This solicitation seeks research and development services for the Naval Research Laboratory Space Sciences Division. The services include technical support for the design, fabrication, assembly, testing, calibration, and field operations of experiments, scientific instruments, payloads, and related equipment. Tasks involve computer modeling, experiment design, data analysis, instrument packaging, payload testing, and field deployments. Data analysis services are also required for information obtained from these investigations. Software development and modification services must be provided. Scientific instrument modeling, simulation, development, data acquisition, reduction, and analysis efforts include geospace science and technology investigations, high energy space environment investigations, and solar and heliospheric physics investigations. The period of performance is 60 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00173-21-R-NA03 QA 7.30.2021.pdf | ||
| N00173-21-R-NA03-0002 Conformed.pdf | ||
| Att. J-3 - Personnel Qualifications REVISED.pdf | ||
| N00173-21-R-NA03-0002.pdf | ||
| Exhibit A REVISED.pdf | ||
| N00173-21-R-NA03 QA 7.16.2021.pdf | ||
| N00173-21-R-NA03-0001.pdf | ||
| N00173-R-NA03-0001 Conformed.pdf | ||
| J-3 Personnel Qualifications.pdf | ||
| N00173-21-R-NA03.pdf | ||
| J-7 PPQuestionnaire.pdf | ||
| J-9 - Offeror Questions Submittal Form.xls | XLS spreadsheet | |
| Exhibit A.pdf | ||
| J-8 Cost Proposal Format.XLSX | XLSX spreadsheet | |
| J-5 DD254.pdf | ||
| J-6 Requirements for Onsite Contractors.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question
Name of Document Affected
Affected Section, Page, and Paragraph
Question Answer
10 RFP &
Attachment J-3
L-6 VOLUME IV -
COST
PROPOSAL
Table 4 - LCATs, Skill Mix and Labor Hours, page 79 para 3, and Attachment J-
3 "Personnal Qualifications"
Para 3 states "If the Offeror uses labor category terminology different than those included below and as defined in Attachment J-3, Personnel Qualifications, the Offeror must provide a matrix clearly relating their proposed labor categories to those included in Attachment J-3. All Offeror proposed labor categories differing from those below must meet the personnel qualifications outlined in Attachment J- 3." The following labor categories identified in Table 4 are not identified and explained in Attachment J-3:
Engineer, Hardware; Senior Project Anaylst; Junior Research Physicist; Junior Engineering Technician;
Senior Technical Writer; Off-Site Financial Management.
Q: Will the Government provide the additional labor categories in an updated Attachment J-3, and align labor category decriptions where there are discrepancies between Table 4 and Attachment J-3, such as between "Mechanical Engineer, General Design Support" (Table 4) and " Mechanical Engineering Technician, General Design Support" (J- 3)?
Both Attachment J-3, Personnel Qualifications, and Table 4 - LCATS, Skill Mix, and Labor Hours, have been revised. Please see Att. J-3, Personnel Qualifications (Revised) and Amendment 0002.
QUESTIONS & ANSWERS, JULY 22, 2021
N00173-21-R-NA03
RFP
Attachment J-3 - Personnel
Qualifications
Section L-6 (1), Pages 78 and 79, "Table 4 -
LCATS, Skill Mix and Labor Hours"
"Attachment J-3 - Personnel
Qualifications"
Table 4 - LCATS, Skill Mix and Labor Hours provides the required labor categories and numbers of hours to be proposed by labor category for each year of the contract. Attachment J-3 provides the Personnel Qualifications for each required labor category.
Q: The labor categories in Table 4 of Section L-6 differ from the labor categories provided in Attachment J-3- Personnel Qualifications. Table 4 includes categories not on J-3, and vice versa. Can the Government please provide clarification on the labor categories and personnel qualifications required for this effort, and provide an updated Table 4 and/or Attachement J- 3, if appropriate?
Table 4 reflects "Engineer, Parts Procurement (Key), whereas Attachment J-3 reflects "Senior Engineer, Parts Procurement (Key)"; Table 4 reflects "Mechanical Engineer General Design", whereas Attachment J-3 reflects "Mechanical Engineering Technician, General Design Support".
Table 4 includes the following categories that are not on Attachment J-3: Engineer, Hardware; Senior Project Analyst; Junior Research Physicist; Junior Engineering Technician; Senior Technical Writer; and Off-Site Financial Management.
Attachment J-3 includes the following categories that are not on Table 4: Senior Systems Engineer; and Project Assistant.
See answer above.
12 RFP
Section L-2, "Proposal Organization" and Page 72 "Subfactor 2:
Personnel Qualifications"
Subfactor 2: Personnel Qualifications on Page 72 states, "The Offeror shall provide all key personnel in accordance with Attachment J-3, Personnel Qualifications. The Offeror's proposal shall document the following, specifically: 1) The experience of all proposed key personnell...4) The proposed key personnel's ability to span the entire duration of the requirement (60 months)."
Q: Per Subfactor 2, the above documentation regarding personnel qualifications for key personnel is required in Volume I - Technical Proposal. However, the Proposal Organization table on Page 68 of the RFP does not include Subfactor 2: Personnel Qualifications in the organization of the Technical Proposal, nor does it provide a page limit for the Personnel Qualifications section. Could the Government please specify where in the Technical Volume Subfactor 2 should be addressed, and the page limit for this documentation?
The Proposal Organization table has been updated. See Amendment 0002.
Subfactor 1, Technical Understanding, has a 10 page limit. Subfactor 2, Personnel Qualifications, also has a 10 page limit, however, please note the particulars within the Page Count paragraph (2) of Section L.
File details come from the government source that posted it. Updated .