N00173-21-R-NA03 QA 7.22.2021.pdf

PDF 69 KB Posted

Attached to
Research & Development (R&D) Services for the Naval Research Laboratory Space Sciences Division
Solicitation number
N00173-21-R-NA03
Issued by

About this file

This solicitation seeks research and development services for the Naval Research Laboratory Space Sciences Division. The services include technical support for the design, fabrication, assembly, testing, calibration, and field operations of experiments, scientific instruments, payloads, and related equipment. Tasks involve computer modeling, experiment design, data analysis, instrument packaging, payload testing, and field deployments. Data analysis services are also required for information obtained from these investigations. Software development and modification services must be provided. Scientific instrument modeling, simulation, development, data acquisition, reduction, and analysis efforts include geospace science and technology investigations, high energy space environment investigations, and solar and heliospheric physics investigations. The period of performance is 60 months.

View the file

Other files

File Type Posted
N00173-21-R-NA03 QA 7.30.2021.pdf PDF
N00173-21-R-NA03-0002 Conformed.pdf PDF
Att. J-3 - Personnel Qualifications REVISED.pdf PDF
N00173-21-R-NA03-0002.pdf PDF
Exhibit A REVISED.pdf PDF
N00173-21-R-NA03 QA 7.16.2021.pdf PDF
N00173-21-R-NA03-0001.pdf PDF
N00173-R-NA03-0001 Conformed.pdf PDF
J-3 Personnel Qualifications.pdf PDF
N00173-21-R-NA03.pdf PDF
J-7 PPQuestionnaire.pdf PDF
J-9 - Offeror Questions Submittal Form.xls XLS spreadsheet
Exhibit A.pdf PDF
J-8 Cost Proposal Format.XLSX XLSX spreadsheet
J-5 DD254.pdf PDF
J-6 Requirements for Onsite Contractors.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question

Name of Document Affected

Affected Section, Page, and Paragraph

Question Answer

10 RFP &

Attachment J-3

L-6 VOLUME IV -

COST

PROPOSAL

Table 4 - LCATs, Skill Mix and Labor Hours, page 79 para 3, and Attachment J-

3 "Personnal Qualifications"

Para 3 states "If the Offeror uses labor category terminology different than those included below and as defined in Attachment J-3, Personnel Qualifications, the Offeror must provide a matrix clearly relating their proposed labor categories to those included in Attachment J-3. All Offeror proposed labor categories differing from those below must meet the personnel qualifications outlined in Attachment J- 3." The following labor categories identified in Table 4 are not identified and explained in Attachment J-3:

Engineer, Hardware; Senior Project Anaylst; Junior Research Physicist; Junior Engineering Technician;

Senior Technical Writer; Off-Site Financial Management.

Q: Will the Government provide the additional labor categories in an updated Attachment J-3, and align labor category decriptions where there are discrepancies between Table 4 and Attachment J-3, such as between "Mechanical Engineer, General Design Support" (Table 4) and " Mechanical Engineering Technician, General Design Support" (J- 3)?

Both Attachment J-3, Personnel Qualifications, and Table 4 - LCATS, Skill Mix, and Labor Hours, have been revised. Please see Att. J-3, Personnel Qualifications (Revised) and Amendment 0002.

QUESTIONS & ANSWERS, JULY 22, 2021

N00173-21-R-NA03

RFP

Attachment J-3 - Personnel

Qualifications

Section L-6 (1), Pages 78 and 79, "Table 4 -

LCATS, Skill Mix and Labor Hours"

"Attachment J-3 - Personnel

Qualifications"

Table 4 - LCATS, Skill Mix and Labor Hours provides the required labor categories and numbers of hours to be proposed by labor category for each year of the contract. Attachment J-3 provides the Personnel Qualifications for each required labor category.

Q: The labor categories in Table 4 of Section L-6 differ from the labor categories provided in Attachment J-3- Personnel Qualifications. Table 4 includes categories not on J-3, and vice versa. Can the Government please provide clarification on the labor categories and personnel qualifications required for this effort, and provide an updated Table 4 and/or Attachement J- 3, if appropriate?

Table 4 reflects "Engineer, Parts Procurement (Key), whereas Attachment J-3 reflects "Senior Engineer, Parts Procurement (Key)"; Table 4 reflects "Mechanical Engineer General Design", whereas Attachment J-3 reflects "Mechanical Engineering Technician, General Design Support".

Table 4 includes the following categories that are not on Attachment J-3: Engineer, Hardware; Senior Project Analyst; Junior Research Physicist; Junior Engineering Technician; Senior Technical Writer; and Off-Site Financial Management.

Attachment J-3 includes the following categories that are not on Table 4: Senior Systems Engineer; and Project Assistant.

See answer above.

12 RFP

Section L-2, "Proposal Organization" and Page 72 "Subfactor 2:

Personnel Qualifications"

Subfactor 2: Personnel Qualifications on Page 72 states, "The Offeror shall provide all key personnel in accordance with Attachment J-3, Personnel Qualifications. The Offeror's proposal shall document the following, specifically: 1) The experience of all proposed key personnell...4) The proposed key personnel's ability to span the entire duration of the requirement (60 months)."

Q: Per Subfactor 2, the above documentation regarding personnel qualifications for key personnel is required in Volume I - Technical Proposal. However, the Proposal Organization table on Page 68 of the RFP does not include Subfactor 2: Personnel Qualifications in the organization of the Technical Proposal, nor does it provide a page limit for the Personnel Qualifications section. Could the Government please specify where in the Technical Volume Subfactor 2 should be addressed, and the page limit for this documentation?

The Proposal Organization table has been updated. See Amendment 0002.

Subfactor 1, Technical Understanding, has a 10 page limit. Subfactor 2, Personnel Qualifications, also has a 10 page limit, however, please note the particulars within the Page Count paragraph (2) of Section L.

File details come from the government source that posted it. Updated .