18R0005_0002.docx

DOCX document 35 KB Posted

Attached to
Hardware Components for the ASM Hand Grenades Federal contract opportunity
Solicitation number
N00174-18-R-0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0002 and additional Questions from Offerors

View the file

Other files for this federal contract opportunity

Other files attached to Hardware Components for the ASM Hand Grenades, newest first.
File Type Posted
N00174-18-R-0005_ASM_Grenade_Attachments.pdf PDF
N00174-18-R-0005_ASM_Grenade_3-23.pdf PDF
18R0005_Amd_1.docx DOCX document
Drawing_430-174-0013_Rev_E.pdf PDF
Vendor_Questions.docx DOCX document
18R0005_Amendment_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0017418R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SUMMARY OF CHANGES

1. SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed to 10-May-2018 01:00 PM Eastern Standard Time.

2. The following additional Questions and Answers are hereby provided:

1. Drawing Numbers 430-174-0006 & 430-174-0007 both call out a helical groove (similar to a thread) of 40 pitch with a depth of .005” ± .002” throughout the diameter. What would be the preferred inspection method? Optical comparator? Dedicated gage similar to a thread gage?

Ref: Drawing Numbers 430-174-0006 & 430-174-0007

ANSWER: Up to the offeror to make recommendation of how they will inspect the part.

1. The Contractor shall provide inspection/test results for each hardware component which shall include dimensional data for units measured during production, but 100% dimensional verification shall be performed on a minimum of every 10th parts. 100% inspection on all parts is not required, but will the critical dimensions that need to be provided on each part be specified by the Government prior to the contract award?

Ref: Section 3.2.2.1 on page 21 & Section 4.0 on page 22

ANSWER: All dimensions called out on the drawings shall be verified as part of the inspection of every 10th part.

1. Does the pressure testing requirement include the small Ø.126 hole on the upper neck or only for the body and bottom cap?

Ref: Pressure Testing Requirement

ANSWER: The pressure testing requirement does not include the small hole on the upper neck and is only for the body and bottom cap.

1. Please confirm if the pressure testing requirement is a dry air pressure test, and not a water, or a submersion bubble test.

Ref: Pressure Testing Requirement

ANSWER: Requirement is for dry air pressure testing on 100% of the units.

3. For further information regarding this amendment please contact Larry Connell at 301-744-6641 or lawrence.connell@navy.mil.