212-5 are not applicable and are not included in this solicitation.
The reference in Block 27a of SF 1449 is standard pre-printed form boilerplate. Under current Department of Defense class deviations applicable to commercial acquisitions, both FAR 52.212-3 and FAR 52.212-5 are designated as [Reserved]:
In lieu of FAR 52.212-3, offerors must maintain active representations and certifications electronically in the System for Award Management (SAM.gov) in accordance with FAR 52.204-7.
In lieu of FAR 52.212-5, all applicable statutory and regulatory requirements apply directly as specified in the solicitation terms and conditions, with Department of Labor Wage Determination No. 2015-4341 provided as Attachment J.7.
49. The warranty period identified in Clause C-212-W001 is blank. Please provide the applicable warranty period in months.
Clause C-212-W001 provides for the contractor to insert its standard commercial warranty normally offered in commercial service agreements. For commercial warehousing and material handling services, if no extended warranty is standard, offerors shall insert "12" months (or standard commercial practice).
Government inspection and acceptance rights under FAR 52.212-4 govern all delivered services.
50. Please confirm the required insurance coverages and minimum limits applicable to contractor-owned vehicles and equipment used in performance of the contract.
In accordance with SOW Section 3.8.4, the contractor shall maintain Commercial Automobile Liability insurance with a minimum Combined Single Limit (CSL) of $1,000,000 per accident covering all owned, hired, and non-owned vehicles, and Commercial General Liability with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate. The successful offeror must provide an approved Certificate of Insurance naming the Government as an Additional Insured prior to commencing performance.
51. CLIN 0007 does not appear in the Base Year schedule, and the unit of measure for CLIN 0008 is blank.
Please confirm the intended CLIN structure.
CLIN 0007 is intentionally omitted from the Base Year schedule because there is no Surge CLIN requirement during the Base Year period of performance.
CLIN XXX8 series represents the Contract Data Requirements List (CDRL) data deliverables (corresponding to Exhibit A). In accordance with standard DoD contract writing and pricing procedures, CDRL data CLINs are Not Separately Priced (NSP), and the unit of measure is designated as Lot (LO) (or 1 Lot, NSP).
The pricing for all data deliverables shall be fully burdened and included within the operational service CLINs.
52. Attachment J.3 identifies one Expediter and two Base Year Truck Drivers; however, SOW Section 4.1 does not indicate a work location for the Expediter or the second Truck Driver. Please clarify where these positions are expected to perform their duties.
Material Expediter (1 FTE): Stationed at the Contractor-provided off-site warehouse facility, coordinating material receipts, staging, tagging, and expediting freight movement between the warehouse and Dam Neck.
Medium Truck Drivers (2 FTEs): One (1) driver is stationed primarily at NSWCDD Dam Neck (Government site) to handle on-base material movement; the second (1) driver is stationed at the Contractor off-site warehouse to execute daily drayage runs between the off-site facility, Dam Neck, and external naval installations.
53. The data item numbers identified in the QASP (Attachment J.6) do not appear to align with Exhibit A.
Additionally, the QASP references SOW Section 3.1.12, which does not appear in the SOW. Please confirm the correct references.
QASP has been updated to correct the CDRL and SOW paragraph references.
54. 1449 Block 8 states quotes are due 23 October 2026 at 12:00 PM. The Combined Synopsis/Solicitation states 29 October 2026 no later than 12:00 p.m. EST/EDT. Which date governs, and will the Government confirm it by amendment?
Please refer to Question 38.
55. Section L contains no instructions for quotation format, volume structure, page limits, file format, or method of delivery. Question: Will the Government issue proposal preparation instructions by amendment?
If not, does the Government intend that offerors submit only the content required by FAR 52.212-1(b)?
This acquisition is conducted under FAR Part 12 (Acquisition of Commercial Products and Commercial Services) and FAR Subpart 13.5 (Simplified Procedures for Certain Commercial Items) utilizing the Lowest Price Technically Acceptable (LPTA) evaluation methodology. Formal multi-volume proposals, past performance volumes, and complex Section L/M procedures under FAR Part 15 are not applicable to this procurement.
Offerors are instructed to organize their quotation into two (2) streamlined volumes as follows:
Volume I – Technical Acceptability (Pass/Fail):
Facility Verification: Proposed facility street address (verifying location within 30 miles of Virginia Beach, VA 23461); evidence of site availability within 90 days of Period of Performance start (e.g., deed, executed lease, binding letter of intent, or property availability/commitment letter from the property owner/broker), and facility specifications in accordance with SOW criteria
Evidence of site availability
Staffing & Equipment Capability: The technical evaluation of staffing capability is limited strictly to the qualification and experience verification of the proposed key personnel. No additional staffing narratives, personnel pipeline strategies, or general labor capability descriptions are required or will be evaluated for the non-key labor categories.
Government Property: Required property management system information and any proposed rent-free property use IAW NAVSEA provision L-245-H002.
Security Clearance Verification: Verification of a current SECRET Facility Security Clearance (FCL) (including CAGE code) and personnel clearances, OR a detailed explanation demonstrating that the offeror will have the necessary facility clearance and cleared personnel in place by contract award.
Volume II – Price & Administrative:
Completed SF 1449 / CLIN pricing schedule for base and all option periods.
Signed/acknowledged SF 30 for all solicitation amendments, if applicable.
Supporting commercial pricing data (published catalog prices, commercial pricelists, or recent historical pricing) IAW FAR 13.106-3.
56. To what email address or portal shall quotes be submitted, and what is the maximum attachment size the Government can receive? Will the Government acknowledge receipt?
Quotations must be submitted electronically via email to Contract Specialist Curtis Taylor at curtis.d.taylor2.civ@us.navy.mil with a copy to Contracting Officer Ausra Zemaitiene at ausra.zemaitiene.civ@us.navy.mil. All transmissions must reference Solicitation Number N0017826R2500 in the subject line. Government receipt will be acknowledged.
File Size: Individual email transmissions should not exceed 20 MB due to DoD email security gateway constraints.
57. Section M is titled "Evaluation Factors for Award" but contains no text, and FAR 52.212-2 is not included.
The Combined Synopsis states award will be made on a Lowest Price Technically Acceptable basis. Will the Government issue evaluation factors and the standards for determining technical acceptability by amendment?
The inclusion of the heading "Section M – Evaluation Factors for Award" was an administrative artifact from preliminary template drafting and is hereby removed via Amendment 0001. Formal Uniform Contract Format (UCF) Section M evaluation factors do not apply to this procurement.
As stated in the solicitation notice and SF 1449 instructions, this acquisition is conducted under FAR Part 12 and FAR Subpart 13.5 (Simplified Procedures for Certain Commercial Items) utilizing the Lowest Price Technically Acceptable (LPTA) evaluation methodology.
58. The synopsis states that quotations taking exception to the terms and conditions will be rejected. Given that Sections L and M are incomplete, will the Government confirm that an offeror's request for clarification does not constitute an exception?
The inclusion of the heading "Section M – Evaluation Factors for Award" was an administrative artifact from preliminary template drafting and is hereby removed via Amendment 0001. Formal Uniform Contract Format (UCF) Section M evaluation factors do not apply to this procurement.
As stated in the solicitation notice and SF 1449 instructions, this acquisition is conducted under FAR Part 12 and FAR Subpart 13.5 (Simplified Procedures for Certain Commercial Items) utilizing the Lowest Price Technically Acceptable (LPTA) evaluation methodology.
59. The Government anticipates award by 19 February 2027 with performance beginning 21 February 2027.
Will the Government extend the quotation due date if amendments materially change the requirement or the pricing structure?
The Government has determined that clarifications, administrative reconciliations, and the formal incorporation additional clauses represent material updates to the solicitation that warrant additional proposal preparation time. Therefore, the Government is formally extending the quotation submission closing date from 13 November 2026 to 01 December 2026 at 12:00 PM Eastern Time.
The anticipated award date of 19 February 2027 remains unchanged, while the contract base period of performance has been updated to 24 May 2027 – 23 May 2026, with four (4) additional option years.
60. The synopsis directs that all costs be included in the quoted price "as separate line items," including warehousing storage, handling, freight, local drayage, and facility operating costs. Section B contains only labor CLINs plus a Tech Data/CDRL CLIN. May offerors add CLINs for facility, MHE, and vehicles, or does the Government require those costs to be amortized into the six labor CLINs?
Offerors shall not create, add, or alter Contract Line Item Numbers (CLINs). Offerors must submit their pricing strictly utilizing the established CLIN structure set forth in Section B of the SF 1449 / CLIN pricing schedule.
Any prior reference in synopsis text regarding separate line items is superseded by the established Section B CLIN structure. All contractor-provided facility lease/operating costs, utility expenses, racking, Material Handling Equipment (MHE), vehicles, fuel, insurance, drayage transport, and associated overhead/management must be fully burdened and amortized into the established operational labor CLINs as structured in Section B.
Quotations that add unapproved CLINs or condition pricing on separate, unestablished cost elements may be deemed non-compliant and excluded from evaluation.
61. The Tech Data/CDRL CLINs show no quantity or unit. Shall offerors price these CLINs, or enter them as Not Separately Priced?
Not Separately Priced.
62. The SOW requires intermittent task-based support at NWS Yorktown, NSA Northwest Annex, and NS Norfolk, but the solicitation contains no travel CLIN and no ODC provision.