Vendor_Questions.docx

DOCX document 18 KB Posted

Attached to
Hardware Components for the ASM Hand Grenades Federal contract opportunity
Solicitation number
N00174-18-R-0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Questions from Vendors

View the file

Other files for this federal contract opportunity

Other files attached to Hardware Components for the ASM Hand Grenades, newest first.
File Type Posted
18R0005_0002.docx DOCX document
N00174-18-R-0005_ASM_Grenade_Attachments.pdf PDF
N00174-18-R-0005_ASM_Grenade_3-23.pdf PDF
18R0005_Amd_1.docx DOCX document
18R0005_Amendment_1.docx DOCX document
Drawing_430-174-0013_Rev_E.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00174-18-R-0005 ASM Hand Grenades – QUESTIONS FROM VENDORS

1. Pg 18, SOW Para 2.0 Required Documents: When comparing the drawings under Method 2, it says to use Rev-D. When looking at the drawings provided, it appears that the drawing, Doc 430-174-00013, is Rev-E.

The other question is about Pressurized testing requirement. [The Vendor] cannot find a Mil-Spec, or some sort of specification that details the parameters of the test.

ANSWERS: (Revised documents uploaded to FBO.GOV)

- Pg 18, Para 2.0 Documents: Method I for Body and Cap Assembly should read, "430-174-0013 REV D"; Method II Body and Cap Assembly should read, "430-174-0013 REV E"

- In the Technical drawing attachment, Pg 9 Body and Cap Assembly is actually the REV E copy; the Government is in the process of updating that drawing to correct the drawing to read "E" instead of "D".

- For pressure testing, the p.s.i. requirements are listed in the 'Notes:' on the appropriate drawings in the technical package. REV D is 15 p.s.i. for a minimum of 5 seconds; and REV E is 30 p.s.i. for a minimum of 5 seconds.

2. I see these drawings are from +-2006. For planning/cost purposes will they be available on cad; If so what format?

Or will we have to recreate the electronic versions to make them machine ready?

ANSWERS:

The drawing files are in ProE/Creo. The files could be provided during the solicitation process upon request. However, it may take some time to prepare them as they are held in CAD/PAD and may be difficult to get quickly. We are working to have copies available as of the time of this Amendment.

In all cases, the files can be provided as Pro files or converted to a standard file type, i.e. stl or step.